Loading...
HomeMy WebLinkAboutDrain Layers Permit 30 Brookfield Street r, 777777 f TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL . DRAIN LAYER'S PERMIT NO 5977 i g Pursuant to written application, permission is hereby granted to the Licensed Drain Layer named herein to perform the work indicated below at at premises owned by, J)=x4/ T w44s'e address is and to; Lay House Drain, 4-- Repair House Drain, Lay Main, Other for iJuG occupancy or use, with Family Units, with acres. Type of Sewage to be connected under this permit: SANITARY SEWAGE' INDUSTRIAL WASTES ( ) , OR ( ) Connection will be made with Show sketch of propjaw or furnish two (2) copies of separate drawAgs. 7AREOUTIM MENTS MUST BE FOLLOWED SPECIAL CONDITIONS Desired Starting Date Estimated Time for Completion Permit to be issued toc�L-=�a� � the- holder of Drain Layer's L cen'se No. ,i�d Permit will expire thirty (30)-days after date of issusnce. The:undersigned Drain Layer hereby agrees ' to all the terms and conditions set . forth in the permit and the reverse side thereof, Applicant has received Town Permit No . '� and/or CHD Permit No. Sign --` v LiceFfsed Dra n Layer The above named Drain Layer has a valid license issued by the State of L Connecticut and has filed a satisfactory and and nsurance policy in the name of the Town of Southindsor J Eng ne r ng Die Date Permit Fee P 'W Che N mber c Connection Charge Receipt No. ' Dane Issued by r INSPECTION Date work started Date completed / Sufficient notification receive : Z. es pNo '��'— Special Conditions AP PJ Inspector Date k TOWN OF SOUTH WINDSOR ` SANITARY SEWER INSPECTION CHECKLIST FUNCTION NO YES N/A DATE INSPECTED F- 1. Is PermitOn Job ite 59 7 7 2. Police Notified 3. Safety Items In Place a. Shoring, Trench Box, Ladder �p _ b. Hard Hats _ C. Pumps _ 4 . Proper Material a. Pipe - — b. Pipe Bedding C. Backfill —' d. Warning Tape e. Pipe Cap or Plug _A1 f. Cleanouts g. Fittings h. Manhole _ i. Cover & Frame 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear _ 7 . Pavement Cut Properly X 8 . Trench & Bedding OR A 9 . Joints Properly Done _ 10 . Backfilling (12" Lifts) _ & Compaction 11 . Manhole Inverts Built 12. Subbase Material Placed _ 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test _ 16 . Mandrel. Test 17 . Installation agrees with plan _ 18 . As-Built plans recorded