Loading...
HomeMy WebLinkAboutDrain Layers Permit 10 Debbie Drive 6318 ,,;TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT DATE: Pursuant to written application,permis is hereby ranted o the Licen ed Drain Layer named herein to perform work at 0 s Lot#Z_1r as indicated below. atl premises owned by '' h se address is S- and to Lay House.Drain , Rep Zr House Drain Lay Main , Other for 1/7 occupancy or use,`with acres. Type of Sewage to be connected under this permit.•S N/TARY SEINAOE INDUSTRIAL;WASTES(J, OR O rrnection M be made with S�"hi 3 S All work to be in accordance with Town of South Windsor s ards, a#OSHA requirements and the conditions indicated on the back of this°permit. Proposed start date g - Ema�d tim completion ` - .— Permit is to,be issued to 70 V - e holder of Drain 4ayer's License No Only holders of P1, P7 & W9 licen will ed permit. . Permit will exoire thirtK(30) days after date of issuance. The undersigned Drain er a grass Wall the terms and conditions set forth in the permit and the,ieverse.side thereof. App nt he eV, T n Street Excavation Permit No. and/or ConnDOT Permit No. Signed `" 37 =in Layer FOR TOWN USE Oft Y Permit Fee Paid S •4a (Check No.) Ogs lz c -6 I S Y N Connection Charge $1 USR.(Receipt No.) � Dated Insurance on File Bond on File (jQ ( J This permit is hereby issued to the above flamed Drain Layer who has a valid license issued by the State of Connecticut and has on file;satisfactory bond Premises subject to and insurance in the name of the Town of South Windsor. Intertown Agreement Record of Sewer Assessment Issued b Date fl ( J y INSPECTION q q Date Work Started 3D`-g S Date Completed Comments APPROVED nspector Dam -,r SANITARY LATERAL & EXCAVATION PERMIT Y' INSPECTION REQUEST DATE OF REQUEST: 5o '-3 S TIME:_ F BY: # FOR LOCATION: lig r DAY INSPEC. NEEDED �� 3 d 5s TIME: �� f , TYPE OF INSPECTION: ( � SANITARY/LATERAL (PERMIT NO. ) ( } FOOTING DRAIN ( ) EXCAVATION (PERMIT NO. ) ( ) OTHER INSPECTION REPORT DATE: Q - S TIME: M "Llij IN P: CONTRACTOR: T44 WEATHER: ° WORK IN PROGRESS: r J ' AREA OF CONCERN: SPECIAL INSTRUCTIONS: /