Loading...
HomeMy WebLinkAboutDrain Layers Permit 887 Foster Street ' 6424 TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT DATE: S Pursuant to written a�Qlication permission i hereby ranted to the Licensed Drain LayerLined rein to perform work at �"� , Lot# as indicated below, at premises owned by MA rZ,I o` G/t2a uX whose address is < A-h and to Lay House Drain -�•, Repair House Drain Lay Main Other , for occupancy or use, with acres. Type of Se"wage to be connected under thi permit. AN/TARY.SE O, OR O , /NDUSTR/A TWA TES(h onnection will be made with 4 Ail work to be in:accordance with Town of South Windsor standards, a//OSHA requirements and'theconditions indicated on.the back of this permit. Proposed start date 3 a Estimated dyne for comp/edon Permit is to be issued to.ro 1.,A Ca^,) � � l A C the holder of Drain Layer's License No. Only holders of P1, P7 & W9 licenses will be issued permit. Permit will ex oire thirty (301 days after date of.issuance. The undersigned Drain Layer hereby agrees to`aff Pe, terms and conditions set forth in the permit and the reverse side thereof p l/cat has received To treat Excavation Permit No. and/or ConnDOT Permit No. Signed Lic red in ayes FOR TOWN USE Oft Y Permit Fee Paid$9 5 (Check No.) I�rc•' C��t2 Y N Connection Charge $ (:Qa O u (Receipt No.l Dated• Insurance on File (+/f( I Bond on File C,4( I This permit is hereby issued to the above named Drain Layer who has a valid license issued by the State of Connecticut and has or file,satisfactory bond Premises subject to and insurance in the name of the Town of South Windsor. lntertownAgreement ( l ( 1 Record of Sewer Assessment _ . . . lesua b Date --y -s<- 1-01 INSPECTION Date-Work Started 1; C / _ Date Completed Comments APPROVED: Insp or Date . SANITARY LATERAL & EXCAVATION PERMIT INSPECTION REQUEST DATE OF REQUEST: TIME: BY: FOR LOCATION: DAY INSPEC. NEEDED TIME: TYPE OF INSPECTION: SANITARY/LATERAL (PERMIT NO. GY0 ) ( ) FOOTING DRAIN ( ) EXCAVATION (PERMIT NO. ) ( ) OTHER INSPECTION REPORT DATE: TIME: INSP• a- CONTRACTOR: WEATHER: WORK IN PROGRESS: O ee 5!'ZS .o/'A iF°✓�s %-o �r Cc9 s-rP� eS'` s-=r,--- AREA OF CONCERN: SPECIAL INSTRUCTIONS: