Loading...
HomeMy WebLinkAboutDrain Layers Permit 0292 Avery Street TOWN OF SOUTH WI N DSOR DEPARTMENT OF POLLUTION CONTROL B/P No.: South Windsor, Connecticut List.No.. DRAIN LAYEVS PERMIT N? 1216 4- 19 , 19�� Pursuant to written application, permission is hereby g d to the Licensed Drain Layer named herein to"perform the work indicatV d below at Z97� Ue� on the �• t �0 side, between at premises"owned by whose address is and to Lay House Drain, Repair House Drain, Lay-Main, _6Other for occupancy or use, with / Family Units, with acres. Type of Sewage to be connected under this permit: SANITARY SEWAGE (><, INDUS L WAS S . ), OR Connection will be made with Permit to be issued to the holder of Drain Layer's License No. Permit will expire on 19 The undersigned Drain Layer hereby agrees to all the terms and conditions set forth on the per and the reverse side thereof. Applicant has received Town Permit No. and/or C H D Permit No. for street excavation. PEC�L CrITK9NS Signed Connection Charge Paid icensed Drain Layer Issued by Tax Collector Permit Fee:. Paid $ 11) _ �S• v� INSPECTION: Check Number: �� INITIAL (Sig) FINAL (Sig) APPROVED (Date) (Sig) INSPECTOR N � I NOTES SOUTH WINDSOR POLLUTION CO ROL O�d 111Q� LOCATION OWNER If ,. TYPE OF WORK r / DATE - - PERMI / PIPE H ?'c INSTALLER 60, M'11,f' INSPECTOR j2ZZ DRAWN BY t 4 ' tr si a s� Ail Aw LILL- y� E Y a t t �K� p� � Fes+ � - - $ ,•{ 6-.+ / � � -. E.. :. t r ' {�� z� } �� _ _ :- 3_ •+� }l-ram i-: Y 4 TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR, CONN. 06074 DEPARTMENT POLLUTION CONTROL Date . . `T. . . . . . . . . . . . . . . . The Sanitary Sewer . . . Septic System ... . . . . . . . 4/. . . . . . . . . . . . . . . . . at or lot #. . s been installed and completed in accordance with the Town of South Windsor ordinances and regulations. Accepted and Approved sy �� t� Date —