HomeMy WebLinkAboutDrain Layers Permit 285 Deming Street I
TOWN OF SOUTH WINDSOR INSPECTION REPORT
Okit No. 6457 Contractor STADDLE BROOK DEVELOPMENT
Loy tion 0285 DEMING STREET Address RT 207
T Work NEW SAN LAT LEBANON CT 06249
Phone:No. (860 )642-6310
Date Insp Needed 1-114AV, C Date T!lsP
Time Insp Needed Time Ir1sp i� 9v `ifs Z .Zo-z-3a I
Inspected By >' Ls�`�`.r/�-
Work in Progress oa ./ ' 3'r ,b /.�`�-a .,�i�.� :�ii�� .mot®.�y.,f�:� /. �e�• �
��rl� Pi�Gr 1'!� !B>✓�� �L.a �C9 Tfi 1'✓c�G� J�Lc7 6✓ �G: °'���t'sr��.o/y•
CC�/�d6-LL Y s s�i./� -�G l $'i'zJ►aae'' 'f O ToT� i' �J�� . :r�4 T6� .�.Ar�s c�i� -5, .4te�
rG
f !� 4 �s /?� ✓� .� ZO �(�/� j�r�� CLE'�i�/4UT !.'is.G
Input Date -t-3
i
Peft, it No. 6457 Town of South` Windsor, CT
Pel-irit Date 07/12/1996 Drain Layer Permit
Exp11ration Date 08/11 /1996
De4crip :
Applicant Location
Name STADDLE BROOK DEVELOPMENT ;Aidr . 'G285 DEMING STREET
Addr .. RT 207 • Quarter- VETLLEUX LOUISETTE
LEBANON CT 06,49
Phone No. (860)642-6310
The Drain Layer assigneaq this perm1t has a va1' d +sense issued by the
state and hereby agrees t«. s,11` the terMS and corZ�i:t7ons set forth in the
attached ' Conditions . �A1 1 �Wor•k shall -"bel i h . acc I: dance with Town of South
Windsor standards, all OSHA,' rrequirements and the' att ched conditions.
Issued By
Date Inspected ---�� 1�1- -- �-- �1tnp Y
"ected --
6457
TOWN OF SOUTH WINDSOR
DEPARTMENT OF PUBLIC WORKS
BUREAU OF POLLUTION CONTROL
DRAIN LAYER'S P
DATE: l0/146`
Pursuant to written a lication permission is he by granted to the Licensed Drain Layer named herein to
perform work at I -2h7 � Lot# / as indicated below,at
premises owned bya2e& whose address is P_
—M I ri S'r and
to Lay House Drain , Repair Hou a Drain , Lay Main' , Other for
occupancy or use, with. 0. acres.
Type of Sewage to be connected under this peim/t•- BA�M .'
INDLSTR,IW W . TES(I,
OR f J onn ' with'4. �� C✓ All
work to be imaccordance with Town of South Windsor standards, a//OSHA requirements and thecondidons
indicated.on.the back of this permit.
Proposed start date /? Estimated time for completion 2.
Permit Is to'.be.issued to // the holder of Drain Layer's License No.
�b Only holders,of P 11 01& W9_Ikenses will be issued permit.. permit will exyire thirty- (3b)
days-after date of issuance. The undersigned Drain Layer hereby agrees to a//the terms and conditions set
orth in tine:permit and the reverse side thereof. Applicant has recei .e TO n Street Excavation Permit No.
aril/,or.ConnD6T Permit No.
Signed
Ucense&orain Layer
FOR TOWN USE OK Y
' Permit Fee Paid$ ?S. 0 0 (Check No.)
4
Y N Connection Charge S 4-40. 00 (Receipt No.f-_d-V 5" Dated r /
{
Insurance on File
Bond on File (r/J r I This permit is hereby issued to the above named Drain Layer who has a valid
license issued by the State of Connecd3cut and has on_h7e,sa tis ofwy bond
Premises subject to and insurance in the name of the Town of South Mndw.
Intertown Agreement ( I (✓1� ,�
Record of Sewer:
Assessment ( I ( 1 Issued b� � �.•�/�..• .. ,�• Date > lx �!
INSPECTION
Date Work Started 7 Aa Zex Date Completed 7�jz�96
Comments _7..-�-
APPROVED:
/risT94,(
-r-�Inspec r Dates