Loading...
HomeMy WebLinkAboutDrain Layers Permit 424 Clark Street 3" TOWN OF SOUTH WI N DSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT 6055 Pursuant to written application, permission is hereby granted to. the Licensed Drain Layer named herein to perform the work indicated below at *2Z- /-/P' ' C l at premises� ,o)wned by whose address is Z,p._/ P;494 wJ -'A2: 2j a1Wto Lay House Drain, Repair House Drain, Lay Main,_ Other for occupancy or use, with Family with _acres. Type of Sewage to be connected under this permit: SANITARY SEWAGE INDUSTRIAL WASTES ( ) , OR ( ) Connection will be made with ,bR 3 tj , Show sketch of proposed work or furnish 'two (2) ` cop es of separate drawings. SHA REQUIR ENTS MUST 13E FOLLOWED SPECIAL CONDITIO qS , S s G, Desired Star ing Date '� — Estimated Time for Completion Permit to be issued to ..;� rjy� '�� e---1 the holder of Drain Layer's, License No. zx:>jrr5cv .. Permit will expire thirty (30) days after date of issuance. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and the reverse side thereof. Applicant has received Town Permit No and/or CHD Permit No. Signed' k ^� Licen d Drai Layer The above named Drain Layer has a val licens issuedby the State of Connecticut and has filed a satisfactory bond and insurance policy in the name of the Town of South Windsor: ng nee g Dept. Date Permit Fee Paid $ 7j 0 0 Check ber / 74'4 Connection Charge Receipt No. Dated jZ��3 Issued by I, `73 INSPECTION Date work started Date completed Sufficient notification received: Yes No Special Conditions !s'Cti-�Gvo�s�G C� i�en,S . Gvxz '1 Z y/L-gy APPROV Inspector Date. SANITARY LATERAL & EXCAVATION PERMIT " INSPECTION REQUEST DATE OF REQUEST: 3-23 TIME: 3 y BY: /�/f91/(iY �J / J � FOR LOCATION: Y�f GGLfG 5 DAY INSPEC. NEEDED - 3-Z3�2-VTIME: 6UL,,7 TYPE OF INSPECTION: ( (� ) SANITARY/LATERAL (PERMIT NO. FOOTING DRAIN ( ) EXCAVATION (PERMIT NO. } ( ) OTHER INSPECTION REPORT DATE: TIME: INSP: � CONTRACTOR: J/7/1✓ WEATHER: /lam/�Gf WORK IN PROGRESS: d2l,> d ZL4AR� �'- AREA OF CONCERN: SPECIAL INSTRUCTIONS: