Loading...
HomeMy WebLinkAboutDrain Layers Permit 29 Hazel Street TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER' S PERMIT19 19_ r Pursuant to written application, permission is hereby granted to the Licensed rain Layer_ "med herein to perform the work ' in cat' below at i f 9 at premises owned by u" �' '^ - whose address i Sand to Lay House Drai, , Repair House Drain, Lay Main, Other , for I I /;._;;- .,v /=_)�,,r;t occupancy or use, with Family Units , with acres. , - Type of Sewage to ,be connected under this permit : SANITARY SEWAGE , INDUSTRIAL WASTES ( ) , OR ( ) Connection will be made with 77 77,77 Show sketch of proposed work or furnish 'two (2) copies of separate drawings. ' P , SPECIAL CONDITIONS OSHA REQUIREMENTS MUST BE FOLLOWED Desired Starting Date r �?_,� , �� Estimated Time fo CompletionT t, Permit to be issued to k,(� the holder of Drain Layer 's License No. Permit will expire thirty (30) days after date of issuance. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the; permit and t e ieverse side thereof. Applicant has received Town Permit No. CHD Permit No. Signed icen ed r in Layer The above named Drain Layer has a valid 1�icense` isdu_Pd---6y the State of Connecticut and has filed a satisfactory b nd and insurance policy in the name of the Town of South Windsor: nu Jn ine r g Dept. Date Permit Fee Paid $ �' ' Oc) Check. tuber S Connection Charge Receipt No. :44( Dated 14 -3 Issued by INSPECTION Date work started - 2 6- �� Date completed l� 7 Sufficient notification receives: es No Special Conditions APPROVED: Z _9? 1 Spector Date TOWN OF SOUTH WINDSOR SANITARY SEWER INSPECTION CHECKLIST FUNCTION NO YES N/A DATE INSPECTED 1 . Is Permit On Job Site 2 . Police Notified —ice 3 . Safety Items In Place / -170,� a. Shoring, Trench Box, Ladder b. Hard Hats J c . Pumps _ 4 . Proper Material a. Pipe ---- - - - - ---- -- -- b. Pipe Bedding C . Backfill d. Warning Tape e. Pipe Cap or Plug _ f . Cleanouts g. Fittings ox h. Manhole -- i. Cover & Frame 5 . Existing Lateral Cap Removed /( in Presence of Inspector 6 . Lateral probed and found to be clear 7 . Pavement Cut Properly 8 . Trench & Bedding OK _ 9 . Joints Properly Done 10 . Backfilling (12" Lifts ) & Compaction 11 . Manhole Inverts Built 12 . Subbase Material Placed 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test 16 . Mandrel Test 17 . Installation agrees with plan 18 . As-Built plans recorded