Loading...
HomeMy WebLinkAboutDrain Layers Permit 269 Abbe Road TOW4 OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS �J BUREAU OF POLLUTION CONTROL 1 DRAIN LAYER'S PERMIT 5979 " e)0A/ , 19 Pursuant to written application, permission is hereby 'granted. to the Licensed Dr Layer named herein to perform the work indicate ' b o at at premises owned by Je�e.t' /7af 1� whose address-lis ►�1 and to Lay 'Hou a D_ ai , Repair House Drain, Lay Main, Other for ca occupancy or use, with 2- Family Units, with j _acres. Type of Sewage to be connected under 'this. permit SANITARY SEWAGE (�) , INDUSTRIAL WASTES ( ) , OR ( ) Connection will be made with Show sketch of proposed work or furni h two (2) opies of separate drawings. C Q�Q Q SPECIAL COND OSHA REQUIREMENTS MUS BE FOL WED TI S� Desired Start ng Date j + E timate Time for: Completion Cie, Permit to be issued to the holder of Drain Layer's License No Permit will expire thirty (30) `days- after date of issuance. The undersigned Drain Layer hereby agrees ' to all the. terms and conditions set . forth in the permit and the reverse side ` thereof. Applicant has received Town Permit No. and Jor ` CHD Permit No. Signed Licensed Drain Layer The above named Drain Layer has a val license issued by the State of Connecticut and has filed' a satisfactory bond and insurance policy in the name of the Town of South Windsor: ' Engineering Dept. . Date Permit Fee Paid $ ,_25,00 Check Number ---* Connection Charge Receipt No. Dated �. Issued by INSPECTION Date work started Date completed 7, Sufficient notifica on received-.- es No Special Conditions AP Inspector Date INN N . TOWN OF SODTS pINDSOR SANITARY S INSPBCTION C RCK,IST FUNCTION .2-6 9 a� NO YES N/A DATE INSPECTED 1' Is Permit On Job Site 2. Police Notified / ` 3. Safety Items In Place I- Shoring, Trench Box, Ladder b- Hard Hats c. Pumps ✓ — 4. Proper Material a. Pipe Y b• Pipe Bedding C. Backfill ✓ _ d- Warning Tape -LG e. Pipe Cap or Plug —� f- Cleanouts 9. Fittings h. Manhole ✓ i- Cover & Frame 5 . Existing Lateral Cap Removed in Presence of Inspector - 6 • Lateral probed and found to be clear 7 . Pavement Cut Properly 8 . Trench & Bedding pR 9 • Joints Properly Done 10 . Backfillin (12 & Compaction Lifts) 11 . Manhole Inverts Built 12. Subbase Material Placed . 13 . Base Material Placed 14 . Blacktop ( --� Temp) w/Proper Grades & Slopes 15 . Pressure Test 16: Mandrel Test 7. Installation agrees with plan �• As-Built plans recorded