Loading...
HomeMy WebLinkAboutDrain Layers Permit 65 Cody Circle .. ., ....,a,�r-a r:xcag�.; 7's.•ma•.'^t'_-.cgr.'^.7.�fFT , .... - r TOWN OF SOUTH Wi N DSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT - No153, , Pursuant to written application, permission :is hereby granted _to the Licensed Drain Layer named herein to perform the work ` indicated, _below at,.: .. - Z A,/ Ce i`Z at premises 'owned by C,[/¢�P�tG 2, 50% whose address is . ,4— C./ d to Lay Hou a Dn in, Repair House Drain, L' Main,. Other for occupancy or, u' , with 3/111,1•� Famil its with acres. Type of Sewage to be connected under this perm`"' : SANITARY SEWAGE INDUSTRIAL WASTES ( ) . OR ( ) Connection will be made with .3,T rni he Show sketch of proposed work or furnish 'two (2) copies of separate drawings. OSHA REQUIREME�iTTS UST BE F LOWED SPECIAL CONDITIONS G O Desired Starting Date Estimated Time for Complet_i'on Permit to be issued to the holder of Drain Layer ' s License No. Permit will expire thirty {30) days after date of .issuatce. The undersigned Drain Layer hereby agrees to all the terms and conditions set . f.orth in the permit and the reverse side 3t ereof . Applicant has received Town Permit No. and/or,I,: CD Permit No. — Signed Lic ed ain Layer The above named Drain Layer has a vali license _is. ued by the State of (' Connecticut and has filed a satisfactory bond and insurance . policy .in the name of the Town of. South Windsor : Engineering Dept. - -Date Permit Fee Paid $ ZS Check Number �y Connection Charge Receipt No. Dated '7tlAl Issued: by3� INSPECTION Date work started Date completed (_-t �.. Sufficient notific—aTion eceiv* a: _� 'Yes No Spectal Conditions APPROVE Inspector ��.Date r SANITARY LATERAL & EXCAVATION PERMIT r INSPECTION REQUEST K, DATE OF REQUEST: 7 ~ 6 `q 4L-- TIME:— BY: jLtFOR LOCATION�: .,c -2 7 DAY INSPEC. NEEDED 7-2—G" 9k TIME: TYPE OF INSPECTION: ( ) SANITARY/LATERAL (PERMIT NO. J S 3 ) ( ) FOOTING DRAIN ( ) EXCAVATION (PERMIT NO. ) ( ) OTHER INSPECTION REPORT Z DATE:- � — � �� � TIME: P 3 p INSP: CONTRACTOR: t�jGl WEATHER: WORK IN PROGRESS: AREA OF CONCERN: SPECIAL INSTRUCTIONS: