Loading...
HomeMy WebLinkAboutDrain Layers Permit 79 Dower Road ..... 'OWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT ` N o 5819 A' , 19 Pursuant to written application, permission is hereby granted to the Licensed Drain Layer named herein to perform the work indicated below at 71 `�j 6ari/=TZ / p at premises owned by 77M Si1,1 // R whose address is 79f <-,?060�2. ,-;-v7- 5% w" N and to Lay House Drain, >' Repair House Drain, Lay Main, Other , for NGc c_- r c Y -occupancy or use, with Family Units , with acres . Type of Sewage to be connected under this permit : SANITARY SEWAGE (; , INDUSTRIAL WASTES ( ) , OR ( ) Connection will be made with Show sketch of proposed work or furnish two (2) copies of separate drawings . SPECIAL CONDITIONS Desired Starting Date FIz z. Estimated Time for Completion Permit to be issued to the holder of Drain Layer ' s License No. __V0 77,�-- Permit will expire thirty (30) days after date of issuance. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and the reverse side thereof . Applicant has received Town Permit No . ,V and/or CHD Permit No . Signed g Lice�ised Drain' Layer / The above named Drain Layer has a valid license issued by the State of Connecticut and has filed a satisfactory bond and insurance policy in the name of the Town of South Windsor : Engineering Dept . Date Permit Fee Paid $ ,7 6--- Check Number 3J Connection Charge Receipt No . .j Dated ' /,q'(7 Issued by INSPECTION Date work started 8 /?.� `OJ7/ / Date completed Sufficient notification recel.ve : es No Special Conditions APPROVED: Inspector Date t a ti m 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 SOR-c AREA CODE 203/644-25U Fax.# - 203/644-3781 FACSIMILE MESSAGE TRANSMITTAL FORM Date: August 17 , 1992 PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: Sandra Stolarz ADDRESS: FAX. # 243-7503 MESSAGE FROM: NAME; Joyce ADDRESS: Engineering Department MESSAGE Attached is a copy of our "Drain Layer' s Permit" taken out on August 10, 1992 to connect 79 Dower Road to the Sanitary Sewer System. Said connection was inspectEd,: by Town on August 12 , 1992. All necessary fees have been paid. NUMBER OF PAGES' TO FOLLOW: �_