Loading...
HomeMy WebLinkAboutDrain Layers Permit 109 Austin Circle F TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT N120 5946 19� Pursuant to written application, permission is hereby granted to the Licensed Drain Layer n med h rei to perform the work indicated below t !1GZ t at premises owned byZ----V�� '���,,, � whose address is g c4 and Lay House Drain, Repair ouse Drain, Lay Main, Other�� Pto for EA�.�`0 occupancy or use, with Family Units, with &a cres. =Type of Sewage to be connected under this permit : SANITARY SEWAGE ( , INDUSTRIAL WASTES ( °)", OR> ( ) • Connection will be made with Show sketch of proposed. work or furnish 'two (2) co—pies of separate drawings. OSHA REQUIREMENTS MUST BE FOLLOWED SPECIAL CONDITIONS- Desired Starting Date y....Z} � 3 Estimated Time for Completion Permit to be issued to 6� the holder of Drain Layer's License IT6. ag Permit will expire thirty (30) days after date of issuance. The undersigned Drain Lager hereby agrees to all the terms and conditions set . forth in the permit and the reverse side thereof. Applicant has received Town Permit No. and/o-r CHD Permit No. Signed 16. ticen-soW Dr n Layer The above named Drain Layer has a valid license issued by the State of Connecticut and has filed a satisfactory bond and insurance policy in the name of the Town of South Windsor: z-a, Engin ring Dew pt. Date Permit Fee" Paid $ j.0 Check Number �V"L'ly Connection Charge Receipt No. :qNn Dated Issued by INSPECTION Date work started Date completed Sufficient notification-rece ve : —Yes No Special Conditions APP Inspector =Date Y V TOWN OF SOUTH WINDSOR SANITARY SEVER INSPECTION CHECKLIST r ��}i� I FUNCTION �� G & t NO YES N/A DATE INSPECTED 1 . Is Permit On Job Site 2 . Police Notified 3. Safety Items In Place a. Shoring, Trench Box, Ladder _V 4 b. Hard Hats _ C. Pumps 4. Proper Material a. Pipe _ b. Pipe Bedding _ C. Backfill d. Warning Tape — e. Pipe Cap or Plug f. Cleanouts g. Fittings _ h. Manhole i. Cover & Frame 5 . Existing Lateral Cap Removed _ in Presence of Inspector 6 . Lateral probed and found to be clear 7 . Pavement Cut Properly 8. Trench & Bedding OK lo_w - 9 . Joints Properly Done _ 10 . Backfilling (12" Lifts ) _ & Compaction 11 . Manhole Inverts Built 12 . Subbase Material Placed 13. Base Material Placed 14. Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test 16 . Mandrel Test 17 . Installation agrees with plan _ 18 . As-Built plans recorded v�J fit' �� �;,�''���_`'���-+-Y,:?° z tom; '� �f