Loading...
HomeMy WebLinkAboutDrain Layers Permit 39 Cody Circle i.w.-. -^rn.. a_wv+--r�,ra'GsSR.a•-�.��.*-..s-+yr.vtr.+7^itm�. �, �a� , .°4 }cq;"7r+!3. ._ ... h . ,uy;,> ,� TOWN OF SOUTH WINDSOR pr DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT 6154 Z� 22 , _1q Pursuant to written application, `permission is hereby granted to the Licensed Drain Layer named herein to perform the work indicated below at E L,pT�ZS�- a t remises $wn e d by ale� ,_ AoAr_ whose address i.s 6 an to Lay House Drain, Repair ouse Drain, Lay Main, - Oth.e for occupancy or use, with Family Units,,/ with J acmes Type of Sewage`s�'o be connected under this permit : SANITARY SEWAGE ..INDUSTRIAL WASTESt( l) , OR :( ) d-9nnection will be made with SDR 3 Show sketch of proposed work or furnish 'two (2) copies of separate drawings OSHA REQUI EMENT MU,S,T E FOLL WED SPECIAL CONDITIONS %�29 Gc� Desired Starting Date Estimated Time for Completions/ Permit -to be `,issued to - 55 Ut--5 the holder of Drain Layer's License No, 2t0$g3D . Permit will expire thirty (30) days after date of issuance. The undersigned Drain Layer hereby agrees to all the; terms and - co nditions set forth in the permit and the reverse side thereof . Applicant has received Town Permit No. and/or CHD Permit No, Signed`" -� Lice;Zs Dra ' Layer The above named Drain Layer has "a valid�/iicenssu by the State of Connecticut and has filed a satisfactory bond and insurance policy in the name of the Town of South Windsor: Engin i lkl Dept. ^ .•e PerAit Fee Paid $ Check Number Connection Charge, Receipt No. Aj ya?) Dated. Issued byy INS ECTION Date work started '°7 Z,(g 2 Date completed z6 �� Sufficient not-ificalion receive a ; ' Yes No Special Conditions APPROVED: Inspector Date `/` ! SANITARY LATERAL & EXCAVATION PERMIT INSPECTION REQUEST DATE OF REQUEST: 2 6 TIME: zz t J O BY: FOR LOCATION: n� 4frZS DAY INSPEC. NEEDED 7- TIME: f �•� d TYPE OF INSPECTION: (�) SANITARY/LATERAL (PERMIT .NO.� ) (X ) FOOTING DRAIN ( ) EXCAVATION (PERMIT NO. ) ( ) OTHER INSPECTION REPORT 2- TIME: l INSP: DATE• — E � � .3 CONTRACTOR: WEATHER: /C� WORK IN PROGRESS: . / r AREA OF CONCERN: SPECIAL INSTRUCTIONS: