Loading...
HomeMy WebLinkAboutDrain Layers Permit 40 Grandview Terrace 6398 TOWN OF SOUTH WINDSOR DEPARTMENT OFIYBL-IC WORKS BUREAU,OF POLLUTION CONTROL DRAIN LAYER'S PERMIT DATE:__ 3�i9/x Pursuant to written app/icadon, permissi n le der y granted to the License9�Drain Layer named herein to Perform work d •4�{j / /y{ Lot# "t as indicated be%w, of Premises owned by whose address is 17fY �IICM 12.0 f to Lay House Drain A Repair House Drain . Lay Main , Other. or and occupancy or use, with acres. Type of Sewage to be connected under this permit.• SANITARY SEWAGE. INDUSTRIAL W;�STES O,OR O Connection wi//be made with C A C .. A// work to be in accordance with Town of South Windsor standards, al/OSHA requirements and the conditions indicated on the back of this permit Proposed start date -r 1 46 Estimated time for completion 4;? 1( Permit is to be issued to the holder of Drain Layer's Y s license No. Only holders of P7, P7 & W9 licenses will be issued permit. Permit will am.re Wiv M) days after date of issuance The undersigned Drain Laye h reby agrees to"all the terms and conditions set fo / the Permit and the reverse side thereof. App/ican' h s received Town Stre Ex on Permit No. and/or ConnDOT Permit No. Signed < censed Drain Layer FOR TOWN USE Oft Y Perm/t fee Paid S -oD c� (Check No.) Y N Connec"o -Charge S A _(Receiptl- -- Dated 3 Insurance on File ( ( ) Bond on File (-/ O This Penn it a hereby asued to the above named Drain Layer who has a valid A license issued by the State of G�ectft W and has on file,satisfactory bond intertown Agreement Premises Agsubreeeeme ct to and/nsurMnae in the name of the Town of South Windsor. O Record of Sewer Assessment ( 1O Issued by Date �� INSPECTION Date Work Started Date 'Completed Comments - APPROVED: nspectoroo0' Date SANITARY LATERAL & EXCAVATION PERMIT INSPECTION REQUEST DATE OF REQUEST: TIME: BY: _7- r , ��.. T - FOR LOCATION: �O� DAY INSPEC. NEEDED TIME: TYPE OF INSPECTION: ( � ) SANITARY/LATERAL (PERMIT NO. FOOTING DRAIN ( ) EXCAVATION {PERMIT NO. ) ( ) OTHER INSPECTION REPORT DATE: TIME: �_!S- a ra 'moo INSP• CONTRACTOR: WEATHER: ys' ' o� c�s�,•s`-�✓d¢ WORK IN PROGRESS: _ �oit/ir/cc`CT TO f�OG�,� O AREA OF CONCERN: SPECIAL INSTRUCTIONS:_ �ea�-i,✓6 dt-pia/ �Gs �- os,.�� L ��