Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Scanned on 08/19/2015 at 10:01:26
STORMWATER POLLUTION PREVENTION PLAN TOWN OF SOUTH WINDSOR PUBLIC WORKS FACILITY 157 BURGESS ROAD SOUTH WINDSOR,CONNECTICUT SEPTEMBER 2011 Prepared For: Town of South Windsor Department of Public Works 1540 Sullivan Avenue South Windsor, CT ANCHOR 41 Sequin Drive Glastonbury, CT 06033 T: 860.633,8770 F: 860.633.5971 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT '� TABLE OF CONTENTS SECTION Page I. DEVELOPMENT OF THE PLAN 1 II. STORMWATER POLLUTION PREVENTION PLAN 1 A. Facility Description 1 B. General Location Map 2 C. Pollution Prevention Team 2 D. Potential Pollution Sources 2 E. Control Measures 5 F. Non-Stormwater Discharge Certification 13 G. Additional Req.for Stormwater Discharges to a Municipal Separate Storm Sewer 14 H. Consistency with Other Plans and Permits 14 I. Future Construction 14 J. Monitoring Program 15 K. Schedules and Procedures 17 III. DEADLINES FOR PLAN PREPARATION AND COMPLIANCE 17 IV. SIGNATURE AND PLAN REVIEW 17 V. KEEPING THE PLAN CURRENT 19 VI. FAILURE TO PREPARE OR AMEND PLAN 20 VII. PLAN CERTIFICATION 20 VIII. INSPECTIONS 20 APPENDIX A. General Permit Registration Form,Site Location Map, DEEP General Permit B. Stormwater Monitoring Data C. Spills/Leaks Records and Reportable Quantities List D. Training Program Outline and Employee Certifications E. Inspections&Comprehensive Site Compliance Evaluation Reports F. Plan Revisions G. Base Monitoring Program, H. Including Additional Sector Based Monitoring Requirements I. Spill Prevention and Response Procedures J. Facility Site Plan TABLES After Page 10 Stormwater Pollution Plan Team Members 2 Inventory of Exposed Materials 3 i Anchor Engineering Services,Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT • I. DEVELOPMENT OF THE PLAN This Stormwater Pollution Prevention Plan ("Plan" or SWPPP) was developed in accordance with the requirements of the General Permit for the Discharge of Stormwater Associated with Industrial Activities (General Permit). The permit conditions are identified as Sections 3 and 5 of the General Permit, issued on October 1, 2002, and modified July 15, 2003, by the State of Connecticut Department of Energy and Environmental Protection (CTDEEP), Bureau of Water Management. This permit has been re-issued without modification until September 30, 2010. A new permit with additional requirements takes effect on October 1, 2011. This SWPPP has been developed to address current and future permit requirements. This plan was developed for the Public Works Facility at 157 Burgess Rd.in South Windsor,CT.The facility is owned and operated by the Town of South Windsor. The Permittee for this facility is also recorded as Town of South Windsor.A copy of the site's General Permit registration form, the current DEEP General Permit, and a Site Location Map are included as Appendix A. The owner/operator/permittee supports the implementation of this SWPPP. II. STORMWATER POLLUTION PREVENTION PLAN • A. Facility Description The public works facility located at 157 Burgess Rd. South Windsor, Connecticut is approximately 40.54 acre in size.The property is bound to the north by Burgess Rd., to the east by the farm lands, to the south by power lines and woods, and to the west by woods.The facility has two building, a maintenance building which also has a office area, and a large salt shed. Town vehicles are stored mainly around the maintenance building. Stockpiles of gravel, dirt, and other materials like concrete catch basins and pipes as well as miscellaneous vehicles are stored west of the maintenance building and west of the salt shed on site.Also, a stockpile of sand is located south of the salt shed. Miscellaneous maintenance equipment like tractors and landscape trailers are stored in the old recycling center area. Employee parking is located to the north of the maintenance building. There are also multiple aboveground storage tanks (ASTs) on-site including: a de- icing AST, a heating oil AST, a waste oil AST as well as an underground storage tank(UST) located east of the maintenance building for fleet vehicles. To the far west of the site on top of the closed landfill the town performs there composting operation. One composting operation is on the west side of the landfill and the second is on the east side of the landfill. A majority of the site is covered by the facilities yard operations or the towns composting operations. The remainder of the site which are the more trafficked areas, around the salt shed and maintenance building, are covered by impervious surfaces. Multiple driveways are available from Burgess Rd.for the public works facility. All operations at this site are conducted on Monday through Friday. 1 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT B. General Location Map A 1:2000 scale USGS quadrangle map showing the general location of the site is presented in Appendix A. C. Pollution Prevention Team As the Permittee's and Owner's representative, Karl Reichel for the Town of South Windsor, will serve as the "team leader" of the Storm Water Pollution Prevention Team ("team"). He serves as the prime contact for the owner with the team's independent engineer.This person may be contacted at the following address: Town of South Windsor Department of Public Works 157 Burgess Rd. South Windsor,CT Phone: (860) 648-6366 As the team leader, the Site Operations Manager also directs the activities of site personnel in regard to the implementation of this plan. The team leader or his/her on-site representative will be accompanied by the Engineer, if requested, on a minimum of two Comprehensive Site Compliance Evaluations each year. Significant changes in inventory of materials, spills and leaks of five gallons or more, and significant changes with on-site operations are to be reported to the team leader. Changes or additions to personnel on the "team" can be made to the attached table (Table 1) of team members. At least one team member shall be present at the facility or on call during all operational shifts. Each member of the team has access to either an electronic or paper copy of applicable portions of the permit and the SWPPP. D. Potential Pollutant Sources (i) Site Map A site map of the facility showing all features required under the general permit is permit is presented in Appendix . (ii) Inventory of Exposed Materials and Summary of Potential Pollutant Sources A tabular inventory of non-gaseous materials located at this site is presented as Table 2. 2 Anchor ngineering Services,Inc. • Town of South Windsor Public Works•Facility 157 Burgess Rd. South Windsor,CT TABLE 1 STORMWATER POLLUTION PREVENTION TEAM �010 R ONE: 20. J? ............ ......... ... Leader- Coordinate all stages of plan development,inspection and Superintendent of implementation; coordinate employee training program; maintain all records Karl Reichle Operations (860) 648-6366 including inspections, stormwater sampling results,plan modifications, etc. Designated Member-Implementation of SWPPP and good housekeeping Administrative program; assist in inspections, sampling, and/or spill response as required. Ron Asselin Manager (860) 648-6366 Designated Member- Ensure implementation of SWPPP and good housekeeping program; assist in inspections,sampling, and/or spill response as Fleet Service Manager (860) 648-6366 Mark Owens required. 1 of 1 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. i South Windsor, CT (iii)Summary of Potential Pollutant Sources The following potential pollution sources exist on-site: • Potential for motor oil, fuel, or hydraulic oil fluid leaks from vehicles and equipment parked/stored on the site. • Potential for impacts from stormwater contact with waste residue in solid waste containers stored on-site. • Potential for spilled automotive fluids caused by bulk transfer of fluids to/from the vehicle maintenance buildings • Potential for spilled fluids caused by bulk transfer to the ASTs and the UST located on the exterior grounds of the site. • Potential for stormwater to contact refuse and scrap metal accumulated in the on-site dumpsters. • Potential for spilled diesel fuel caused by fueling vehicles/equipment on-site. • Potential for stormwater to contact construction and demolition materials (C&D) in the yard area. • Potential for stormwater to contact materials on-site including stockpiles of compost, sand, stone, catch basins, utility poles,pipes, etc. • Potential for stormwater to contact salt around the salt shed. • Details regarding exposed materials and potential pollutants are given below. A tabulated inventory of these exposed materials is also provided in Table 2. Loading and Unloading Operations F aterials that can contaminate stormwater are loaded and unloaded inside the buildings on-site and do t come into contact with stormwater. aterials such as pipes, gravel, sand, concrete catch basins, compost, etc. around the site are loaded/unloaded outside however, are not a major pollutant source to stormwater. Bulky waste will be unloaded and processed in the landfill area. Containers shall be covered and plugs are to be installed prior storing on-site. IS 19 An r Engineering Services,Inc. Town of South Windsor Public Works Facility acility 157 Burgess Rd. South Windsor, CT TABLE 2 INVENTORY OF MATERIALS EXPOSED TO STORMWATER Material Stored Description Potential and'Manage d Quantity Method&Location Management Practices Stormwater'Contact: • Minimize outside storage where Vehicles and Around vehicle maintenance possible Varies building and west of the salt Maintain vehicles and ` Saks or spitwater contact from Equipment shed equipment leaks or spills. per manufacturer's instructions Underground Storage Tank ' Monitor transfer activities + Possible contact with Diesel Fuel (UST) west of maintenance p g 4,000 • Adhere to transfer protocols stormwater during bulk gallons building • Maintain spill kits within delivery and regular vicinity refueling operations • Potential for stormwater to Sand Varies Stockpile south salt shed • Monitor area for sediment contact stockpiles stored control on-site. • Potential for stormwater to Dirt/gravel/wood Varies Stockpile west of the • Monitor area for sediment contact stockpiles stored maintenance building control on-site. Page 1 of 3 Ance Engineering Services, Inc. Town of South Windsor 0 o Public Works Facility 157 Burgess Rd. South Windsor, CT TABLE 2 INVENTORY OF MATERIALS EXPOSED TO STORMWATER -Material Stored and i Qtiantity. Method&Location Management Practices Description Potential Managed' Stormwater Contact Misc.materials + Potential for stormwater to (pipe,utility Varies West of the maintenance + Monitor area for sediment contact materials stored pulls,catch building control on-site. basins, etc.) Employee Vehicle Varies North of maintenance • Inspect parking areas + Incidental drippage of Parking building for signs of leaks fluids and oils + Potential for stormwater to Compost Varies Top of the closed landfill Monitor area for sediment contact stockpiles stored control on-site. Page 2of3 Anc*Engineering Services, Inc. • Town of 0 South Windsor Public Works Facility 157 Burgess Rd. South Windsor,CT TABLE 2 INVENTORY OF MATERIALS EXPOSED TO STORMWATER Material Stored and :,Quantity Method&Location Management Practices Description Potential µ> Managed Stormwater Contact: Page 3 of 3 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT Roof Areas The roof areas of the on-site buildings are a combination of flat roofs and shallow pitched roofs to disperse rainfall. The roof area is not considered to be a likely source of pollutants. Outdoor Storage Activities Outdoor storage activities consist of the following: • Waste fluid ASTs with double-walled construction and secondary containment are located around the maintenance building. • De-icing fluid ASTs with double-walled construction and secondary containment are located around the salt shed. • Fuel/heating oil ASTs with double-walled construction and secondary containment are located around the salt shed. • Town vehicles and equipment parked outside around the maintenance building and west of the salt shed. • Dumpsters are stored outside of the maintenance building. • Stock piles of compost, sand, gravel, etc. are stored on top of the landfill and in the yard area west of the maintenance building. • Materials such as pipes, concrete catch basins, etc.are stored in the yard area. • On-site employees park their personal vehicles in parking areas to the north of the maintenance building. • Parts and additional fluids are stored in the storage sheds as well as in the maintenance building. Outdoor Manufacturing or Processing Activities =N�ooutdoor manufacturing activities are performed on-site. All maintenance and fabrication work is within the maintenance building.Compost is processed on top of the landfill. Dust or Particle Generating Processes All dust generating activities are preformed indoors. Composting of leafs on top of the landfill can create dust however, dust during this activity shall be controlled as needed. Vehicles periodically traverse the site which can potentially create dust on-site. Especially in the gravel/dirt storage areas. The areas of the site subject to vehicle travel are swept or maintained on an as needed basis. 4 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT On-Site Disposal Practices There are no on-site disposal practices. Small amounts of MSW and waste scrap metal generated by facility workers are stored inside the building in designated containers. The MSW is transferred to an onsite covered dumpster, which is emptied as necessary by a licensed hauler.Waste scrap metal pieces area stored outside with other clean metal until a sufficient quantity is generated to allow for collection and recycling by a scrap metal contractor. Waste automotive fluids are disposed of into the on-site AST located outside the maintenance building before being disposed of off-site by licensed waste disposal contractors/recyclers. Old automotive parts are recycled as scrap metal, used batteries and old tires are recycled to specially- designated end-vendors. (iv) Spills and Leaks Per site staff and CTDEEP files, no spills and leaks of five gallons or more or petroleum products or of toxic or hazardous substances which could affect stormwater have occurred in the past 5 years at the . site. ==Asoftember 2011 no reported spills and leaks of five gallons or more of petroleum products or of zardous substances has occurred in the past 5 years at this site. E. Control Measures 1. Good Housekeeping The permittee must maintain a clean, orderly facility (e.g. sweeping at regular intervals, appropriate storage practices, proper garbage and waste management, dust control measures, etc.) in all areas that are exposed to rainfall and are potential sources of pollutants. Good housekeeping practices shall be employed by the personnel at this facility to provide a clean and orderly working environment. The goal of good general housekeeping practices is to reduce the potential for stormwater pollution from on-site activities and for spills. Employees will: • Promptly remove/remediate all spills in accordance with the level of training that they have received and immediately notify the site manager. • Police the facility for litter or debris and general cleanliness that may be inhibiting the performance of on-site drainage systems, on a weekly basis. • The outdoor area of the site that is traversed by vehicles should be swept on a as needed basis. 5 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor,CT • Ensure all containers stored outdoors are covered when not in use and that they have drain plugs installed. • Inspections of the ASTs and UST shall be performed monthly. • Store all 55 gallon drums on secondary containment pallets indoors or in a covered area where they will not come into contact with stormwater. • Keep all facility vehicles and mechanical equipment in good repair and clean. • Conduct annual employee training so that all employees are instructed in the goals and implementation of the SWPPP. • Perform twice per year compliance inspections and routine inspection; complete associated reports and housekeeping logs. 2. Vehicle or Equipment Washing The permittee must provide, at a minimum, that no washing or rinsing of equipment, buildings or vehicles shall be allowed at the site which would allow wash or rinse waters to enter any storm drainage system or surface waters of the State without a permit. Such discharges to groundwater are not authorized by this general permit. Facility personnel wash vehicles in a the designated wash bay in the maintenance building. This discharge is directed the sanitary sewer system after being routed through an oil/water separator. fihts acility should be permitted Wider and managed m accordance with"the General Pesm9 r4tlae F17uchctrge jleb cke Mafn ten arrce �steurat�r` 3. Floor Drains The permittee must provide that all floor drains have been sealed, authorized by a local authority to discharge to sanitary sewer or allowed by DEEP in accordance with the"Non-Stormwater Discharges" section(Section 5(b)(11)) of the general permit. The wash bay is equipped with floor drains which discharges to a oil/water separator to the north of the maintenance building before being discharged to the sanitary sewer. " 4. Roof Areas The permitter must identify roof areas that may be subject to drippage, dust or particulates from exhausts or vents or other sources of pollution. The permittee must inspect such areas to determine if any potential sources of stormwater pollution are present. If so, the permittee must minimize such sources or potential sources of pollution. 6 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT As explained earlier in this report, the roof of the facility is not considered a potential source of pollution. 5. Minimization of Exposure The permittee must minimize exposure to stormwater of materials identified in the "Inventory of Exposed Materials" section (Section 5(c)(2)(D)(ii)) of this general permit. Facilities in categories 2 and 10 of the definition of industrial activity in Section 2 of this general permit constructed after July 15, 2003 shall be constructed to preclude exposure of materials (as defined in the category 10 definition) by means of a permanent roof or cover or provide stormwater treatment, as identified in the Stormwater Quality Manual, for such exposed areas. Where the permittee believes it is not feasible to construct a permanent roof or cover, they shall submit their Plan (and plan review fee specified in Section 5(c)(4)(B)) showing the area(s) in question and reasons in writing for the commissioner's review and written approval. The permittee minimizes exposure of materials by storing various materials (oils, lubricants, etc.) indoors. All fixing, and maintenance is performed indoors. Salt is stored inside the salt shed. Routine inspecting the ASTs and UST will be preformed to minimize exposure of materials to stormwater and adequately supplying spill prevention materials near the tank in case of a spill or leak. 6. Sediment and Erosion Control The permittee must identify areas that have a potential for soil erosion due to topography, activities, or other factors, and shall implement measures to limit erosion and stabilize such areas. All construction activities on-site shall be conducted in accordance with the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control (Guidelines) and the"Future Construction"section (Section 5(c)(2)(I)) of this general permit. Sediment controls include regular sweeping of the site and the on-site catch basins, and drainage swa]are The heavier trafficked areas around the site are covered with impervious surfaces so erosion controls minimal.The gravel/dirt storage areas shall be monitored and maintained for erosion. Sediment wil removed from the on-site structures annually or on an as needed basis. 7. Management of Runoff The permittee shall investigate the need for stormwater management or treatment practices that shall be used to divert, infiltrate, reuse, or treat stormwater runoff in a manner that minimizes pollutants in stormwater discharges from the site. Any evaluation, construction or modification of the design of a stormwater drainage system requires certification by a professional engineer licensed to practice in the State of Connecticut. The permittee shall implement and maintain stormwater management or treatment measures determined to be reasonable and appropriate to minimize the discharge of pollutants from the site. 7 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT In implementing infiltration practices, care must be taken to avoid ground water contamination in accordance with Appendix C. Any stormwater infiltration measures implemented by the permittee and located within an aquifer protection area as mapped under section 22a-354b of the Connecticut General Statutes shall be conducted pursuant to sections 8(c) and 9(b) of the Aquifer Protection Regulations (section 22a-354i(1)-(10) of the Regulations of Connecticut State Agencies). The permittee must assure that stormwater run-off generated from the regulated activity is managed in a manner so as to prevent pollution of groundwater, and shall comply with all the requirements of this permit. The permittee shall consider the potential of various sources at the facility to contribute pollutants to stormwater discharges associated with industrial activity when determining reasonable and appropriate measures. Where feasible, the permittee shall divert uncontaminated run-on to avoid areas that may contribute pollutants. Other appropriate stormwater management or treatment measures may include but are not limited to: vegetative swales or buffer strips, reuse of collected stormwater (such as for process water, cooling water or as an irrigation source), treatment technologies (e.g. swirl concentrators, sand filters, etc.), snow management activities, bioretention cells, green roofs, pervious pavement and wet detention/retention basins. The permittee shall ensure that such measures are properly designed, implemented and maintained in accordance with the Stormwater Quality Manual. Runoff for the site is directed into on-site catch basins or stormwater is directed into the drainage Swale on the south side of the site. The catch basin sumps and drainage swale minimize the discharge of pollutants from the site. Most of the site is unpaved and the majority of the water on-site infiltrates into the ground. Stormwater from the paved areas on the far eastern end of the site flows to several catch basins, which drain to a drainage swale which runs along the southern border of the site. The onsite ASTs and the UST located outside are constructed with double-walled construction and have secondary containment.Should a release occur that is not containable by on-site personnel, a spill clean- up contractor as well as CT DEEP will be called. 8. Preventative Maintenance The permittee must implement a preventive maintenance program, which shall include but not be limited to: the inspection and maintenance of stormwater management devices (e.g. cleaning stormwater treatment devices, catch basins); the visual inspection and/or testing of on-site equipment and systems to identify conditions that could cause breakdowns or failures resulting in discharges of pollutants to surface waters; and the appropriate maintenance of such equipment and systems. These areas shall be included in the Routine Inspections conducted under Section 5(d)(2) of this general permit. If the permittee maintains an existing preventive maintenance program that addresses the requirements of this control measure, they may use that program to meet this requirement. The existence of such a program and the location of its maintenance records shall be referenced in the Plan. • Preventative maintenance at this site shall involve weekly visual inspections of areas which may be susceptible to spills, leaks or releases to the environment (material loading, vehicles/equipment on-site, unloading, storage, handling areas, the fan vents, and filters for the 8 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT • building's ventilation systems) and the areas surrounding the storage areas to include all stormwater management devices (such as the on-site catch basins and drainage basin). • The catch basins shall be cleaned out on an as-needed basis. • At the end of each operating day, the facility is to be left in a clean and orderly fashion. • All dumpsters and solid waste containers shall be covered and plugs are to be installed. Containers that do not have a functioning cover or plug shall be repaired as soon as possible so as to minimize exposure of stormwater to the interior of the container. • Daily inspections include visual observations and collection of any wind-blown litter and stray materials. • All site areas and activities including material storage, maintenance, repair, and washing areas shall be informally inspected on a daily basis and formally inspected on a monthly and a semi- annual basis per the inspection form included in Appendix E. 9. Spill Prevention and Response Procedures The permittee must minimize the potential for leaks and spills. This shall include clearly identifying areas where potential spills can occur and their accompanying drainage points. The permittee must plainly label containers (e.g., "Used Oil," "Spent Solvents," "Fertilizers and Pesticides," etc.) that could be susceptible to spillage or leakage in areas that could contribute pollutants to stormwater runoff. The permittee shall identify procedures for containing, reporting and cleaning up spills. These procedures • must be provided to the appropriate personnel through Employee Training (subsection 10, below) along with the necessary equipment to implement a cleanup. A) Containment To prevent unauthorized discharges of liquid chemicals or wastewater from commingling with or polluting a facility's stormwater discharges, or otherwise causing pollution to the waters of the state, the permittee shall comply with the following requirements, as applicable: (i) Stationary Storage or Storage Areas For the purposes of Section 5(b)(9)(A) of this general permit only, storage area means an exterior area, which is or has the potential to be exposed to stormwater, that contains one or more tanks or containers utilized for the storage of liquid chemicals or for the collection, storage or treatment of wastewater. Any stationary above-ground tank, container or storage area used: (1) for the storage of liquid chemicals as identified in the "Spills and Leaks" section (Section 5(c)(2)(D)(iv)) of this general permit; or (2) for the collection, storage or treatment of wastewater shall, at a minimum,comply with one of the following types of secondary containment requirements: 1) A double-walled above-ground tank or container; or • 2) For any storage area, tank or container installed prior to the date of authorization of this general permit (Oct. 2011), an impermeable secondary containment area which will hold at least 100% of 9 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT the volume of the largest tank or container or 10% of the total volume of all tanks and containers in the area,whichever is larger,without overflow from such secondary containment area: or 3) For any storage area, tank or container installed after the date of authorization of this general permit (Oct. 2011), an impermeable secondary containment area which will hold at least 110% of the volume of the largest tank or container or 10% of the total volume of all tanks and containers in the area, whichever is larger, without overflow from such secondary containment area. E ASTs are constructed with double-walled construction, and have secondary containment thatt the requirements listed above. The UST is constructed with double-walled construction, and isted under a concrete pad which does not allow stormwater to come in contact with the tank. (ii) Mobile or Portable Storage Any mobile or portable above-ground tank or container used for the collection or storage of wastewater shall comply with the secondary containment requirements of Section 5(b)(9)(A)(i) above, unless the following minimum requirements are met: 1) Such mobile or portable tank or container and related appurtenances (i.e., piping, fittings, valves, gauges, alarms, switches, etc.) are designed, operated and maintained in a manner to prevent releases 1� of wastewater resulting from factors including, but not limited to, physical or chemical damage, tampering or vandalism, freezing and thawing, and 2) In addition to the requirements of Section 5(b)(9)(A)(ii)(1) above, for any mobile or portable tank or container and related appurtenances that are affixed to a trailer, such trailer shall be a registered motor vehicle designed, operated and maintained to be capable of on-road transport of wastewater at all times. (iii) Containment exemption for certain stationary above-ground storage tanks, containers, and areas 1) The secondary containment requirements of Section 5(b)(9)(A)(i) above do not apply to stationary above-ground storage and treatment tanks and containers, and storage areas if such tanks, containers, and storage areas are associated with a discharge(s) authorized by a permit issued pursuant to Section 22a-430 or 22a-430b of the Connecticut General Statutes. (iv) Additional requirements For industrial activities initiated after October 1, 1992, if an impermeable secondary containment area is required by 5(b)(9)(A)(i) or (ii) above, such containment area shall be roofed in a manner which minimizes stormwater entry to the containment area, except for a containment area which stores tanks or containers of 100 gallon capacity or more,in which case a roof is not required. 10 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. • South Windsor, CT Stormwater that may accumulate in a containment area may be discharged only after the permittee conducts testing to confirm that it contains none of the relevant pollutants stored therein. For petroleum storage containment areas, visual inspection for a sheen fulfills this requirement. If testing is not conducted or if it indicates the presence of a relevant pollutant, this containment water must be treated and/or disposed of according to DEEP and federal regulations. The ASTs are constructed with double-walled construction, and have secondary containment that meet the requirements listed above. The UST is constructed with double-walled construction, and is located under a concrete pad which does not allow stormwater to come in contact with the tank. B) Dumpsters The permittee must ensure that all dumpsters, trash compactors, and"roll-off' containers used to store waste or recyclable materials are in sound watertight condition and have covers and drain plugs intact, or are in roofed areas that will prevent exposure to rainfall and will not allow dumpster leakage to enter any stormwater drainage system. All covers on dumpsters not under a roof must be closed when dumpsters are not being loaded or unloaded. [All containers stored outdoors shall have their covers closed and drain plugs installed. If a containers ver does not work or if plugs cannot be installed repairs shall be performed as quickly as possible to sure these features are functioning properly. C)Loading Docks The permittee shall provide that for all industrial activities initiated after July 15, 2003, loading docks (excluding those that allow a vehicle to enter the building) shall be protected with a permanent roof or other structure that protects the loading dock from direct rainfall. Stormwater collection and drainage facilities adjacent to the loading dock shall be designed and maintained in a way that prevents any materials spilled or released at the loading dock from discharging to the storm sewer system. This site does not have a loading dock.Materials are loaded/unloaded inside the buildings as needed.A detailed list of Spill Prevention and Response Procedures is presented in Appendix H. 10. Employee Training The permittee shall ensure that all employees whose activities may affect stormwater quality receive training within ninety (90) days of employment and at least once a year thereafter to make them familiar with the components and goals of these control measures and the Plan. Training shall address topics such as emergency equipment location, spill response management, control measures, inspection requirements, good housekeeping and materials management practices. Training shall be conducted or • supervised by a member of the Pollution Prevention Team or other qualified person and a written record shall be maintained in the Plan, including the date(s), employee name, employee responsibility and training agenda. 11 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT The Employee Training Program is presented in Appendix D. 11.Non Stormwater Discharges The permittee must eliminate non-stormwater discharges except as provided in "Non-Stormwater Discharge Certification" (Section 5(c)(2)(F)) or as authorized by an individual permit issued pursuant to section 22a-430 or a general permit issued pursuant to 22a-430b of the Connecticut General Statutes, including the provisions of this general permit. A non stormwater discharge exists on-site; sewage from the on-site bathrooms, and the drains form the wash bay. The on-site bathrooms are connected to municipal sewer system and do not come into contact with stormwater. The discharge from the drains in the wash bay are collected to a oil/water separator then discharge to the municipal sewer system. The oil/water separator will be cleaned-out on an as needed basis or at least once per calendar year. Please refer to section II. F. (below) for the Non-Stormwater Discharge Certification. 12.Solid De-Icing Material Storage sThe permittee must ensure that storage piles of de-icing materials (including pure salt, salt alternatives or either of these mixed with other materials) used for deicing or other commercial or industrial purposes that are in place for more than 180 days shall be enclosed or covered by a rigid or flexible roof or other structural means. Such structure shall not allow for the migration or release of material outside of the structure through its sidewalls. As a temporary measure (not to exceed two years from the effective date of this general permit), a waterproof cover may be used to prevent exposure to precipitation (except for exposure necessary to add or remove materials from the pile) until a structure can be provided. For temporary storage piles of de-icing materials in place for less than 180 days per year, a waterproof cover may be used to prevent exposure to precipitation (except for exposure necessary to add or remove materials from the pile). In areas with a groundwater classification of GA or GAA, an impervious liner shall be utilized under any de-icing material pile to prevent infiltration to groundwater. In addition, no new road salt or de-icing materials storage facilities shall be located within a 100-year floodplain as defined and mapped for each municipality under 44 CFR 59 et seq. or within 250 feet of a well utilized for potable drinking water supply or within a Level A aquifer protection area as defined by mapping pursuant to section 22a-354c of the Connecticut General Statutes. Liquid de-icing materials (calcium chloride) are stored on site in an AST mixed with sand. The mixture is stored inside an on-site sand/salt storage shed. No solid de-icing materials are stored on site. • 13. Sector Based Control Measures 12 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT • Section 5(0 of the general permit contains additional control measures for certain industrial activities ("sectors"). These are specific control measures that apply only to the industries in a given sector and are to be implemented in addition to the control measures in this section. Refer to Appendix H for additional sector based control measures for this facility. F. Non-Stormwater Discharge Certification "I certify that in my professional judgment, the stormwater discharge from the site consists only of stormwater, or of stormwater combined with wastewater authorized by an effective permit issued under section 22a-430 or section 22a-430b of the Connecticut General Statutes, including the provisions of this general permit, or of stormwater combined with any of the following discharges provided they do not contribute to a violation of water quality standards: • landscape irrigation or lawn watering; • uncontaminated groundwater discharges such as pumped groundwater, foundation drains, water from crawl space pumps and footing drains; • discharges of uncontaminated air conditioner or refrigeration condensate; • water sprayed for dust control or at a truck load wet-down station; • naturally occurring discharges such as rising groundwaters, uncontaminated groundwater infiltration (as defined at 40 CFR 35.2005(20)), springs, and flows from riparian habitats and wetlands. This certification is based on testing and/or evaluation of the stormwater discharge from the site. I further certify that all potential sources of non-stormwater at the site, a description of the results of any test and/or evaluation for the presence of non-stormwater discharges, the evaluation criteria or testing method used, the date of any testing and/or evaluation, and the on-site drainage points that were directly observed during the test have been described in detail in the Stormwater Pollution Prevention Plan prepared for the site. I further certify that no interior building floor drains exist unless such floor drain connection has been approved and permitted by the commissioner or otherwise authorized by a local authority for discharge as domestic sewage to sanitary sewer. I am aware that there may be significant penalties for false statements in this certification, including the possibility of fine and imprisonment for knowingly making false statements." Date: . Matthew N.Brown, P.E. (CT 22019) Anchor Engineering Services, Inc. 13 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT G. Additional Requirements for Stormwater Discharges to a Municipal Separate Storm Sewer In addition to the applicable requirements of the general permit, the Plan must show that sites authorized by this permit shall comply with applicable requirements in an MS4 permit for the municipal separate storm sewer system that receives the industrial facility's discharge, provided such discharger has been notified of such conditions. Fhavenot oes not discharge to a municipal separate storm sewer system, and the site's owner/operator The een notified of any additional requirements by any municipality. In the event that the ty notifies the permittee of any additional requirements, the permittee and/or their ive will document the additional requirements in this SWPPP. H. Consistency with Other Plans and Permits The Plan may reference requirements contained in a Spill Prevention Control and Countermeasure (SPCC) plan or a plan prepared or approved under the Resource Conservation and Recovery Act (RCRA) and other plans required by state, federal or local law. A copy of the pertinent sections of any referenced plan must be kept with the Plan. The Plan shall identify all general and individual permits issued by the DEEP for which the facility is authorized. used an tie t end quautlr a and-clientcal storage ate situ tCie fa meets tfYthrseTcc a. r ecessar r a rec}c re a ca} a xe Jr erencec move.' die fact i e �r tie .-. d r ��'"..'`. xx dxnsPacate an sit "the SPCA ts �� k lt.�n.. Ai 1'Y x s "''J e� tEa thusie fact g� wee I. Future Construction Any future construction activity that disturbs greater than one acre must be conducted in accordance with the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities (as amended). All construction activities, regardless of size, shall comply with the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control during construction and the 2004 Connecticut Stormwater Quality Manual for the design and implementation of post-construction stormwater management measures. In addition, the permittee shall avoid, wherever possible, the use of copper or galvanized roofing or building materials for any new building construction where these materials will be exposed to stormwater. An future construction activities will Y be conducted in accordance with the guidelines listed above. 14 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT J. Monitoring Program The monitoring program, including the requirements for collection and analysis of stormwater samples for both visual and chemical analysis, for this facility is presented in Appendix G. Base Monitoring Program Benchmarks These benchmarks apply to all permittees. Additional sector specific benchmarks that apply to the site are identified in Attachment H. Chemical Oxygen Demand(mg/1) 75 Total Oil and Grease(mg/1) 5 Sample pH 5-9 Total Suspended Solids (mg/1) 90 Total Phosphorus (mg/1) 0.40 Total Kjeldahl Nitrogen(mg/1) 2.30 Nitrate as Nitrogen(mg/1) 1.10 Total Copper(mg/1) 0.059 Total Lead(mg/1) 0.076 Total Zinc(mg/1) 0.160 Data not exceeding benchmarks After collection of 4 semiannual samples, if the average of the 4 monitoring values for any parameter does not exceed the benchmark, the monitoring requirements for that parameter have been fulfilled for the permit term. For averaging purposes for any individual sample parameter analyzed using procedures consistent with General Permit, which is determined to be less than the method detection limit, use a value of half the method detection limit reported by the analyzing laboratory. For sample values that fall between the method detection level and the reporting level (i.e., a confirmed detection but below the level that can be reliably quantified), use a value of half the reporting level reported by the analyzing laboratory. Once the benchmark for sample pH has been met and monitoring for pH has been fulfilled, the measurement of rainfall pH is no longer required. Data exceeding benchmarks Within 120 days of receiving the results of the fourth semiannual sample, if the average of the 4 semiannual monitoring values for any parameter exceeds the benchmark, the permittee must, in accordance with the Section V of this plan, review the selection,design,installation and implementation of the control measures to determine if modifications are necessary to meet the benchmarks in this permit, and either: • Make the necessary modifications to the control measures and Plan and continue semiannual monitoring until the permittee has completed 4 consecutive semiannual monitoring events for • which the average does not exceed the benchmark, or 15 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor,CT • • Make a determination that no further pollutant reductions are technologically available and economically practicable and achievable in light of best industry practice to implement additional control measures or meet the benchmarks, in which case the permittee must continue monitoring once per year. The permittee must also document the rationale for concluding that no further pollutant reductions are achievable and submit this documentation to the commissioner for written approval. The permittee must retain all records related to this documentation with the Plan. If an exceedance of the 4 event average is mathematically certain, the permittee must review the control measures and perform any required corrective action immediately (or document why no corrective action is required), without waiting for the full 4 monitoring events, in accordance with Section V of this plan.If after modifying the control measures and conducting additional semiannual monitoring,the average of the most recent 4 monitoring events still exceeds the benchmark (or if an exceedance of the benchmark by the 4 event average is mathematically certain for the most recent 4 monitoring events), the permittee must again review the control measures and take one of the two actions above. Off-site and natural background pollutant levels Following the first 4 semiannual samples of benchmark monitoring(or sooner if the exceedance is triggered by less than 4 monitoring events),if the average concentration of a pollutant exceeds a benchmark value, and the permittee determines that exceedance of the benchmark is attributable solely to the presence of that pollutant in the natural background or in"run-on"entering from off-site, the permittee is not required to perform corrective action or additional benchmark monitoring provided all of the following conditions are met. • The average concentration of the benchmark monitoring results is less than or equal to the concentration of that pollutant in the natural background or off-site run-on; • The permittee documents and maintains with the Plan the supporting rationale for concluding that benchmark exceedances are in fact attributable solely to natural background or off-site pollutant levels.The permittee must include in the supporting rationale any data previously collected by them or others that describe the levels of natural background pollutants in the stormwater discharge; • The permittee demonstrates that the diversion of off-site run-on containing these pollutant levels is not feasible or practicable; • The permittee notifies the commissioner on the final semiannual benchmark monitoring report that the benchmark exceedances are attributable solely to natural background or off-site pollutant levels; and • The commissioner issues a written approval of the permittee's documentation demonstrating that the benchmark exceedances are attributable solely to natural background or off-site • pollutant levels. 16 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT Natural background pollutants include those substances that are naturally occurring in rainfall, soils or groundwater. Natural background pollutants do not include legacy pollutants from earlier activity on the site. All semi-annual monitoring results must be submitted to DEEP on a Stormwater Monitoring Report (SMR) form within 90 days of the date of monitoring. K. Schedules and Procedures The permittee shall document in the Plan the schedules and procedures for implementation of control measures, monitoring and inspections. These include but are not limited to: sweeping, waste management practices and other good housekeeping measures; regular inspections, testing, maintenance, and repair of all industrial equipment and systems potentially exposed to stormwater; procedures for preventing and responding to spills and leaks; employee training; routine, semiannual and any other inspections; visual monitoring; and any quarterly, semiannual, effluent limitation and/or impaired waters monitoring. The permittee or his or her representative shall conduct weekly visual inspections of the facility, focusing on control measures,good housekeeping, and preventative maintenance. These procedures are detailed in Section II E of this plan. The permittee or his or her representative shall conduct quarterly (four times per year) visual monitoring of stormwater discharges for the duration of the permit. The procedures for this monitoring are detailed in Section II of this plan. Semi-Annual (twice per year) monitoring of stormwater discharges shall be conducted in accordance with the procedures detailed in Section 11-f of this plan. Training shall be conducted annually in accordance with the procedures detailed in Section IV of this plan. The permittee must provide for qualified personnel to conduct comprehensive site inspections at least twice per year. The procedures for these inspections are detailed in Section V of this plan. III.DEADLINES FOR PLAN PREPARATION AND COMPLIANCE Prepared in accordance with registration.The permittee shall perform all actions required by such Plan upon obtaining permit coverage, and shall maintain compliance with such Plan thereafter. IV.SIGNATURE AND PLAN REVIEW A.The Plan shall be signed as follows: 17 Anchor Engineering Services,Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor,CT (i) for a corporation, by a responsible corporate officer or a duly authorized representative thereof, as those terms are defined in section 22a-430-3(b)(2) of the Regulations of Connecticut State Agencies; (ii) for a municipality, state, federal, or other public agency, by either a principal executive officer or a ranking elected official, as those terms are defined in section 22a-430-3(b)(2) of the Regulations of Connecticut State Agencies; (iii) for a partnership or a sole proprietorship, by a general partner or the proprietor, respectively. When a Plan is signed by a duly authorized representative, a statement of authorization shall be included in the Plan. The Plan shall also be certified, in accordance with "Plan Certification" (Section 5(c)(7)) of this general permit, by a professional engineer licensed in the State of Connecticut or a Certified Hazardous Materials Manager. =—Theshall be retained on-site at the facility at all times. B. Signature and Plan Review • Any document, including but not limited to any notice, which is required to be submitted to the Commissioner of the CTDEEP under the General Permit by the permittee shall be signed by the permittee and by the individual or individuals responsible for preparing such document, each of who shall certify in writing as follows: "I have personally examined and am familiar with the information submitted in this document and all attachments thereto, and I certify that, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief. I understand that a false statement made in the submitted information may be punishable as a criminal offense, in accordance with section 22a-6 of the Connecticut General Statutes, pursuant to section 53a-157b of the Connecticut General Statutes, and in accordance with any other applicable statute. I certify that this permit registration is on complete and accurate forms as prescribed by the commissioner without alteration of the text. I also certify under penalty of law that I have read and understand all conditions of the General Permit for the Discharge of Stormwater Associated with Industrial Activity effective on October 1, 2011, that all conditions for eligibility for authorization under the general permit are met, all terms and conditions of the general permit are being met for all discharges which have been initiated and are the subject of this registration, and that a system is in place to ensure that all terms and conditions of this general permit will continue to be met for all discharges authorized by this general permit at the site.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowingly making false statements." 18 Anchor Engineering Services,Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. 41 South Windsor, CT Permittee: Date: Karl Reichle Town of South Windsor Preparer: Date: Tom Dzagan Anchor Engineering Services, Inc. V. KEEPING THE PLAN CURRENT The permittee shall amend the Plan whenever; (A) there is a change at the site which has an effect on the potential to cause pollution of the surface waters of the state; (B) the actions required by the Plan fail to ensure or adequately protect against pollution of the surface waters of the state; or • (C) the Commissioner requests modification of the Plan; (D) the permittee is notified that they are subject to requirements because the receiving water to which the industrial activity discharges has been designated as impaired under Section 303(d) of the Clean Water Act and as identified in the most recent State of Connecticut Integrated Water Quality Report; (E) the permittee is notified that a TMDL to which the permittee is subject has been established for the stormwater receiving water; (F) necessary to address any significant sources or potential sources of pollution identified as a result of any inspection or visual monitoring; (G) required as a result of monitoring benchmarks or effluent limitations in"Monitoring' (Section 5(e)) or"Additional Requirements for Certain Sectors" (Section 5(0). The Plan shall be amended and all actions required by the Plan shall be completed within one hundred twenty (120) days (or within another interval as may be specified in this general permit or as may be approved in writing by the Commissioner) of the date the permittee becomes aware or should have become aware that any of the conditions listed above has occurred. • If significant changes are made to the site or to the Plan in accordance with paragraphs 5(A)-(G) above, the Plan shall be recertified in accordance with the "Non-Stormwater Discharges" (Section 5(b)(11)) and "Plan Certification" (Section 5(c)(7)) sections of this general permit, by a professional engineer 19 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT licensed to practice in the State of Connecticut or a Certified Hazardous Materials Manager. The permittee shall maintain compliance with such Plan thereafter. Revisions to the Plan are presented in Appendix F. VI. Failure to Prepare or Amend Plan In no event shall failure to complete or update a Plan in accordance with the "Development of Plan" (Section 5(c)(1)) and "Keeping Plan Current" (Section 5(c)(5)) sections of this general permit relieve a permittee of responsibility to implement actions required to protect the surface waters of the state, complete any actions that would have been required by such Plan, and to comply with all conditions of the permit. VII. Plan Certification The Plan shall contain the following certification, signed by a professional engineer licensed to practice in the State of Connecticut or a Certified Hazardous Materials Manager: "I certify that I have thoroughly and completely reviewed the Stormwater Pollution Prevention Plan prepared for this site. I further certify, based on such review and site visit by myself or my agent, and on my professional judgment, that the Stormwater Pollution Prevention Plan meets the criteria set forth in the General Permit for the Discharge of Stormwater Associated with Industrial Activity effective on October 1, 2011. I am aware that there are significant penalties for false statements in this certification, including the possibility of fine and imprisonment for knowingly making false statements." Date: Matthew N.Brown, P.E.(CT 22019) Anchor Engineering Services, Inc. VIII. Inspections 1. Semi-Annual Inspections The permittee must provide that qualified personnel shall conduct comprehensive site inspections at appropriate intervals specified in the Plan, but in no event less frequently than twice a year. Such evaluations shall, at a minimum, include: A. Visual inspection of material handling areas and other potential sources of pollution identified in • the Plan for evidence of, or the potential for, pollutants entering the stormwater drainage system. Structural stormwater management measures, erosion control measures, control measures and other structural pollution prevention measures identified in the Plan shall be observed to ensure 20 Anchor Engineering Services,Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT that they are implemented and maintained properly. A visual inspection of equipment needed to implement the plan, such as spill response equipment, shall be made. Inspections should be made during rainfall events if possible. B. Preparation of a report summarizing the scope of the inspection, personnel making the inspection, the date(s) of the inspection, major observations relating to the Plan, actions taken, and updates made to the Plan shall be made and retained as part of the Stormwater Pollution Prevention Plan for at least five years.The report shall be signed by the permittee. 2. Routine Inspections In addition to the Semi-Annual Inspections required above, the permittee shall identify in the Plan qualified personnel to visually inspect designated equipment and specific sensitive areas of the site at least monthly.A written set of tracking or follow-up procedures shall be used to ensure that appropriate actions are taken in response to the inspections. Records of routine inspections shall be maintained in the Plan kept on-site. The team leader is designated to perform routine inspections. Inspection records and tracking procedures are presented in Appendix E. 21 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX A General Permit Registration Form,Site Location Map, DEEP General Permit Note: All yellow fields are required General Permit Registration Form for the Discharge of Stormwater Associated with Industrial Activity CPPU USE ONLY Prior to completing this form, you must read the instructions for the App#: subject general permit at: DEP-PED-INST-14 This form must be filled out electronically before being printed. You must submit the registration Doc#: fee along with this form. Check#: The status of Your registration can be checked on the DEP website. Please note that DEP will no longer automatically mail certificates of registration. A certificate of registration can be requested upon approval of registration at DEP.stormwatorstaff(a)-ct.gov Part I: Registration Type Select the appropriate boxes identifying the registration type and registration deadline. Registration Type Registration Deadline Renewal 0 Existing Permit No. GSI 1000176 June 1, 2011 Are you a new operator? ❑ Yes 0 No ❑ For new registrants, without an electronically New Registration available Pollution Prevention Plan: Ninety (90) days prior to the initiation of the industrial activity ❑ With an electronically available Pollution Prevention Plan: Sixty (60) days prior to the initiation of the industrial activity Replacement of For new registrants, without an electronically NP'DES ❑ available Pollution Prevention Plan: Ninety (90) days If selected, please prior to the initiation of the industrial activity provide in the space below permit#'s for previously authorized discharge(s) With an electronically available Pollution Prevention Plan: Sixty (60) days prior to the initiation of the industrial activity Without an electronically available Pollution Prevention Plan: ❑ Modification Ninety(90) days prior to the initiation of the industrial activity (new or modified discharges) With an electronically available Pollution Prevention Plan: ❑ Sixty(60) days prior to the initiation of the industrial activity If there are any changes or corrections to your company/facility or individual name, mailing address or billing address or contact information, please,complete and submit the Change Request Information Form (Request to *nge Company/Individual Information)to the address indicated on the form. For any other changes, you must �, ntact the specific program from which you hold a DEP permit. If there is a change in ownership, please contact the Permit Assistance Office for questions concerning permit transfers at 860-424-3003. Bureau of Materials Management and Compliance Assurance 1 of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Part II: Fee Information Note: All yellow fields are required ❑X A fee of$250.00 applies to: • Municipalities (50% discount of$500 fee per CGS 22a-6) i� ❑ A fee of$500.00 applies to: • Companies that employ fewer than fifty(50) employees statewide (excluding seasonal employees employed no more than 120 days in a year) or have gross annual sales of less than five (5) million dollars • Municipal, federal or state operated industrial activities • Small scale compositing facilities. ❑ A fee of$1,000.00 applies to: • Companies that employ fifty(50) or more employees statewide(excluding seasonal employees employed no more than 120 days in a year) and have gross annual sales of greater than five (5) million dollars The registration will not be processed without the fee. The registration fee is non-refundable and shall be paid by check or money order payable to the Department of Environmental Protection. Part III: Registrant Information • If a registrant is a corporation, limited liability company, limited partnership, limited Liability partnership, or a statutory trust, it must be registered with the Secretary of State. If applicable, registrant's name shall be stated exactly as it is registered with the Secretary of the State. The information can be accessed at • If a registrant is an individual, provide the legal name (include suffix) in the following format: First Name; Middle Initial; Last Name; Suffix(Jr, Sr., II, III, etc.). 1. Registrant/Client Name: ITown of South Windsor Registrant Type: I Municipality If a business type, list type (e.g., corporation, limited partnership, etc.): I N/A Secretary of the State Business ID#: Mailing Address: 1540 Sullivan Avenue City/Town: South Wiindsor State: CT Zip Code:106074 Business Phone: (860) 648-6366 Ext.: Fax: (860) 644-8027 Contact Person: I Mr. Karl Reichle Title: Superintendent of Operations Email: karl.reichle@southwindsor.org Additional Phone Number(if applicable): Ext: 2. Registrant's interest in property or facility at which the proposed activity is to be located: (Industrial activity operators are required to register for this permit). (Check all that apply) ❑X Site Owner ❑ Lessee ❑ Operator ❑ Other(specify) Bureau of Materials Management and Compliance Assurance 2 of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Part III: Registrant Information (Continued) Note: All yellow fields are requwred #3.TBilling contact, if different than the registrant. me as registrant onact Person: Title: Mailing Address: City/Town: State: CT Zip Code: Business Phone: Ext.: ❑� Fax: Email: 4a. Primary contact for departmental correspondence and inquiries, if different than the registrant. ❑X Same as registrant Contact Person: Title: Mailing Address: City/Town: I State: CT Zip Code: Business Phone: Ext.:�� Fax: Email: Onsite contact if registrant is out of state. ❑X Not Applicable ❑ Same as registrant Contact Person: Title: Mailing Address: City/Town: 1 State: Zip Code: Business Phone: Ext.:= Fax: Email: 5• List engineering consultant, attorney or other representative employed or retained to assist in preparing the registration or maintaining permit compliance. Consultant/Firm Name: Anchor Engineering Services, Inc. = Consultant Type:I Engineer Mailing Address:141 Sequin Drive City/Town: Glastonbury State: CT Zip Code: 06033 —� Business Phone: (860) 633-8770 Ext.: Fax: (860)633-5971 I Email: I mbrown@anchorengr.com Service Provided:I registration preparation Bureau of Materials Management and Compliance Assurance 3 of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Part IV: Site Information Note: All yellow fields are required'. 1. Is name of site the same as the Registrant/Client Name? ❑X Yes ❑ No Site Name: Street Address Location Description: 1157 Burgess Road Department of Public Works Facility City/Town: South Windsor State: CT Zip Code: 06074 2. Primary four digit Standard Industrial Classification (SIC) Code for industrial activities: 9199 a. Primary SIC description: general government not elsewhere classified b. For activities without a specific SIC code, provide a description: 3. Are you a small scale composting facility composting horse manure and/or bedding? ❑ Yes ❑X No Note: If Yes, then you are required to submit a Pollution Prevention Plan with your registration. 4. a. Is the site located in a 100 yr floodplain, as defined and mapped under 44 CFR 59. ❑ Yes ❑X No b. Is the site within 250 feet of a well utilized for potable drinking water supply or within a ❑ Yes ❑X No Level A aquifer protection area as defined by mapping pursuant to section 22a-354c of the Connecticut General Statutes. c. Are you proposing to authorize a stormwater discharge from a new road salt or ❑ Yes ❑X No de-icing materials storage facilities at the site in question? Note: If you answered Yes to questions 4c and 4a and/or 4b, you are not eligible to register under this permit. Call DEP staff at 860-424-3018 to discuss other permitting options. 5. a. Is there exposure or the potential for exposure of your stormwater discharge ❑ Yes ❑X No to mercury? b. Is there exposure or the potential for exposure of your stormwater discharge to ❑ Yes X❑ No Polychlorinated biphenyles (PCBs)? If you answered Yes to 5a. or 5b, you may be required to conduct additional monitoring. Refer to Impaired Waters Monitoring Requirements Tablefor specific monitoring information for your site. Monitoring requirements are listed by Watershed ID#or 305 B ID#, refer to Part V, section 3 of the Registration Instructions DEP-PED-INST-lAor information on how to find your ID #. 6. Do you have any stormwater point source discharges to the ground? ❑ Yes ❑X No If Yes, then fill out Table 4. in Part V of this form. 7. INDIAN LANDS: Is or will the facility be located on federally ❑ Yes ❑X No recognized Indian lands? Bureau of Materials Management and Compliance Assurance 4 of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Note: All yellow fields are required Part IV: Site Information (continued) 8. COASTAL BOUNDARY: Is the activity which is the subject of this registration located ❑ Yes ❑X No Wit the coastal boundary as delineated on DEP approved coastal boundary maps? The coastal boundries fall within the following towns: Branford, Bridgeport, Chester, Clinton, Darien, Deep River, East Haven, East Lyme, Essex, Fairfield, Greenwich, Groton (City and Town of) Old Lyme, Guilford, Hamden, Ledyard, Lyme, Madison, Milford, Montville, New London, New Haven, North Haven, Norwalk, Norwich, Old Saybrook, Orange, Preston, Shelton, Stamford, Stonington (Borough and Town of), Stratford, Waterford, West Haven, Westbrook and Westport. If Yes, and this registration is for a new authorization, you must submit a Coastal Consistency Review Form (DEP APP-004) with your registration as Attachment B. Information on the coastal boundary is available at the local town hall or on the Coastal Boundary Mar, Additional DEP Maps and Publications are available at 860-424-3555. 9. ENDANGERED OR THREATENED SPECIES: Is the project site located within an ❑X Yes ❑ No area identified as a habitat for endangered, threatened or special concern species as identified on the "State and Federal Listed Species and Natural Communities Map"? Date of Map Used for Determination: 12/1/2010 If Yes, complete and submit a Request for NDDB State Listed Species Review Form (DEP-APP-007)to the address specified on the form. Note: NDDB review generally takes 4 to 6 weeks and may require additional documentation from the registrant. DEP strongly recommends that registrants complete this process before submitting the subject registration. The CT NDDB response must be submitted with this completed registration as Attachment C . For more information visit the DEP website at Natural Diversity Data or call the NDDB at 860-424-3011. 10. AQUIFER PROTECTION AREAS: Is the site located within a town required to ❑ Yes ❑X No establish Aquifer Protection Areas, as defined in section 22a-354a through 354bb of the General Statutes (CGS)? If yes, is the site within an area identified on a Level A or Level B map? ❑ Yes ❑ No To view the applicable list of towns and maps visit the DEP website at Aquifer Protection Areas. For more information about the Aquifer Protection Areas, call 860-424-3020. 11. CONSERVATION OR PRESERVATION RESTRICTION: Is the property subject to ❑ Yes ❑X No a conservation or preservation restriction? Bureau of Materials Management and Compliance Assurance 5 Of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Note: All yellow fields are required Part V: Stormwater Discharge Information Table 1 1. Identify the type, material, size and location of conveyances, outfalls, or channelized flows that convey your discharges: d) Note: To find lat/long, go to:CT ECO. Directions on e)What method was how to find Lat./Long on CT Outfall # a) Type b) Pipe Material c) Pipe Size In used to obtain your Inches Eco can be found in Part V, latitude and longitude section d. of the instructions information? DEP-PED-INST-14. Longitude Latitude DSNO01 swale -72.58621 41.83666 CT ECO Table 2 2. Identify discharges which drain to non fresh-tidal wetlands. b) If the stormwater discharge is within 500' of a non fresh tidal wetland, Outfall # a) Is stormwater discharge within 500' is the volume of runoff from of a non fresh tidal wetland? 1" rainfall retained on site to meet the requirements of section 5(a)(1) of the subject permit? DSNO01 NO Confirm that runoff(to non-fresh tidal wetlands)from 1" of rainfall is NOT retained for any discharges listed above Bureau of Materials Management and Compliance Assurance 6 of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Note: All yellow fields are required Part V: Stormwater Discharge Information (Continued) is Table 3 3. Provide the following information about the receiving water(s)/wetiand(s)that receive stormwater runoff from your site, either directly and/or through the Municipal Separate Storm Sewer System (MS4): a) To what system or If you answered yes to question receiving water does b)What is your watershed ID c.1., then answer the question your stormwater runoff (Freshwater)or 305b ID below. discharge? (Estuary)? Select either"MS4"or c.1 Is our Outfall# "we Select either"Mbody". ) y c.2) Has any Total Maximum Daily (Section 3.b., of the receiving water Load(TMDL)been approved for (If you select MS4, instructions DEP-PED-INST-14 identified as an your receiving waterbody? columns c.1&2 of this explains how to find this impaired water? table are not required information) to be completed) DSNO01 Wetlands/Waterbody 4000-19-1-L1 NO Table 4 4. The following table must be filled out ONLY if you have a discharge to the ground. Provide information of any stormwater discharge(s)to the ground through Class V injection wells. Note that this permit does not authorize discharges to the ground. This information is for informational purposes only. For additional information visit EPA Groundwater Class V. c) Discharge d)Latitude/Longitude e) What method Volume Note: To find lat/long, go to:CT ECO. Directions was used to a) Well b) Description of (average on how to use CT Eco to find Lat/Long are found obtain your Identifier Discharge flow/gallons in Part V, section d cVEP-PED-INST-14 latitude and per day) longitude' p y) Longitude Latitude information? Bureau of Materials Management and Compliance Assurance 7 of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Part VI: Pollution Prevention Plan Availability I Note: All yellow fields are required If available, provide an internet address (URL)where the Plan required by Section 5(c)of the subject general permit is accessible for public review. ❑ Check here for facilities that will be making an electronic Plan available pursuant to Section 4(c)(2)(H) &(D) of the subject general permit. Provide an email address of the contact person from which to obtain the plan. Email Address: URL: Internet Address (URL)where the Plan will be electronically available. ❑X Check here for facilities that will not be making an electronic Plan available pursuant to Section 4(c)(2)(H)& (D) of the subject general permit. Part VII: Confidential Information in the Pollution Prevention Plan If the registrant claims that certain elements of their Plan constitute a trade secret or are otherwise exempt from the disclosure requirements of the state Freedom of Information Act(FOIA), they shall follow the procedure below regarding information subject to FOIA requirements: Does your plan withhold certain confidential information from the public? ❑ Yes ❑X No Please see directions below regarding withholding information. Instructions for plan confidentiality: Under the Connecticut Freedom of Information Act(FOIA), a Registrant may have reason to withhold from public disclosure certain information in a plan or document prepared and maintained pursuant to a requirement of the general permit. Such information in a plan or document may be redacted provided the Registrant makes specific notation on the registration form filed with the Department: (1)that such claim is being made with a brief explanation of the type of information being withheld or redacted and the reason(s) therefore; and (2)of the location within the plan or document where such information has been redacted or removed. A plan or document that is being made available for public review either on a website or provided directly to a member of the public as a hardcopy may be in its redacted form. However, when the Department requests such plan or document be submitted for Department review, the Department will require that it be submitted in its unredacted form, in which case the Registrant must specify the information within such plan or document that is claimed to be confidential with the specific notations described above. The Department will not release any such information to the public which the Registrant claims must be withheld unless a determination has been made by the Department and any subsequent appeal of such determination filed with the Connecticut Freedom of Information Commission results in a determination that such information shall not be withheld from the public. If the Registrant seeks a determination regarding such claim of confidentiality from the Connecticut Freedom of Information Commission without obtaining a prior determination from the Department, the Registrant shall notify the Department in writing of such pending determination, at which time the Department will not release such information to the public unless otherwise determined by the Connecticut Freedom of Information Commission. Bureau of Materials Management and Compliance Assurance $ Of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Note: All yellow fields are required Part VIII: Registrant Certification Oe registrant and the individual(s) responsible for actually preparing the registration must sign this part. A registration will be considered incomplete unless all required signatures are provided. "I have personally examined and am familiar with the information submitted in this document and all attachments thereto, and I certify that, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief. I understand that a false statement made in the submitted information may be punishable as a criminal offense, in accordance with Section 22a-6 of the Connecticut General Statutes, pursuant to Section 53a-157b of the Connecticut General Statutes, and in accordance with any other applicable statute. I certify that this permit application is on complete and accurate forms as prescribed by the commissioner without alteration of the text. I also certify under penalty of law that I have read and understand all conditions of the General Permit for the Discharge of Stormwater from Industrial Activity issued on August 23, 2010(effective date of October 1, 2011), that all conditions for eligibility for authorization under the general permit are met, all terms and conditions of the general permit are being met for all discharges which have been initiated and are the subject of this registration, and that a system is in place to ensure that all terms and conditions of this general permit will continue to be met for all discharges authorized by this general permit at the site. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowingly making false statements." Signature of Registrant Date Karl Reichle Superintendent of Operations Name of Registrant (print or type) Title (if applicable) Signature of Preparer(if different than above) Date Patrick J. McKay Environmental Scientist Name of Preparer(print or type) Title (if applicable) Bureau of Materials Management and Compliance Assurance g of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 Part IX: Summary page / Supporting Documentation Note: All yellow fields are required The list below identifies each attachment required to be submitted with this registration form. When submitting any supporting documents, please label the documents as indicated below(e.g., Attachment A, etc.)and be sur to include the registrant's name as indicated on this registration form. X Attachment A: An 8 %"X 11" copy of the relevant portion of a USGS Quadrangle Map with a scale of 1:24,000, showing the exact location of the facility needs to be submitted with this registration. Indicate the quadrangle name on the map, and be sure to include the registrant's name. (To obtain a copy of the relevant USGS Quadrangle Map, call your town hall or DEP Maps and Publications Sales at 860-424-3555) ❑ Attachment B: Coastal Consistency Review Form (DEP-APP-004), if applicable. X Attachment C: Request for NDDB State Listed Species Review Form (DEP-APP-007) and additional documentation, if applicable. ❑ Attachment D: Conservation or Preservation Restriction Information, if applicable. ❑ Attachment E: Documentation regarding discharges within 500 feet of a tidal wetland that is not a fresh-tidal wetland, needs to submitted with this registration, if applicable. ❑ Attachment F: Small scale composting facilities (composting horse manure and bedding only) are automatically required to submit a pollution prevention plan. 0 A payment in the amount of$250.00 ❑ A payment in the amount of$500.00 ❑ A payment in the amount of$1,000.00 Note: Please submit the fee along with a completed, printed and signed Registration Form and all additional supporting documents to: CENTRAL PERMIT PROCESSING UNIT DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD, CT 06106-5127 Bureau of Materials Management and Compliance Assurance 10 of 10 DEP-PED-REG-014 Form last modified: 5/12/2011 6033 01AN 41 Sequin Drive TOWN OF SOUTH WINDSOR GlastoCHOR Phone (860 CT -8770 DEPARTMENT OF PUBLIC WORKS FACILITY Phone:<860)633-8770 Fax:(860)633-5971 157 BURGESS ROAD, SOUTH WINDSOR, CT o 8A a mac. ` ♦ `• `'84 IL i Bypt � �!. '•ire '� � t t,J' 1 �' )80 <y� O�StBEffln /%� ` V' _-�. ..._STR .,_� ,R�OO ^-a i!�'•L � ' �o .l ��;� h :� �i �. SITE LOCATION �T - n r...-.- 1 ` -^�•-�.:-_.-- ir+ JF , FJ f � 1> ' 77 � 4 "�' i• l� ,r,�. gyp( ` n,ts��� p yam•=�'.y�'a�-+a•!�� (' \.� •! � �� I;M '1 �� �3�;F-��•V _\ � t Yx •.rr`_.�•..,y .e.� `•� � J J i, tt`� �./ f•E7F ` t •�f'�,e sib \ ••�`-' � ���E'"I.Vv��A"'— '�f/ /' `; t �� " � • �� �� �•• Z c 1�ia�r� . r, Jl.•'` r J---�i t � L l� �r�_ -t ,� '-'. !� - � ..� :�♦ , ,ry`4+^ ,,E��z, s . , C'' .:'_ I+ �'.}� 3.J \ .t(., �.s �Oi�ff� `_'•-� ��•�V.r on ,� -� fr` �7t,�i,i �k t\".7• y C� •F 'v`.�. °' ,. - - 4 �` i -�• 1} is a -Tl f.� .. Y � �.�t .i,'�� r r 1• ,�t�, - � _�`'.� �'J fi•-i.-- —.'.�', �� � JW�%� S 3 t fl,=� N USGS TOPO FIGURE QUAD#38 W--Q' s E Feet ATTACHMENT A 0 1,000 2,000 4,000 6,000 PROJECT DATE MANCHESTER,CT S O47-10 5/17/11 120) Request for Natural Diversity Data Base NDDB State Listed Species Review DEP USE ONLY All requesters must completely fill out Parts I -VII of this form and submit Attachments A and B, or the request will be rejected as incomplete. Request No. There are no fees associated with NDDB Reviews. Hardcopy Electronic files Part I: Preliminary Screening Before submitting this request, you must review the Natural Diversity Data Base"State and Federal Listed Species and Significant Natural Communities Maps"found on the DEP website. Follow the instructions on the map or in this form's instruction document.These maps are updated twice a year, usually in June and Decem ber. Does your site, including all affected areas, meet the screening criteria according to the instructions: ® Yes ❑ No Enter the date of the map reviewed for pre-screening: December 2010 NDDB Part II: Requester Information *If the requester is a corporation,limited liability company,limited partnership,limited liability partnership,or a statutory trust,it must be registered with the Secretary of State.If applicable,the company name shall be stated exactly as it is registered with the Secretary of State. If the requester is an individual,provide the legal name(include suffix)in the following format.First Name;Middle Initial,Last • Name;Suffix(Jr, Sr., ll, lll, etc.). 1. Requester Company Name*:Anchor Engineering Services, Inc. Name: Patrick McKay Address: 41 Sequin Drive City/Town: Glastonbury State: CT Zip Code: 06033 Business Phone: 860 633-8770 ext. Fax: 860 633-5971 Requester can best be described as: ® Business Entity ❑ Federal Agency ❑ Municipal govt. ❑ State agency ❑ Individual ❑ Tribe ❑ Other(specify): Acting as(Affiliation), pick one: ❑ Property owner ® Consultant ❑ Engineer ❑ Facility owner ❑ Applicant ❑ Biologist ❑ Pesticide Applicator ❑ Other representative(specify): 2. List Primary Contact to receive Natural Diversity Data Base correspondence and inquiries, if different from requester. Company: Contact Person: Title: Mailing Address: City/Town: State: Zip Code: • Business Phone: ext. Fax: Email: DEP-APP-007 1 of 4 Rev.08/10/10 Part II: Requester Information (continued) Affiliation of primary contact, check one: ❑ Property owner ® Consultant ❑ Engineer ❑ Facility owner ❑ Applicant ❑ Biologist ❑ Pesticide Applicator ❑ Other representative(specify): 3. Project Type: Choose Project Type: Stormwater/waste/water discharge , If other describe: Part III: Site Information This request can only be completed for one site.A separate request must be filed for each additional site. 1. Site Location Site Name or Project Name: Town of South Windsor Department of Public Works Facility Town(s): South Windsor Street Address or Location Description: 157 Burgess Road Size in acres, or site dimensions: approx.40.54 Latitude and longitude of the center of the site in decimal degrees (e.g., 41.23456-71.68574): Latitude:41.83613 Longitude: -72.58139 Method of coordinate determination(check one): ❑ GPS ® Photo interpolation using CTECO map viewer ❑ Other(specify): 2a. Describe the current land use and land cover of the site. The subject property is a municipal public works facility. The eastern area of the site is paved but the majority of the site is unpaved, including a closed municipal landfill. b. Check all that apply and enter the size in acres or%of area in the space after each checked category. ® Industrial/Commercial 100% ❑ Residential ❑ Forest ❑ Wetland ❑ Field/grassland ❑ Agricultural ❑ Water ❑ Utility Right-of-way ❑ Transportation Right-of-way ❑ Other(specify): Part IV: Project Information 1. Is the subject activity limited to the maintenance, repair, or improvement of an existing structure within the existing footprint? ❑ Yes ® No If yes, explain. • DEP-APP-007 2 of 4 Rev.08/10/10 Part IV: Project Information (continued) 2. Give a detailed description of the activity which is the subject of this request and describe the methods and equipment that will be used. The site is re-registering under the DEP General Permit for the Discharge of Industrial Stormwater. The site is utilized as a municipal public works facility to store and maintain a variety of vehicles and equipment utilized by the Town of South Windsor(trucks, mowers, plows,etc.).Vehicle maintenance and repairs are conducted inside the garage building. Leaves are composted on the site,and the site also contains a salt storage building utilized for winter road maintenance. 3. Provide a contact for questions about the project details if different from Part II primary contact. Name: Phone: Email: Part V: Request Type and Associated Application Type Check one box from either Group 1 or Group 2,indicating the appropriate category for this request. Group 1. If you check one of these boxes,fill out Parts I—VII of this form and submit the required attachments A and B. ❑ Preliminary screening was negative but an NDDB review is still requested ❑ Request regards a municipally regulated or unregulated activity(no state permit/certificate needed) ❑ Request regards a preliminary site assessment or project feasibility study ❑ Request relates to land acquisition or protection ® Request is associated with a renewal of an existing permit,with no modifications Group 2. If you check one of these boxes,fill out Parts I—VII of this form and submit required attachments A, B,and C. ❑ Request is associated with a new state or federal permit application ❑ Request is associated with modification of an existing permit ❑ Request is associated with a permit enforcement action ❑ Request regards site management or planning, requiring detailed species recommendations ❑ Request regards a state funded project,state agency activity,or CEPA request If you are filing this request as part of a state or federal permit application enter the application information below. Permitting Agency and Application Name: State DEP Application Number,if known: State DEP Enforcement Action Number,if known: State DEP Permit Analyst/Engineer,if known: Is this request related to a previously submitted NDDB request? ❑ Yes ❑ No . Enter the previous NDDB Request Number(s), if known: DEP-APP-007 3 of 4 Rev.08/10/10 Part Vi: Supporting Documents • Please check each attachment submitted as verification that all applicable attachments have been supplied with this request form. Label each attachment as indicated in this part(e.g_, Attachment A, etc.)and be sure to include the requester's name, site name and the date. Please note that Attachments A and B are required for all requesters.Attachment C(DEP-APP-007C)is supplied at the end of this form. �® Attachment A: Overview Map: an 8 1/2"X 11"print/copy of the relevant portion of a USGS Topographic Quadrangle Map clearly indicating the exact location of the site. ® Attachment B: Detailed Site Map:fine scaled map showing site boundary details on aerial imagery with relevant landmarks labeled. (Site boundaries in GIS [ESRI ArcView shapefile, in NAD83, State Plane, feet]format can be substituted for detailed maps, see instruction document) ❑ Attachment C: Supplemental Information, Group 2 requirement(attached, DEP-APP-007C) ❑ Section is Supplemental Site Information and supporting documents ❑ Section ii: Supplemental Project Information and supporting documents Part VIi: Requester Certification The requester and the individual(s)responsible for actually preparing the request must sign this part. A request will be considered incomplete unless all required signatures are provided. "I have personally examined and am familiar with the information submitted in this document and all attachments thereto, and i certify that based on reasonable investigation, including my inquiry of the individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief." � - b/l PItJSignat of Req ster Date Patrick J. McKay Environmental Scientist Name of Requester(print or type) Title(if applicable) Signature of Preparer(if different than above) Date Name of Preparer(print or type) Title(if applicable) Note: Please submit the completed Request Form and all Supporting Documents to: CENTRAL PERMIT PROCESSING UNIT DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD, CT 06106-5127 • Or email request to: dep.nddbrequest@ct.gov DEP-APP-007 4 of 4 Rev.08/10/10 Attachment C: Supplemental Information, Group 2 requirement • Section is Supplemental Site Information 1. Existing Conditions Describe all natural and man-made features including wetlands,watercourses,fish and wildlife habitat, floodplains and any existing structures potentially affected by the subject activity. Such features should be depicted and labeled on the site plan that must be submitted. Photographs of current site conditions may be helpful to reviewers. ❑ Site Photographs(optional)attached ❑ Site Plan/sketch of existing conditions attached 2. Biological Surveys Has a biologist visited the site and conducted a biological survey to determine the presence of any endangered, threatened or special concern species ❑ Yes ❑ No If yes, complete the following questions and submit any reports of biological surveys, documentation of the biologist's qualifications, and any NDDB survey forms. Biologist(s)name: Habitat and/or species targeted by survey: Dates when surveys were conducted: ❑ Reports of biological surveys attached ❑ Documentation of biologist's qualifications attached ❑ NDDB Survey forms for any listed species observations attached Section ii: Supplemental Project Information 1. Provide a schedule for all phases of the project including the year, the month and/or season that the proposed activity will be initiated and the duration of the activity. 2. Describe and quantify the proposed changes to existing conditions and describe any on-site or off-site impacts. In addition, provide an annotated site plan detailing the areas of impact and proposed changes to existing conditions. i ❑ Annotated Site Plan attached DEP-APP-007C 1 of 1 Rev.08/10/10 41 Sequin Drive TOWN OF SOUTH WINDSOR Glastonbury,CT0603 ANCHOR Phone:(860)633-8770 DEPARTMENT OF PUBLIC WORKS FACILITY u Fax:(860)633-5971 157 BURGESS ROAD, SOUTH WINDSOR, CT —s v£z•`y, , •.4t1` r . - ;ram �� .• �/ _ f• �:� ,i ,r;�, �, y \�5' " •X i�'!�,{•, . / � ;+ `ty eat' /, . . +L. y k sue_ � > jL rickyaft )' 1 a r '„ µ j t 1} ♦ gab tote Ciaypi 41, to :.'r..:• •.�• - Bo-•f .-`i -' '1 t`.,i \\ t ,\ µ ( i '/f 'f '.\T !Q p � 1 \ �•�; \'`� t s. ti..��� so if •� ��4 air.`7 �a ,�o ..` .t, t Vt\ a�staEint i. a c tY l � _s ,•iA"r`3 sFR ." .'�'y� c ��Q 4,'`t�� ``� ) ? b• .,9T1�` t t�kh �• t —� .. SITE LOCATION y « `1 di ` .`;� `t7r r.s* 'r?r-�.a -•K:l: x.;c •v a.p. 11Y -C �.♦ 7.. i - l r i i l♦ \,--•�� r�,f\�" ��t sr + c> 99 >_� •t f � �.• � / � •.Mc�,tt u•�• �F_.-�[r`.,j T./L h ou �''t�'�''r x}rr`.`� `\•r ``• '+h '�_ � � �t J4rv3 ' L �a' .?m o-$. i t �, �1' .rr ;. - a qis P .r Y•+i�;te,` r /`f/(//{f ry�_ �. �'-� _ t �x •r + r.�.r�sA 4 .e `��� P 'f„'. .,�� '�-t r-� �t r�.� � �,t1 rs?s� �',..R 'c� •S, �� f4°�'�•.�'! - � +�. k�, \ � ' ..fin t*n- �. '.��i tt\€�j �7 4�J� rs�• �� � t � yr �� to �'�� .�,ti:7 _ v� - }�N,y�-, /.�_ '``� Q ' ° '!� tt'.t c� _ �` tie • �" �=�- ,t ; ��; t t�```" t � YJO���� ,.�o ��j#E N - USGS TOPO a FIGURE ATTACHMENT A (QUAD #38 �'/���E Feet 0 1,000 2,000 4,000 6,00o PROJECT DATE MANCHESTER,CT S O47-10 5/17/11 41 Sequin Drive TOWN OF • • Glastonbury,CT 06033 ANCHOR ♦ iPhone: .• • DEPARTMENT OF • ' .• ROAD,157 BURGESS • • Yo141. AV' i77- c SITE LOCATION Ac t . BURGESS ti� \ ROAD - Zi l\ . a FIGURE CT DEP 200 ' 0 • • PHOTO 1 + • DATE �° 5/17/11 Patrick McKay From: Patrick McKay Sent: Friday, May 20,2011 4:21 PM To: 'dep.nddbrequest@ct.gov' Subject: NDDB request for site at 157 Burgess Road, South Windsor Attachments: MX-3100N_20110520_145720.pdf Please See Attached NDDB Request Patrick J. McKay Environmental Scientist f) ANCHOR •11 Sccpin Drive Cliston6ury,(71'06033 P:960.611— ?o U:9W.6 3 3.5971 www.anclioren;r.com • 1 CT DEEP Joustrial Stormwater Registration Status Report Includes all Regi -. tions Permit coverage expires 9/30/2016 - Status (Updated Daily) received by 7/30/2013 PreventionSite Town Site Name & Client Name M Application Received Status Pollution Registra- Request Permit Author- Street Address # Date , Number Pan Posting CommentDate Date Period End Date SOUTH Name: ROLLING ROLLING FRITO- 201103960 05/26/2011 Issued Review and/or 6/2/2011 6/17/2011 GSI001769 10/1/2011 WINDSOR FRITO-LAY SALES, LAY SALES, LP Comment LP Address: 160 Period Closed NUTMEG RD S SOUTH Name: SOUTH SOUTH 2O1104716 06/01/2011 Issued Review and/or 6/8/2011 6/23/2011 6SI001980 10/1/2011 WINDSOR WINDSOR AUTO WINDSOR AUTO Comment PARTS Address: PARTS Period Closed SCHANCK ROAD SOUTH Name: SOUTH SOUTH 2O1105144 06/01/2011 Issued Review and/or 6/8/2011 6/23/2011 GSI000176 1o/1/2011 WINDSOR WINDSOR PUBLIC WINDSOR, Comment WORKS GARAGE TOWN OF Period Closed Address: 157 BURGESS RD SOUTH Name: The Nuway NUWAY 201104300 05/31/2011 Issued Review and/or 6/7/2011 6/22/2011 GSI002168 WINDSOR Tobacco Company TOBACCO Comment 10/1/2011 Address: 200 COMPANY,THE, Period Closed Sullivan Avenue SOUTHBURY Name: ROMATIC THE ROMATIC 201105823 06/01/2011 Issued Review and/or 6/8/2011 6/23/2011 GSI000422 10/1/2011 MANUFACTURING MANUFACTURIN Comment CO., INC G COMPANY, Address: 1200 Period Closed Main St S SOUTHBURY Name: TRANSPORTATI 201104045 05/26/2011 Issued Review and/or 6/2/2011 6/17/2011 GSI000061 SOUTHBURY ON, STATE OF Comment 10/1/2011 MAINTENANCE CONNECTICUT Period Closed FACILITY DEPARTMENT Address: 75 OLD OF STATE RD SOUTHBURY Name: TOWN OF 201105323 06/06/2011 Issued Review and/or 6/13/2011 6/28/2011 GSI001530 SOUTHBURY SOUTHBURY Comment 10/1/2011 TOWN HIGHWAY Period Closed GARAGE Address: 60 Peter Rd STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MATERIALS MANAGEMENT & COMPLIANCE ASSURANCE WATER PERMITTING AND ENFORCEMENT DIVISION (860)424-3018 eneral Permit for the._Discharge of Stormwater AssociatedJwith _Industrial-.-Activity Effective Date: October 1, 2011 Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 10/1/11 General Permit for the Discharge of Stormwater Associated with Industrial Activities Table of Contents Section 1. Authority 4 Section 2. Definitions 4 Section 3. Authorization Under This General Permit g (a) Eligible Activities 8 (b) Requirements for Authorization 8 (c) Registration 10 (d) No Exposure Certification 10 (e) Geographic Area 10 09 Effective Date and Expiration Date of this General Permit 10 (g) Effective Date of Authorization 10 (h) Revocation of an Individual Permit 11 (i) Issuance of an Individual Permit 11 Section 4. Registration Requirements 11 (a) Who Must File a Registration 11 (b) Scope of Registration 12 (c) Contents of Registration 12 (d) Availability of Registration and Plan 14 (e) Where to File a Registration 15 (fl Additional information 15 (g) Additional Notification 15 (h) Action by Commissioner 15 Section 5. Conditions of this General Permit 16 (a) Conditions Applicable to Certain Discharges 16 (b) Control Measures 16 (c) Stormwater Pollution Prevention Plan (Plan) 21 (d) Inspections 28 (e) Monitoring Requirements 29 (f) Additional Requirements for Certain Sectors 37 (g) Discharges to Impaired Waters 65 (h) Reporting&Record Keeping Requirements 65 (i) Regulations of Connecticut State Agencies Incorporated into this General Permit 66 Section 6. General conditions 67 (a) Reliance on Registration 67 (b) Duty to Correct and Report Violations 67 (c) Duty to Provide Information 67 (d) Certification of Documents 67 (e) Date of Filing 68 (f) False Statements 68 (g) Correction oflnaccuracies 68 (h) Transfer of A uth orization 68 (i) Other Applicable Law 68 (j) Other Rights 68 Section 7. Commissioner's Powers 69 (a) Abatement of Violations 69 (b) General Permit Revocation,Suspension, or Modification 69 . (c) Filing of an Individual Application 69 Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 2 of 69 10/1/11 Appendix A: Industrial Stormwater General Permit SIC Code Definitions Appendix B: Industrial Stormwater Monitoring Guidance Appendix C: Aquifer Protection Areas and Other Groundwater Drinking Supply Areas Guidance • Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 3 of 69 10/1/11 General Permit for the Discharge of Stormwater • Associated with Industrial Activity Section 1. Authority This general permit is issued under the authority of section 22a430b of the Connecticut General Statutes. Section 2. Definitions The definitions of terms used in this general permit shall be the same as the definitions contained in sections 22a423 and 22a-207 of the Connecticut General Statutes and section 22a430-3(a)of the Regulations of State Agencies.As used in this general permit,the following definitions shall apply: "25 year, 24-hour rainfall event"means the maximum 24-hour precipitation event with a probable recurrence interval of once in 25 years,as defined by the National Weather Service in Technical Paper Number 40,"Rainfall Frequency Atlas of the United States,"May 1961, and subsequent amendments,or equivalent regional or state rainfall probability information developed therefrom. "100 year, 24-hour rainfall event"means the maximum 24-hour precipitation event with a probable recurrence interval of once in 100 years,as defined by the National Weather Service in Technical Paper Number 40,"Rainfall Frequency Atlas of the United States,"May 1961,and subsequent amendments,or equivalent regional or state rainfall probability information developed therefrom. "Agricultural wastes"means organic materials normally associated with the production and • processing of food and fiber on farms,feedlots and forests. Such wastes may include,but are not limited to,manures,bedding materials,spilled feed or feed waste,and crop residues. "Aquifer protection area"means aquifer protection area as defined in section 22a-354h of the Connecticut General Statutes. "Authorized activity"means any activity authorized under this general permit. "Benchmark"means a standard by which stormwater discharge quality is measured as identified in section 5(e)(1)(13) of this permit. "Coastal area" shall be the same as the definition contained in section 22a-94 of the Connecticut General Statutes. "Coastal waters"shall be the same as the definition contained in section 22a-93(5) of the Connecticut General Statutes. "Commissioner"means the commissioner as defined by section 22a-2(b)of the Connecticut General Statutes. "Compost"means the product of composting. "Composting"means the process of accelerated aerobic biodegradation and stabilization of organic material under controlled conditions that results in a finished product called compost. "Department"means the department of environmental protection. is Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 4 of69 10/1/11 "Fresh-tidal wetland"means a tidal wetland with an average salinity of less than 0.5 parts per • thousand. "Grab sample"means an individual sample collected in less than fifteen(15)minutes. "Guidelines"means the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control,as amended,or as may be amended,established pursuant to section 22a-328 of the Connecticut General Statutes. "High tide line"shall be the same as that contained in section 22a-359(c)of the Connecticut General Statutes. "Impaired waters"means those surface waters of the state designated by the commissioner as impaired pursuant to Section 303(d)of the Clean Water Act and as identified in the most recent State of Connecticut Integrated Water Quality Report. "Individual permit"means a permit issued to a named permittee under section 22a430 of the Connecticut General Statutes. "Industrial activity"means any activity listed below with primary Standard Industrial Classification (SIC) codes as identified by"Standard Industrial Classification Manual, Executive Office of the President, Office of Management and Budget 1987" or a primary activity described in narrative form below: (1) An activity subject to stormwater effluent limitation guidelines,new source performance standards, or toxic pollutant effluent standards under 40 CFR Subchapter N as included in this • general permit; (2) An activity classified as Standard Industrial Classification 24(except 2434),26(except 265 and 267),28 (except 283 and 285),29,311,32(except 323), 33,3441 and 373; (3) An activity classified as Standard Industrial Classification 10 through 14(mining industry) including active or inactive mining operations that are not stabilized; or oil and gas exploration, production,processing,or treatment operations; or transmission facilities that discharge stormwater that has come into contact with any overburden,raw material,intermediate products,finished products,by-products or waste products; (4) Hazardous waste treatment,storage,or disposal facilities,including those facilities operating under interim status or a permit pursuant to section 22a-449(c)or 22a-454 of the Connecticut General Statutes; or hazardous waste transportation activities conducted pursuant to these statutes; (5) Recycling centers,resource recovery facilities and all such facilities and centers as defined in section 22a-207 of the Connecticut General Statutes,including facilities classified as Standard Industrial Classification 4953; solid waste facilities (where waste and/or leachate are exposed or potentially exposed to rainfall);intermediate processing facilities; or facilities that are subject to regulation under Subtitle D of the Resource Conservation and Recovery Act,42 U.S.C. sections 6901,etseq; (6) Facilities involved in the recycling(including assembling,breaking up,sorting and wholesale or retail distribution)of materials including metal scrap yards,battery reclaimers,salvage yards,and automobile junk yards,or those facilities classified as Standard Industrial Classification 5015 and 5093; Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 5 of69 10/1/11 (7) Steam electric power generating facilities classified as Standard Industrial Classification 4911, w including coal-handling sites for these facilities; (8) Transportation facilities classified as Standard Industrial Classifications 40,41,42(except 4221-25),44,45 or retail truck stops(within SIC 5541)that have maintenance or fueling operations. Also included in this definition are vehicle service and storage facilities(including, but not limited to,public works garages) operated by federal,state or municipal government which have vehicle maintenance or repair shops,equipment cleaning,fueling or maintenance operations,road salt storage,or airport deicing operations.Also included in this definition are yacht clubs(within SIC 7997)or boat dealers(SIC 5551)that have onsite engine service or repair,vehicle or equipment cleaning,painting operations,hull maintenance and repair (including,but not limited to,sanding, chemical stripping and painting)or fueling operations; (9) Treatment works with a design capacity of greater than one million gallons per day(1 MGD) treating domestic sewage(or any other sewage sludge or wastewater treatment device or system)used in the storage,treatment,recycling,and reclamation of municipal or domestic sewage,including land dedicated to the disposal of sewage sludge that is located within the confines of the facility. This definition does not include farm lands; domestic gardens or lands used for sludge management where sludge is beneficially reused and which are not physically located in the confines of the facility; or areas that are in compliance with 40 CFR 503; (10) An activity classified as Standard Industrial Classifications 20,21,22,23,2434,25,265,267, 27, 283,285,30,31 (except 311), 323,34(except 3441),35,36, 37(except 373),38, 39,4221 - 25, (provided the activity is not otherwise included within categories(2)through(9),(11)or (12)),and has material handling equipment or activities,raw materials,intermediate products, final products,waste materials,by-products or industrial machinery exposed to stormwater; • (11) Facilities classified as Standard Industrial Classification 5171 (Petroleum Bulk Stations and Terminals); (12) Road salt and deicing material storage facilities,including facilities storing pure salt or other deicing materials or deicing materials mixed with other materials; (13)Wood processing facilities not otherwise described under this subsection,including but not limited to,mulching,chipping, and mulch coloring for retail or wholesale; (14) Small-scale composting facilities(as defined in this section)where composting is the primary activity,business,or purpose of the facility.. "Inland wetland"means wetlands as that term is defined in section 22a-38 of the Connecticut General Statutes. "Intermediate processingfacility"means a facility where glass,metals,paper products,batteries, household hazardous waste, fertilizers and other items are removed from the waste stream for recycling or reuse. "Minimize",for purposes of implementing control measures in Section 5(b)of this general permit, means reduce and/or eliminate to the extent achievable using control measures that are technologically available and economically practicable and achievable in light of best industry practice. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 6 of 69 10/1/11 "Municipal separate storm sewer system"or "MS4" means conveyances for stormwater(including roads with drainage systems,municipal streets, catch basins, curbs,gutters,ditches,man-made channels or storm drains) owned or operated by any municipality and discharging to surface waters of the state. "Municipality"means a city,town or borough of the state. "Permittee"means any person who or municipality which initiates,creates,originates or maintains a discharge in accordance with Section 3 of this general permit. "Person"means person as defined by section 22a-2(c)of the Connecticut General Statutes. "Point Source"means any discernible,confined and discrete conveyance(including but not limited to, any pipe,ditch,channel,tunnel, conduit,discrete fissure,container,rolling stock,concentrated animal feeding operation,landfill leachate collection system,vessel or other floating craft)from which pollutants are or may be discharged. "Qualified Person or Qualified Personnel",for purposes of inspections and training,means any person familiar with the content,requirements and objectives of this permit and the facility's Stormwater Pollution Prevention Plan. "Recyclingfacility"or "recycling center"means land and appurtenances thereon and structures where recycling is conducted, including but not limited to,an intermediate processing facility as defined above. • "Registrant"means a person who or municipality which files a registration pursuant to Section 4 of this general permit. "Registration"means a registration form filed with the commissioner pursuant to Section 4 of this general permit. "Regulated Small Municipal Separate Storm Sewer System (MS4)"means any municipally-owned or-operated municipal separate storm sewer(as defined above) system authorized by the General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems(MS4 general permit)including all those located partially or entirely within an Urbanized Area and those additional municipally-owned or municipally-operated Small MS4s located outside an Urbanized Area as may be designated by the commissioner. "Retain"means to hold runoff on-site with no subsequent point source release to surface waters from a storm event defined in this general permit or as approved by the commissioner. "Sediment"means solid material,either mineral or organic,that is in suspension in water,is transported,or has been moved from its site of origin by erosion. "Site"means geographically contiguous land on which an authorized activity takes place or on which an activity for which authorization is sought under this general permit is proposed to take place.Non-contiguous land owned by the same person and connected by a right-of-way,which such person controls,and to which the public does not have access,shall be deemed the same site. "Small-scale compostingfacility"means a facility conducting composting, excluding farms composting agricultural wastes integral to the farming operation,that is located on two acres or less, sand that processes less than 5,000 cubic yards per year of one or more of the following source separated organic materials,including but not limited to: horse manure and bedding; food scraps Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 7 of 69 10/1/11 from cafeterias and other food preparation establishments; grocery store organics; food processing residuals; spoiled produce;soiled paper; waxed corrugated cardboard; compostable packaging; and including carbon-based bulking agents such as sawdust,woodchips,and leaves. "Source separated organic material"or "SSOM"means organic material that is intended to be recycled or composted and has been separated from other solid waste at the point of generation. "Stormwater"means waters consisting of rainfall runoff,including snow or ice melt during a rain event but not including mine dewatering waters. "Stormwater discharge associated with industrial activity"means the discharge from any conveyance which is used for collecting and conveying stormwater and which is directly related to manufacturing,processing or material storage areas at an industrial activity. "Stormwater Drainage System"means any system that collects and conveys stormwater in a manner resulting in a point source. "Stormwater Quality Manual"means the Department's 2004 Connecticut Stormwater Quality Manual published by the DEP,as may be amended. "Tidal wetland"means a wetland as that term is defined in section 22a-29(2)of the Connecticut General Statutes. "Total Maximum Daily Load" (TMDL) means the maximum capacity of a surface water to assimilate a pollutant as established by the commissioner,including pollutants contributed by point and non-point sources and a margin of safety. • "Vehicle"means a motorized device for transporting persons or things and including without limitation,every type of aircraft,automobile,bus,golf cart,motorcycle,train and truck. "Water Quality Standards or Classifications"means those water quality standards or classifications contained in the Connecticut Water Quality Standards published by the Department, as may be amended. Section 3. Authorization Under This General Permit (a) Eligible Activities The discharge of stormwater associated with industrial activity(as defined in Section 2) to surface water or to a storm sewer system is authorized by this general permit. (b) Requirements for Authorization This general permit authorizes the activity listed in the"Eligible Activities"section(Section 3(a))of this general permit provided: (1) The stormwater is discharged from a point source which is directly related to manufacturing,processing or material storage areas at an industrial activity,including but not limited to Stormwater discharged from ground surfaces immediately adjacent to manufacturing areas;processing or material storage areas; immediate access roads and rail lines used or traveled by carriers of raw materials,manufactured products,waste materials, or by-products used or created by the facility;material handling sites;refuse sites;sites used for the application or disposal of process waste waters(as defined at 40 CFR 401); Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 8 of 69 10/1/11 composting sites; sites used for the storage and maintenance of material handling equipment; sites used for residual treatment,storage,or disposal;shipping and receiving areas;manufacturing buildings; storage areas(including tank farms)for raw materials, and intermediate and finished products; and areas where industrial activity has taken place in the past and materials remain and are exposed to stormwater. (2) Coastal Management Act Such activity must be consistent with all applicable goals and policies in section 22a-92 of the Connecticut General Statutes,and must not cause adverse impacts to coastal resources as defined in section 22a-93(15)of the Connecticut General Statutes. (3) Aquifer Protection Such activity,if it is located within an aquifer protection area as mapped under section 22a-354b of the Connecticut General Statutes,must comply with regulations adopted pursuant to section 22a-354i of the Connecticut General Statutes. (4) Endangered and Threatened Species Such activity must not threaten the continued existence of any species listed pursuant to section 26-306 of the Connecticut General Statutes as endangered or threatened and must not result in the destruction or adverse modification of habitat designated as essential to such species. (5) The stormwater is not discharged to a Publicly Owned Treatment Works(POTW). . (6) The stormwater is not discharged entirely to groundwater,meaning that there will be no surface discharge up to a 100-year,24-hour rainfall event. (7) For discharges subject to stormwater effluent limitation guidelines under 40 CFR, Subchapter N,such effluent limitations are identified in Section 5(f)of this general permit. Discharges not included in that section are not authorized by this general permit. (8) For a stormwater discharge(s)initiated,created or originated after October 1, 1997 discharging within 500 feet of a tidal wetland,which is not a fresh-tidal wetland,the volume of stormwater runoff generated by one inch of rainfall is retained unless the commissioner approves an alternate stormwater management system in accordance with the conditions of Section 5(a)(1)of this general permit. (9) New Discharges to Impaired Waters For industrial activities of sites constructed after the effective date of this general permit, the activity is not authorized to discharge to an impaired water unless the permittee: (A) prevents all exposure of stormwater to the pollutant(s)identified as an indicator of the impairment,and retains documentation of procedures taken to prevent exposure onsite with the Stormwater Pollution Prevention Plan(Plan); or (B) documents that the indicator pollutant(s)is not present at the site,and retains documentation of this finding with the Plan;or ' (C) in advance of submitting a registration,provides to the commissioner data to support a showing that the discharge is not expected to cause or contribute to an exceedance Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 9 of 69 10/1/11 of a water quality standard,and retains such data onsite with the Plan. To do this, the permittee must provide data and other technical information to the commissioner sufficient to demonstrate: (i) For discharges to waters without an established TMDL,that the discharge of the pollutant identified as an indicator of the impairment will meet in-stream water quality criteria at the point of discharge to the waterbody; or (ii) For discharges to waters with an established TMDL,that there are sufficient remaining Waste Load Allocations in the TMDL to allow the discharge and that existing dischargers to the waterbody are subject to compliance schedules designed to bring the waterbody into attainment with water quality standards. To be eligible for authorization under this subsection,the permittee must receive an affirmative determination from the Commissioner that the discharge will not contribute to the existing impairment,in which case the permittee must maintain such determination onsite with the Plan. If the permittee does not receive such affirmative determination pursuant to this subsection,or if an impairment exists for which an indicator or surrogate pollutant has not been designated but for which stormwater discharges are a potential cause, the industrial activity is not authorized by this general permit. (c) Registration Pursuant to the registration requirements(Section 4)of this general permit,a completed registration with respect to the industrial activity shall be filed with the commissioner unless exempted by the"No-Exposure Certification"section(Section 3(d))of this general permit. (d) No Exposure Certification An industrial activity defined under category(10)of the definition of industrial activity in Section 2 may be exempted from the requirements of registration(Section 4),implementation of control measures (Section 5(b)),preparation of a Stormwater Pollution Prevention Plan (Section 5(c)),inspections(Section 5(d)),monitoring(Section 5(e))and record keeping (Section 5(h))only if the facility certifies that there are no materials,as defined in this category, exposed to stormwater. Such certification shall be filed on forms prescribed and provided by the commissioner and submitted with a$250 processing fee.All previously filed No Exposure Certification forms must be renewed upon issuance of this general permit. If,at any time,the industrial activity is modified such that materials are exposed to stormwater,the facility must submit a registration and comply with all pertinent sections of this general permit. (e) Geographic Area This general permit applies throughout the State of Connecticut. (� Effective Date and Expiration Date of this General Permit This general permit is effective on October 1,2011 and expires on September 30,2016. (g) Effective Date of Authorization An activity is authorized by this general permit as follows: Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 10 of 69 10/1/11 • For all facilities that do not make an electronic Pollution Prevention Plan available pursuant to Section 4(c)(2)(H),ninety(90)days after the submission of the registration form required by Section 4(c)or on the date of the Commissioner's affirmative determination pursuant to the conditions of Section 3(b)(9)) or on the date of the Commissioner's approval pursuant to the conditions of Section 4(c)(3),whichever is later,or • For all facilities that do make a Pollution Prevention Plan available pursuant to Section 4(c)(2)(H),sixty(60)days after the submission of the registration form required by Section 4(c)or on the date of the Commissioner's affirmative determination pursuant to the conditions of Section 3(b)(9))or on the date of the Commissioner's approval pursuant to the conditions of Section 4(c)(3),whichever is later. (h) Revocation of an Individual Permit If an activity is eligible for authorization under this general permit and such activity is presently authorized by an individual permit,the existing individual permit may be revoked by the commissioner upon a written request by the permittee.If the commissioner revokes such individual permit in writing,such revocation shall take effect on the effective date of authorization of such activity under this general permit. (i) Issuance of an Individual Permit If the commissioner issues an individual permit under section 22a-430 of the Connecticut General Statutes permitting an activity authorized by this general permit,authorization under this general permit shall cease beginning on the date such individual permit is issued. Section 4. Registration Requirements (a) Who Must File a Registration With the exception noted below, any person or municipality that initiates,creates,originates or maintains a discharge authorized by this general permit,and has not filed a No-Exposure Certification form,shall file a registration form which meets the registration requirements of this section of this general permit. Such form shall be submitted along with the applicable fee, pursuant to Section 4(c)(1),either: • for any industrial activity initiated,created,originated or maintained on or before the effective date of this general permit that does not make an electronic Pollution Prevention Plan available pursuant to Section 4(c)(2)(H),on or before ninety(90)days prior to the effective date(as identified in Section 3(f))of this general permit; or • for any industrial activity initiated,created,originated or maintained on or before the effective date of this general permit that does make an electronic Pollution Prevention Plan available pursuant to Section 4(c)(2)(H),on or before sixty(60) days prior to the effective date(as identified in Section 3(f))of this general permit; or • for a discharge from a facility authorized under this general permit whose ownership is transferred to a new owner,on or before 30 days following the date of transfer;or • for any other discharge,on or before 90(ninety)days prior to the date the industrial activity is initiated for those facilities that do not make an electronic Pollution Prevention Plan available pursuant to Section 4(c)(2)(H)and on or before 60(sixty) Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 11 of69 10/1/11 days prior to the date the industrial activity is initiated for those facilities that do make an electronic Pollution Prevention Plan available pursuant to Section 4(c)(2)(H). If the facility or activity for which a registration is submitted under this permit is owned by one person or municipality but is leased or,in some other way,the legal responsibility of another person or municipality(the operator),the operator is responsible for submitting the registration required by this general permit.The registrant is responsible for compliance with all conditions of this general permit. (b) Scope of Registration A registrant shall register on one registration form only those discharges that are generated by such registrant on one site.A registrant may not submit more than one registration per site under this general permit. (c) Contents of Registration (1) Fees (A) The registration fee shall be submitted with a registration form.A registration shall not be deemed complete unless the registration fee has been paid in full. The fee shall be as follows: (i) $500 Registration Fee: • Companies that employ fewer than fifty(50)employees statewide (excluding seasonal employees employed no more than 120 days in a year) or have gross annual sales of less than five(5)million dollars; • Municipal,federal or state operated industrial activities; and • Small-scale composting facilities. (ii) $1,000 Registration Fee: • Companies that employ more than fifty(50)employees statewide (excluding seasonal employees employed no more than 120 days in a year) and have gross annual sales of greater than five(5)million dollars. (Note that under CGS 22a-6,municipalities pay half the stated fee.) (B) The registration fee shall be paid by check or money order payable to the Department of Environmental Protection. (C) The registration fee is non-refundable. (2) Registration Form A registration shall be filed on forms prescribed and provided by the commissioner and shall include,but not be limited to,the following: (A) Legal name,address,and telephone number of the registrant. If the registrant is an entity transacting business in Connecticut,provide the exact name as registered with the Connecticut Secretary of the State. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 12 of 69 10/1/11 (B) Legal name, address,and telephone number of the owner of the property on which the industrial activity takes place or is to take place. (C) Legal name, address, and telephone number of any consultant(s) or engineer(s) retained by the registrant to prepare the registration or to design or construct the subject activity. (D) Location address of the site for which the registration is submitted. (E) Primary and secondary four-digit Standard Industrial Classification(SIC)codes for the industrial activity. (F) A brief description of the stormwater discharge including: (i) Number,type,material,and size of conveyances,outfalls or channelized flows that run off the site(e.g. 15" concrete pipe); (ii) Size of the property and amount of impervious surface in square feet or acres, including parking areas,driveways,roads,walkways,other paved areas and roofs; (iii) The name of the separate storm sewer system or immediate surface water body or wetland to which the stormwater conveyance,outfall and/or runoff discharges, and whether or not the site discharges within 500 feet of a tidal wetland;and (iv) The name of the watershed and nearest waterbody to which the site discharges and its Water Quality Classification. (G) An 8 %2"by 11" copy of the relevant portion or a full-sized original of a United States Geological Survey(USGS)quadrangle map,with a scale of 1:24,000,showing the exact location of the site and the area within a one mile radius of the site. Identify the quadrangle name on such copy. (H) If available,provide an internet address(URL)where the Plan required by Section 5(c)is accessible for public review. If the registrant claims that certain elements of their Plan constitute a trade secret or are otherwise exempt from the disclosure requirements of the state Freedom of Information Act(section 1-210 et seq of the Connecticut General Statutes, also called FOIA)as specified in that Act,they shall follow the procedures provided in the registration form instructions for this general permit regarding information subject to FOIA requirements. The process of complying with the FOIA requirements does not exempt the registrant from the registration and Plan preparation deadlines in Sections 4(a)and 5(c)(3)of this general permit. (I) The signature of the registrant and of the individual or individuals responsible for actually preparing the registration,each of who shall certify in writing as follows: "I have personally examined and am familiar with the information submitted in this • document and all attachments thereto,and I certify that,based on reasonable investigation,including my inquiry of those individuals responsible for obtaining the information,the submitted information is true,accurate and complete to the best of Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 13 of69 10/1/11 my knowledge and belief. I understand that a false statement made in the submitted information may be punishable as a criminal offense,in accordance with section 22a- 6 of the Connecticut General Statutes,pursuant to section 53a-157b of the Connecticut General Statutes,and in accordance with any other applicable statute. I certify that this permit registration is on complete and accurate forms as prescribed by the commissioner without alteration of the text. I also certify under penalty of law that I have read and understand all conditions of the General Permit for the Discharge of Stormwater Associated with Industrial Activity effective on October 1,2011,that all conditions for eligibility for authorization under the general permit are met,all terms and conditions of the general permit are being met for all discharges which have been initiated and are the subject of this registration,and that a system is in place to ensure that all terms and conditions of this general permit will continue to be met for all discharges authorized by this general permit at the site. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowingly making false statements." (3) Plan Submission for Certain Small-scale Composting Facilities For small-scale composting facilities composting horse manure and bedding,the Plan shall be submitted to the commissioner for review and approval along with the completed registration form and fee specified in subsection(1) above. The activity is not authorized by this general permit until the commissioner approves the Plan and registration. All other small composting facilities are not required to submit their Plan with the registration. (d) Availability of Registration and Plan By the fifteenth(15th)day of each month,the Commissioner shall post on the DEP website a list of registration and no-exposure certification forms submitted in the previous month. The registrant may allow electronic access to their Plan by providing on their registration form an internet address(URL)in accordance with Section 4(c)(2)(H). (1) Registration or No-exposure Certification Availability On or before fifteen(15)days from the date of posting by the Commissioner,members of the public may request a copy of a registrant's registration form or the no-exposure certification form for review. In such cases,the Commissioner shall provide a copy of the registration form or no-exposure certification form to the requesting party within seven(7) days of such request. (2) Plan Availability (A) In such cases where the registrant has made their Plan available electronically in accordance with Section 4(c)(2)(H),members of the public may access the Plan directly. On or before forty-five(45)days from the date the registration is posted by the Commissioner,such party may submit written comments on the Registration and/or Plan to the Commissioner. (B) In such cases where the registrant has not made their Plan available electronically in accordance with Section 4(c)(2)(H),on or before fifteen(15)days from the date of posting by the Commissioner,members of the public may submit a written request to Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 14 of 69 10/1/11 the Commissioner to obtain a copy of such Plan. The Commissioner shall inform the registrant of the request and the name of the requesting party. The registrant shall submit a copy of their Plan to the Commissioner within seven(7)days of their receipt of such request. On or before thirty(30)days from the date a member of the public receives a copy of the requested Plan from the Commissioner,they may submit written comments on the Registration and/or Plan to the Commissioner. (3) Confidential Business Information If the registrant claims that certain elements of their Plan constitute a trade secret or are otherwise exempt from the disclosure requirements of the state Freedom of Information Act(section 1-210 et seq of the Connecticut General Statutes,also called FOIA)as specified in that Act,they shall follow the procedures provided in the registration form instructions for this general permit regarding information subject to FOIA requirements. The process of complying with the FOIA requirements does not exempt the registrant from the registration and Plan preparation deadlines in Sections 4(a)and 5(c)(3)of this general permit. (e) Where to File a Registration A registration shall be filed with the commissioner at the following address: CENTRAL PERMIT PROCESSING UNIT DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD, CT 06106-5127 (t) Additional Information The commissioner may require a registrant to submit additional information,which the commissioner reasonably deems necessary to evaluate the consistency of the subject activity with the requirements for authorization under this general permit. (g) Additional Notification For activities authorized under this permit that are discharged through a municipal separate storm sewer system,a copy of the registration shall also be submitted to the owner and operator of that system. (h) Action by Commissioner (1) The commissioner may reject without prejudice a registration if he or she determines that it does not satisfy the registration requirements (Section 4(c))of this general permit.Any registration refiled after such a rejection shall be accompanied by the fee specified in the "Fees"section(Section 4(c)(1))of this general permit. (2) The commissioner may disapprove a registration if he or she finds that the subject activity is inconsistent with the"Requirements for Authorization"section(Section 3)of this general permit,or for any other reason provided by law. (3) Disapproval of a registration under this subsection shall constitute notice to the registrant that the subject activity must be authorized by an individual permit. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 15 of 69 10/1/11 (4) Rejection or disapproval of a registration shall be in writing. Section 5. Conditions of This General Permit The permittee shall at all times continue to meet the requirements for authorization set forth in Section 3 of this general permit. In addition, a permittee shall assure that authorized activities are conducted in accordance with the following conditions: (a) Conditions Applicable to Certain Discharges (1) Any person who or municipality which initiates,creates,or originates a discharge of stormwater associated with industrial activity after October 1, 1997,which discharge is located less than 500 feet from a tidal wetlands which is not a fresh-tidal wetland,shall discharge such stormwater through a system designed to retain the volume of stormwater runoff generated by 1 inch of rainfall on the site. If there are site constraints that would prevent retention of this volume on-site(e.g.,soil contamination,elevated ground-water, potential groundwater drinking supply area,etc.),documentation must be submitted,for the commissioner's review and written approval,which explains the site limitations and offers an alternative retention volume and/or additional stormwater treatment. For sites unable to comply with this section,the commissioner,at the commissioner's sole discretion,may require the submission of an individual permit application in lieu of authorization under this general permit. (2) Any person who or municipality which discharges stormwater below the high tide line into coastal,tidal,or navigable waters for which a permit is required under the Structures and Dredging Act in accordance with section 22a-361(a) of the Connecticut General • Statutes or into tidal wetlands for which a permit is required under the Tidal Wetlands Act in accordance with section 22a-32 of the Connecticut General Statutes,shall obtain such permit(s)from the commissioner. (3) There shall be no distinctly visible floating scum,oil or other matter contained in the stormwater discharge.Excluded from this are naturally occurring substances such as leaves and twigs provided no person has placed such substances in or near the discharge. (4) The stormwater discharge shall not result in pollution due to acute or chronic toxicity to aquatic and marine life, impair the biological integrity of aquatic or marine ecosystems,or result in an unacceptable risk to human health. (5) The stormwater discharge shall not cause or contribute to an exceedance of the applicable Water Quality Standards in the receiving water. (6) Any new stormwater discharge to high quality waters(as defined in the Water Quality Standards)shall be discharged in accordance with the Connecticut Anti-Degradation Implementation Policy in the Water Quality Standards manual. (b) Control Measures Control Measures are required Best Management Practices(BMP)that the permittee must implement to minimize the discharge of pollutants from the permitted facility. The term "minimize"means reduce and/or eliminate to the extent achievable using control measures that are technologically available and economically practicable and achievable in light of best industry practice. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 16 of 69 10/1/11 (1) Good Housekeeping The permittee must maintain a clean,orderly facility(e.g. sweeping at regular intervals, appropriate storage practices,proper garbage and waste management,dust control measures,etc.)in all areas that are exposed to rainfall and are potential sources of pollutants. (2) Vehicle or Equipment Washing The permittee must provide,at a minimum,that no washing or rinsing of equipment, buildings or vehicles shall be allowed at the site which would allow wash or rinse waters to enter any storm drainage system or surface waters of the State without a permit. Such discharges to groundwater are not authorized by this general permit. (3) Floor Drains The permittee must provide that all floor drains have been sealed,authorized by a local authority to discharge to sanitary sewer or allowed by DEP in accordance with the"Non- Stormwater Discharges"section(Section 5(b)(11))of this general permit. (4) Roof Areas The permittee must identify roof areas that may be subject to drippage,dust or particulates from exhausts or vents or other sources of pollution.The permittee must inspect such areas to determine if any potential sources of stormwater pollution are present. If so,the permittee must minimize such sources or potential sources of pollution. • (5) Minimize Exposure The permittee must minimize exposure to stormwater of materials identified in the "Inventory of Exposed Materials"section(Section 5(c)(2)(D)(ii))of this general permit. Facilities in categories 2 and 10 of the definition of industrial activity in Section 2 of this general permit constructed after July 15,2003 shall be constructed to preclude exposure of materials(as defined in the category 10 definition)by means of a permanent roof or cover or provide stormwater treatment, as identified in the Stormwater Quality Manual,for such exposed areas.Where the permittee believes it is not feasible to construct a permanent roof or cover,they shall submit their Plan(and plan review fee specified in Section 5(c)(4)(B)) showing the area(s)in question and reasons in writing for the commissioner's review and written approval. (6) Sediment and Erosion Control The permittee must identify areas that have a potential for soil erosion due to topography, activities,or other factors,and shall implement measures to limit erosion and stabilize such areas.All construction activities on site shall be conducted in accordance with the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control(Guidelines)and the "Future Construction"section(Section 5(c)(2)(I))of this general permit. (7) Management of Runoff The permittee shall investigate the need for stormwater management or treatment practices that shall be used to divert,infiltrate,reuse,or treat stormwater runoff in a manner that minimizes pollutants in stormwater discharges from the site.Any evaluation,construction Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 17 of 69 10/1/11 or modification of the design of a stormwater drainage system requires certification by a professional engineer licensed to practice in the State of Connecticut. The permittee shall implement and maintain stormwater management or treatment measures determined to be reasonable and appropriate to minimize the discharge of pollutants from the site. In implementing infiltration practices,care must be taken to avoid ground water contamination in accordance with Appendix C. Any stormwater infiltration measures implemented by the permittee and located within an aquifer protection area as mapped under section 22a-354b of the Connecticut General Statutes shall be conducted pursuant to sections 8(c)and 9(b)of the Aquifer Protection Regulations(section 22a-354i(1)-(10)of the Regulations of Connecticut State Agencies). The permittee must assure that stormwater run-off generated from the regulated activity is managed in a manner so as to prevent pollution of groundwater,and shall comply with all the requirements of this permit. The permittee shall consider the potential of various sources at the facility to contribute pollutants to stormwater discharges associated with industrial activity when determining reasonable and appropriate measures. Where feasible,the permittee shall divert uncontaminated run-on to avoid areas that may contribute pollutants. Other appropriate stormwater management or treatment measures may include but are not limited to: vegetative swales or buffer strips,reuse of collected stormwater(such as for process water, cooling water or as an irrigation source),treatment technologies (e.g. swirl concentrators, sand filters,etc.),snow management activities,bioretention cells,green roofs,pervious pavement and wet detention/retention basins. The permittee shall ensure that such measures are properly designed, implemented and maintained in accordance with the Stormwater Quality Manual. (8) Preventive Maintenance • The permittee must implement a preventive maintenance program,which shall include but not be limited to: the inspection and maintenance of stormwater management devices (e.g. cleaning stormwater treatment devices,catch basins);the visual inspection and/or testing of on-site equipment and systems to identify conditions that could cause breakdowns or failures resulting in discharges of pollutants to surface waters; and the appropriate maintenance of such equipment and systems. These areas shall be included in the Routine Inspections conducted under Section 5(d)(2)of this general permit. If the permittee maintains an existing preventive maintenance program that addresses the requirements of this control measure,they may use that program to meet this requirement.The existence of such a program and the location of its maintenance records shall be referenced in the Plan. (9) Spill Prevention and Response Procedures The permittee must minimize the potential for leaks and spills. This shall include clearly identifying areas where potential spills can occur and their accompanying drainage points. The permittee must plainly label containers(e.g.,"Used Oil,""Spent Solvents," "Fertilizers and Pesticides,"etc.)that could be susceptible to spillage or leakage in areas that could contribute pollutants to stormwater runoff. The permittee shall identify procedures for containing,reporting and cleaning up spills.These procedures must be provided to the appropriate personnel through Employee Training(subsection 10,below) along with the necessary equipment to implement a cleanup. 40 Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 18 of 69 10/1/11 A) Containment To prevent unauthorized discharges of liquid chemicals or wastewater from commingling with or polluting a facility's stormwater discharges, or otherwise causing pollution to the waters of the state,the permittee shall comply with the following requirements,as applicable: (i) Stationary Storage or Storage Areas For the purposes of Section 5(b)(9)(A)of this general permit only, storage area means an exterior area,which is or has the potential to be exposed to stormwater,that contains one or more tanks or containers utilized for the storage of liquid chemicals or for the collection,storage or treatment of wastewater. Any stationary above-ground tank,container or storage area used: (1) for the storage of liquid chemicals as identified in the"Spills and Leaks"section (Section 5(c)(2)(D)(iv))of this general permit; or(2)for the collection,storage or treatment of wastewater shall,at a minimum,comply with one of the following types of secondary containment requirements: 1) A double-walled above-ground tank or container; or 2) For any storage area,tank or container installed prior to the date of authorization of this general permit,an impermeable secondary containment area which will hold at least 100%of the volume of the largest tank or container or 10%of the total volume of all tanks and containers in the area, whichever is larger,without overflow from such secondary containment area: or 3) For any storage area,tank or container installed after the date of authorization of this general permit, an impermeable secondary containment area which will hold at least 110%of the volume of the largest tank or container or 10%of the total volume of all tanks and containers in the area, whichever is larger,without overflow from such secondary containment area. (ii) Mobile or Portable Storage Any mobile or portable above-ground tank or container used for the collection or storage of wastewater shall comply with the secondary containment requirements of Section 5(b)(9)(A)(i)above,unless the following minimum requirements are met: 1) Such mobile or portable tank or container and related appurtenances(i.e., piping,fittings,valves,gauges,alarms,switches,etc.)are designed, operated and maintained in a manner to prevent releases of wastewater resulting from factors including,but not limited to,physical or chemical damage,tampering or vandalism, freezing and thawing; and 2) In addition to the requirements of Section 5(b)(9)(A)(ii)(1)above,for any mobile or portable tank or container and related appurtenances that are affixed to a trailer,such trailer shall be a registered motor vehicle designed, operated and maintained to be capable of on-road transport of wastewater at all times. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 19 of 69 10/1/11 (iii) Containment exemption for certain stationary above-ground storage tanks, containers,and areas 1) The secondary containment requirements of Section 5(b)(9)(A)(i)above do not apply to stationary above-ground storage and treatment tanks and containers,and storage areas if such tanks,containers,and storage areas are associated with a discharge(s)authorized by a permit issued pursuant to Section 22a430 or 22a430b of the Connecticut General Statutes. (iv) Additional requirements For industrial activities initiated after October 1, 1992,if an impermeable secondary containment area is required by 5(b)(9)(A)(i)or(ii)above,such containment area shall be roofed in a manner which minimizes stormwater entry to the containment area,except for a containment area which stores tanks or containers of 100 gallon capacity or more,in which case a roof is not required. Stormwater that may accumulate in a containment area may be discharged only after the permittee conducts testing to confirm that it contains none of the relevant pollutants stored therein. For petroleum storage containment areas, visual inspection for a sheen fulfills this requirement. If testing is not conducted or if it indicates the presence of a relevant pollutant,this containment water must be treated and/or disposed of according to DEP and federal regulations. B) Dumpsters The permittee must ensure that all dumpsters,trash compactors, and"roll-off' containers used to store waste or recyclable materials are in sound watertight condition and have covers and drain plugs intact, or are in roofed areas that will prevent exposure to rainfall and will not allow dumpster leakage to enter any stormwater drainage system.All covers on dumpsters not under a roof must be closed when dumpsters are not being loaded or unloaded. C) Loading Docks The permittee shall provide that for all industrial activities initiated after July 15, 2003,loading docks (excluding those that allow a vehicle to enter the building)shall be protected with a permanent roof or other structure that protects the loading dock from direct rainfall. Stormwater collection and drainage facilities adjacent to the loading dock shall be designed and maintained in a way that prevents any materials spilled or released at the loading dock from discharging to the storm sewer system. (10) Employee Training The permittee shall ensure that all employees whose activities may affect stormwater quality receive training within ninety(90)days of employment and at least once a year thereafter to make them familiar with the components and goals of these control measures and the Plan. Training shall address topics such as emergency equipment location,spill response management, control measures,inspection requirements,good housekeeping and materials management practices.Training shall be conducted or supervised by a member of the Pollution Prevention Team or other qualified person and a written record shall be maintained . Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 20 of 69 10/1/11 in the Plan,including the date(s),employee name,employee responsibility and training agenda. (11) Non-Stormwater Discharges The Permittee must eliminate non-stormwater discharges except as provided in"Non- Stormwater Discharge Certification"(Section 5(c)(2)(F)) or as authorized by an individual permit issued pursuant to section 22a-430 or a general permit issued pursuant to 22a-430b of the Connecticut General Statutes,including the provisions of this general permit. (12) Solid De-icing Material Storage The permittee must ensure that storage piles of de-icing materials(including pure salt,salt alternatives or either of these mixed with other materials)used for deicing or other commercial or industrial purposes that are in place for more than 180 days shall be enclosed or covered by a rigid or flexible roof or other structural means. Such structure shall not allow for the migration or release of material outside of the structure through its sidewalls.As a temporary measure(not to exceed two years from the effective date of this general permit),a waterproof cover may be used to prevent exposure to precipitation (except for exposure necessary to add or remove materials from the pile)until a structure can be provided.For temporary storage piles of de-icing materials in place for less than 180 days per year, a waterproof cover may be used to prevent exposure to precipitation (except for exposure necessary to add or remove materials from the pile). In areas with a groundwater classification of GA or GAA,an impervious liner shall be utilized under any de-icing material pile to prevent infiltration to groundwater. In addition,no new road salt or de-icing materials storage facilities shall be located within a 100-year floodplain as defined and mapped for each municipality under 44 CFR 59 et seq. or within 250 feet of a well utilized for potable drinking water supply or within a Level A aquifer protection area as defined by mapping pursuant to section 22a-354c of the Connecticut General Statutes. (13) Sector-Based Control Measures Section 5(f)contains additional control measures for certain industrial activities ("sectors"). These are specific control measures that apply only to the industries in a given sector and are to be implemented in addition to the control measures in this section. (c) Stormwater Pollution Prevention Plan (Plan) (1) Development of Plan (A) The permittee shall develop a Stormwater Pollution Prevention Plan("Plan")for each site.The permittee shall perform all actions required by the Plan in accordance with the schedule set forth in"Deadlines for Plan Preparation and Compliance"(Section 5(c)(3)) of this general permit and including implementation of the Control Measures in Section 5(b),inspections in Section 5(d),monitoring in Section 5(e) and any sector-specific requirements in Section 5(f). The Plan shall include records and documentation of compliance with these elements and shall be kept on-site at all times along with a copy of this general permit.The permittee shall maintain compliance with the Plan thereafter. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 21 of69 10/1/11 (B) For any stormwater discharges that were permitted under the General Permit for the Discharge of Stormwater Associated with Industrial Activity issued October 1, 2002 (modified July 15,2003),the permittee must update the existing Plan in accordance with the"Contents of the Plan"(Section 5(c)(2)),"Control Measures"(Section 5(b)), "Additional Requirements for Certain Sectors"(Section 5(1))and"Monitoring" (Section 5(e))sections of this general permit.The Plan shall be recertified by a professional engineer licensed to practice in the State of Connecticut or a Certified Hazardous Materials Manager in accordance with the"Plan Certification'(Section 5(c)(7))and"Non-Stormwater Discharge Certification'(Section 5(c)(2)(F))sections of this general permit at the time of registration for this general permit. The permittee shall maintain compliance with such Plan thereafter. (2) Contents of Plan The Plan shall be representative of current site conditions and shall address,at a minimum, all the elements below. If an element is not applicable to the facility,the Plan shall identify it and provide an explanation as to why the element does not apply. (A) Facility Description Provide a description of the nature of the industrial activities at the facility. (B) General location map Provide a general location map(e.g.,U.S. Geological Survey(USGS)quadrangle map)with enough detail to identify the location of the facility and all receiving waters to which stormwater discharges. (C) Pollution Prevention Team The permittee shall identify a specific individual or individuals for the site who shall serve as members of a Stormwater Pollution Prevention Team("team").The team shall be responsible for implementing the Plan and assisting in the implementation, maintenance, and development of revisions to the Plan as well as maintaining control measures and taking corrective actions where required.At least one team member shall be present at the facility or on call during all operational shifts.The Plan shall clearly identify the responsibilities of each team member.The activities and responsibilities of the team shall address all aspects of the Plan. Each member of the stormwater pollution prevention team must have ready access to either an electronic or paper copy of applicable portions of this permit and the Plan. (D) Potential Pollutant Sources The Plan shall map and describe the potential sources of pollutants that may reasonably be expected to affect stormwater quality at the site or that may result in the discharge of pollutants during dry weather from the site.The Plan shall identify all activities and materials that may be a source of stormwater pollution at the site. Accordingly,the Plan shall include,but not be limited to the following: (i) Site Map A site map(at a defined or approximate scale)shall be developed showing: Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 22 of 69 10/1/11 1) a north arrow and surveyed or approximate property lines including the 40 total site acreage; 2) location of existing buildings and structures; 3) the overall site size and amount of impervious coverage as well as an outline of the drainage area,including the extent of impervious surface,for each stormwater outfall and direction of flow within the drainage area; 4) existing structural control measures installed to reduce pollutants in stormwater runoff; 5) locations of all stormwater conveyances including catchbasins, ditches, pipes,and swales as well as the location of any non-stormwater discharges; 6) the areal extent of any wetlands to which stormwater discharges; 7) the receiving surface water body or bodies to which the site discharges including the identification of any impaired waters and whether or not a TMDL has been established for them; 8) location where major spills or leaks(identified under Section 5(c)(2)(D)(iv)below)have occurred; 9) locations of all stormwater monitoring points including latitude and longitude,where available; 10) locations of discharges to a municipal storm sewer system; 11) locations of discharges to groundwater through an infiltration system; 12) locations where any drainage run-on enters the site; and 13) each location of the following activities and associated types of pollutants where such activities are exposed to precipitation: • fueling stations; • vehicle and equipment maintenance and/or cleaning areas; • loading/unloading areas; • locations used for the treatment,storage or disposal of wastes; • liquid storage tanks; • de-icing material storage areas; • processing areas; • storage areas; • areas with the potential for erosion that may impact surface waters or wetlands or may have off-site impacts; and • any other potential pollutant sources. (ii) Inventory of Exposed Materials A tabular inventory of non-gaseous materials at the site,including a description of potential pollutants associated with those materials that may be exposed to stormwater between the time of three years prior to the date of certification of the Plan and the present for the following areas: Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 23 of 69 10/1/11 1) loading and unloading operations; 2) roof areas; 3) outdoor storage activities; 4) outdoor manufacturing or processing activities; 5) dust or particulate generating processes; and 6) on-site waste disposal practices. (iii) Summary of Potential Pollutant Sources A narrative summary of each area of the site specified in"Inventory of Exposed Materials"(Section 5(c)(2)(D)(ii),above)of this general permit and each associated potential source of pollution. Such summary shall include: 1) method and location of on-site storage or disposal; 2) materials management practices employed to minimize contact of materials with stormwater runoff between the time of three years prior to the effective date of this permit and the present; 3) the location and a description of existing structural and non-structural control measures to reduce pollutants in stormwater runoff; and 4) a description of any treatment the stormwater receives. (iv) Spills and Leaks A list of spills and leaks of five gallons or more of petroleum products,or of toxic or hazardous substances which could affect stormwater, as listed in section 22a4304(Appendix B Tables 11,111 and V, and Appendix D)of the Regulations of Connecticut State Agencies,and 40 CFR 116.4,that occurred at the facility after the date of three years prior to the date of certification of the Plan. (E) Control Measures The permittee must document the location and type of control measures installed and implemented at the site in accordance with"Control Measures" (Section 5(b)).The permittee shall discuss the appropriateness and priorities of control measures in the Plan and how they address identified potential sources of pollutants at the site.The Plan shall include a schedule for implementing such controls measures if not already implemented. In addition,the permittee must implement those additional control measures that may be required in"Additional Control Measures for Certain Sectors" (Section 5(f)). 40 Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 24 of 69 10/1/11 • (F) Non-Stormwater Discharge Certification The Plan shall include the following certification,signed by a professional engineer licensed to practice in the State of Connecticut or a Certified Hazardous Materials Manager: "I certify that in my professional judgment,the stormwater discharge from the site consists only of stormwater,or of stormwater combined with wastewater authorized by an effective permit issued under section 22a430 or section 22a-430b of the Connecticut General Statutes,including the provisions of this general permit, or of stormwater combined with any of the following discharges provided they do not contribute to a violation of water quality standards: • landscape irrigation or lawn watering; • uncontaminated groundwater discharges such as pumped groundwater, foundation drains,water from crawl space pumps and footing drains; • discharges of uncontaminated air conditioner or refrigeration condensate; • water sprayed for dust control or at a truck load wet-down station; • naturally occurring discharges such as rising groundwaters,uncontaminated groundwater infiltration(as defined at 40 CFR 35.2005(20)), springs,and flows from riparian habitats and wetlands. This certification is based on testing and/or evaluation of the stormwater discharge from the site. I further certify that all potential sources of non-stormwater at the site, a description of the results of any test and/or evaluation for the presence of • non-stormwater discharges,the evaluation criteria or testing method used,the date of any testing and/or evaluation,and the on-site drainage points that were directly observed during the test have been described in detail in the Stormwater Pollution Prevention Plan prepared for the site. I further certify that no interior building floor drains exist unless such floor drain connection has been approved and permitted by the commissioner or otherwise authorized by a local authority for discharge as domestic sewage to sanitary sewer.I am aware that there may be significant penalties for false statements in this certification,including the possibility of fine and imprisonment for knowingly making false statements." (G) Additional requirements for stormwater discharges associated with industrial activity through municipal separate storm sewer systems as may be required by the municipality. In addition to the applicable requirements of this general permit,the Plan must show that sites authorized by this permit shall comply with applicable requirements in an MS4 permit for the municipal separate storm sewer system that receives the industrial facility's discharge,provided such discharger has been notified of such conditions. (H) Consistency with Other Plans and Permits The Plan may reference requirements contained in a Spill Prevention Control and Countermeasure(SPCC)plan or a plan prepared or approved under the Resource Conservation and Recovery Act(RCRA) and other plans required by state, federal or • local law. A copy of the pertinent sections of any referenced plan must be kept with the Plan. The Plan shall identify all general and individual permits issued by the DEP for which the facility is authorized. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 25 of 69 10/1/11 (I) Future Construction • Note that any construction activity that disturbs greater than one acre must be conducted in accordance with the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities(as amended). All construction activities,regardless of size,shall comply with the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control during construction and the 2004 Connecticut Stormwater Quality Manual for the design and implementation of post- construction stormwater management measures. In addition,the permittee shall avoid,wherever possible,the use of copper or galvanized roofing or building materials for any new building construction where these materials will be exposed to stormwater. (J) Monitoring Program A description of the monitoring program and sampling data for stormwater discharges at the site,in accordance with the"Monitoring"section(Section 5(e)) of this general permit. Additional monitoring requirements may be required under Sections 5(f)and 5(g). (K) Schedules and Procedures The permittee shall document in the Plan the schedules and procedures for implementation of control measures,monitoring and inspections. These include but are not limited to: sweeping,waste management practices and other good • housekeeping measures;regular inspections,testing,maintenance,and repair of all industrial equipment and systems potentially exposed to stormwater;procedures for preventing and responding to spills and leaks; employee training;routine,semiannual and any other inspections;visual monitoring; and any quarterly,semiannual,effluent limitation and/or impaired waters monitoring. (3) Deadlines for Plan Preparation and Compliance For any stormwater discharges associated with industrial activity initiated after the effective date of this general permit,the Plan shall be prepared at the time of registration. The permittee shall perform all actions required by such Plan upon obtaining permit coverage,and shall maintain compliance with such Plan thereafter. (4) Signature and Plan Review (A) The Plan shall be signed as follows: (i) for a corporation,by a responsible corporate officer or a duly authorized representative thereof,as those terms are defined in section 22a430-3(b)(2)of the Regulations of Connecticut State Agencies; (ii) for a municipality,state,federal,or other public agency,by either a principal executive officer or a ranking elected official,as those terms are defined in section 22a-430-3(b)(2)of the Regulations of Connecticut State Agencies; (iii) for a partnership or a sole proprietorship,by a general partner or the proprietor, • respectively. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 26 of 69 10/1/11 • When a Plan is signed by a duly authorized representative,a statement of authorization shall be included in the Plan.The Plan shall also be certified,in accordance with"Plan Certification"(Section 5(c)(7))of this general permit,by a professional engineer licensed in the State of Connecticut or a Certified Hazardous Materials Manager. The Plan shall be retained on site at the facility that generates the stormwater discharge. (B) The permittee shall make a copy of the Plan available to the following immediately upon request: (i) the commissioner at his/her own request or as the result of a request from a member of the public pursuant to"Availability of Registration and Plan" (Section 4(d)); (ii) in the case of a stormwater discharge associated with industrial activity which discharges through a municipal separate storm sewer system,to the operator of the municipal system; (iii) in the case of a stormwater discharge associated with industrial activity which discharges to a water supply watershed,to the public water supply company. For all sites submitting a Plan to the Commissioner at the Commissioner's sole • request(not a request from the public),a plan review fee of$500 established by section 22a-430-6 of the Regulations of Connecticut State Agencies shall be submitted with the Plan. The plan review fee for municipalities shall be half ($250). (C) The Commissioner may notify the permittee at any time that the Plan does not meet one or more of the requirements of this section.Within 120 days of such notification unless otherwise specified by the commissioner in writing,the permittee shall revise the Plan,perform all actions required by the revised Plan,and shall inform the commissioner in writing that the requested changes have been made and implemented,and such other information as the commissioner requires. (5) Keeping Plan Current The permittee shall amend the Plan whenever; (A) there is a change at the site which has an effect on the potential to cause pollution of the surface waters of the state; (B) the actions required by the Plan fail to ensure or adequately protect against pollution of the surface waters of the state;or (C) the Commissioner requests modification of the Plan; (D) the permittee is notified that they are subject to requirements because the receiving water to which the industrial activity discharges has been designated as impaired under Section 303(d)of the Clean Water Act and as identified in the most recent State of Connecticut Integrated Water Quality Report; Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 27 of 69 10/1/11 (E) the permittee is notified that a TMDL to which the permittee is subject has been • established for the stormwater receiving water; (F) necessary to address any significant sources or potential sources of pollution identified as a result of any inspection or visual monitoring; (G) required as a result of monitoring benchmarks or effluent limitations in"Monitoring" (Section 5(e))or"Additional Requirements for Certain Sectors"(Section 5(l)). The Plan shall be amended and all actions required by the Plan shall be completed within one hundred twenty(120)days(or within another interval as may be specified in this general permit or as may be approved in writing by the Commissioner)of the date the permittee becomes aware or should have become aware that any of the conditions listed above has occurred. If significant changes are made to the site or to the Plan in accordance with paragraphs 5(A)-(G) above,the Plan shall be recertified in accordance with the"Non-Stormwater Discharges"(Section 5(b)(11))and"Plan Certification'(Section 5(c)(7))sections of this general permit,by a professional engineer licensed to practice in the State of Connecticut or a Certified Hazardous Materials Manager.The permittee shall maintain compliance with such Plan thereafter. (6) Failure to Prepare or Amend Plan In no event shall failure to complete or update a Plan in accordance with the • "Development of Plan"(Section 5(c)(1))and"Keeping Plan Current"(Section 5(c)(5)) sections of this general permit relieve a permittee of responsibility to implement actions required to protect the surface waters of the state,complete any actions that would have been required by such Plan,and to comply with all conditions of the permit. (7) Plan Certification The Plan shall contain the following certification,signed by a professional engineer licensed to practice in the State of Connecticut or a Certified Hazardous Materials Manager: "I certify that I have thoroughly and completely reviewed the Stormwater Pollution Prevention Plan prepared for this site. I further certify,based on such review and site visit by myself or my agent,and on my professional judgment,that the Stormwater Pollution Prevention Plan meets the criteria set forth in the General Permit for the Discharge of Stormwater Associated with Industrial Activity effective on October 1,2011. 1 am aware that there are significant penalties for false statements in this certification,including the possibility of fine and imprisonment for knowingly making false statements." (d) Inspections (1) Semi-Annual Inspections The permittee must provide that qualified personnel shall conduct comprehensive site inspections at appropriate intervals specified in the Plan,but in no event less frequently • than twice a year. Such evaluations shall, at a minimum,include: Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 28 of 69 10/1/11 . (A) Visual inspection of material handling areas and other potential sources of pollution identified in the Plan for evidence of,or the potential for,pollutants entering the stormwater drainage system. Structural stormwater management measures, erosion control measures,control measures and other structural pollution prevention measures identified in the Plan shall be observed to ensure that they are implemented and maintained properly.A visual inspection of equipment needed to implement the plan,such as spill response equipment,shall be made. Inspections should be made during rainfall events if possible. (B) Preparation of a report summarizing the scope of the inspection,personnel making the inspection,the date(s)of the inspection,major observations relating to the Plan, actions taken,and updates made to the Plan shall be made and retained as part of the Stormwater Pollution Prevention Plan for at least five years.The report shall be signed by the permittee. (2) Routine Inspections In addition to the Semi-Annual Inspections required above,the permittee shall identify in the Plan qualified personnel to visually inspect designated equipment and specific sensitive areas of the site at least monthly.A written set of tracking or follow-up procedures shall be used to ensure that appropriate actions are taken in response to the inspections.Records of routine inspections shall be maintained in the Plan kept on-site. (e) Monitoring Requirements (1) Outfall Monitoring All permittees must conduct stormwater outfall monitoring under this general permit. There are different monitoring procedures,frequencies and parameters required of certain permittees dependent upon the nature of their industrial activity,the levels of pollutants in their stormwater discharge and the nature of the receiving waters to which they discharge. In addition,the permittee may be required to modify their Plan and control measures based on their monitoring results. For guidance on outfall monitoring,see Appendix B. (A) Standard Monitoring Parameters All permittees are required to monitor for the standard parameters as specified in this subsection. Additional monitoring parameters may be included in"Additional Requirements for Certain Sectors"(Section 5(1))and/or in"Discharges to Impaired Waters"(Section 5(g)). (i) Visual Monitoring Once each quarter for the entire permit term,the permittee must collect a stormwater sample from each outfall(or a representative outfall pursuant to Section 5(e)(2)(B)) and conduct a visual assessment of each of these samples. These samples should be collected in such a manner that the samples are representative of the stormwater discharge. For monitoring purposes, quarters will begin on January 1,April 1,July 1 and October 1. • The visual assessment must be made of a sample in a clean,clear glass, or j plastic container, and examined in a well-lit area. The permittee must visually Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 29 of 69 10/1/11 inspect the sample for the presence of the following water quality • characteristics: • Color; • Odor; • Clarity; • Floating solids; • Settled solids; • Suspended solids; • Foam; • Oil sheen; and • Other obvious indicators of stormwater pollution. If,based on the above indicators, the visual assessment indicates the control measures for the facility are inadequate or are not being properly operated and maintained,the permittee must review and revise the selection,design, installation and implementation of the control measures to ensure that the condition is eliminated and will not be repeated in the future. The permittee shall maintain documentation of these procedures in the Plan. (ii) General Monitoring Requirements For all industrial activities,as defined in Section 2 of this general permit, stormwater monitoring shall be conducted semiannually(or at an alternate frequency as may be specified in"Additional Requirements for Certain Sectors" (Section 5(f)) commencing upon the effective date of this general permit or upon the date of authorization under Section 3(g) of this permit. One monitoring event shall be conducted between October 1 and March 31. The other monitoring event shall be conducted between April 1 and September 30. Monitoring events shall be separated by at least 30 days. Monitoring shall be conducted for the parameters listed below: Chemical Oxygen Demand(mg/1) Total Oil and Grease(mg/1) pH(S.U.) Total Suspended Solids(mg/1) Total Phosphorus(mg/1) Total Kjeldahl Nitrogen(mg/1) Nitrate as Nitrogen(mg/1) Total Copper(mg/1) Total Lead(mg/1) Total Zinc(mg/1) Annual monitoring shall also be conducted for Aquatic Toxicity pursuant to subsection(C)below. (iii) In addition to the list of parameters in Section 5(e)(1)(A)of this general permit, uncontaminated rainfall pH shall be measured for the same rain event during which the runoff sample is taken. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 30 of 69 10/1/11 (B) Standard Monitoring Benchmarks All permittees are required to comply with the benchmarks for the standard parameters as specified in this subsection unless otherwise specified in"Additional Requirements for Certain Sectors"(Section 5(f)). Additional monitoring benchmarks may also be included in Section 5(f). (i) Schedule Benchmark monitoring must be conducted semiannually,as specified in Section 5(e)(1)(A)upon the effective date of this general permit or upon the date of authorization under Section 3(g)of this permit.Benchmark monitoring may be conducted in conjunction with the quarterly"Visual Monitoring"in Section 5(e)(1)(A)(i),above. Also,see"Toxicity Monitoring"in subsection C below. (ii) Benchmarks These benchmarks apply to all permittees. Additional benchmarks may apply to industries in specific sectors as identified in Section 5(f). Chemical Oxygen Demand(mg/1) 75 Total Oil and Grease(mg/1) 5 Sample pH 5-9 Total Suspended Solids(mg/1) 90 Total Phosphorus(mg/1) 0.40 Total Kjeldahl Nitrogen(mg/1) 2.30 Nitrate as Nitrogen(mg/1) 1.10 Total Copper(mg/1) 0.059 Total Lead(mg/1) 0.076 Total Zinc(mg/1) 0.160 The benchmarks for the parameters above(except metals) are based upon 80th percentiles of the cumulative relative frequency graphs developed from stormwater results reported under the General Permit for the Discharge of Stormwater Associated with Industrial Activity for the sampling years 2003 to 2007.Note that the benchmarks for copper,lead and zinc are based upon state Water Quality Standards and have been determined to be protective of water quality at typical dilution rates. However,regardless of the benchmarks, discharge monitoring data or other site specific information may demonstrate that a discharge is not protective of water quality. In such a case,the department may require additional measures to reduce the discharge of pollutants for any discharge specifically found to be causing or contributing to an exceedance of Water Quality Standards in the receiving water. Provided the permittee complies with all requirements of this Standard Monitoring Benchmarks subsection,exceedance of the benchmarks is not,in itself, a violation of this general permit. (iii) Data not exceeding benchmarks After collection of 4 semiannual samples,if the average of the 4 monitoring values for any parameter does not exceed the benchmark,the monitoring requirements for that parameter have been fulfilled for the permit term. For averaging purposes for any individual sample parameter analyzed using Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 31 of69 10/1/11 procedures consistent with"Test Procedures"(Section 5(e)(2)(D)),which is determined to be less than the method detection limit,use a value of half the method detection limit reported by the analyzing laboratory.For sample values that fall between the method detection level and the reporting level (i.e.,a confirmed detection but below the level that can be reliably quantified),use a value of half the reporting level reported by the analyzing laboratory. Once the benchmark for sample pH has been met and monitoring for pH has been fulfilled,the measurement of rainfall pH is no longer required. (iv) Data exceeding benchmarks Within 120 days of receiving the results of the fourth semiannual sample,if the average of the 4 semiannual monitoring values for any parameter exceeds the benchmark,the permittee must,in accordance with the"Keeping Plan Current" (Section 5(c)(5))section,review the selection,design,installation and implementation of the control measures to determine if modifications are necessary to meet the benchmarks in this permit,and either: • Make the necessary modifications to the control measures and Plan and continue semiannual monitoring until the permittee has completed 4 consecutive semiannual monitoring events for which the average does not exceed the benchmark; or • Make a determination that no further pollutant reductions are technologically available and economically practicable and achievable in light of best industry practice to implement additional control measures or meet the benchmarks,in which case the permittee must continue monitoring once per year. The permittee must also document the rationale for concluding that no further pollutant reductions are achievable and submit this documentation to the commissioner for written approval. The permittee must retain all records related to this documentation with the Plan. If an exceedance of the 4 event average is mathematically certain,the permittee must review the control measures and perform any required corrective action immediately(or document why no corrective action is required),without waiting for the full 4 monitoring events, in accordance with the"Keeping Plan Current"(Section 5(c)(5))section. If after modifying the control measures and conducting additional semiannual monitoring,the average of the most recent 4 monitoring events still exceeds the benchmark(or if an exceedance of the benchmark by the 4 event average is mathematically certain for the most recent 4 monitoring events),the permittee must again review the control measures and take one of the two actions above. (v) Off-site and natural background pollutant levels Following the first 4 semiannual samples of benchmark monitoring(or sooner if the exceedance is triggered by less than 4 monitoring events),if the average concentration of a pollutant exceeds a benchmark value,and the permittee determines that exceedance of the benchmark is attributable solely to the presence of that pollutant in the natural background or in"run-on"entering from off-site,the permittee is not required to perform corrective action or additional benchmark monitoring provided all of the following conditions are met: Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 32 of 69 10/1/11 0 The average concentration of the benchmark monitoring results is less than or equal to the concentration of that pollutant in the natural background or off-site run-on; • The permittee documents and maintains with the Plan the supporting rationale for concluding that benchmark exceedances are in fact attributable solely to natural background or off-site pollutant levels. The permittee must include in the supporting rationale any data previously collected by them or others that describe the levels of natural background pollutants in the stormwater discharge; • The permittee demonstrates that the diversion of off-site run-on containing these pollutant levels is not feasible or practicable; • The permittee notifies the commissioner on the final semiannual benchmark monitoring report that the benchmark exceedances are attributable solely to natural background or off-site pollutant levels;and • The commissioner issues a written approval of the permittee's documentation demonstrating that the benchmark exceedances are attributable solely to natural background or off-site pollutant levels. Natural background pollutants include those substances that are naturally occurring in rainfall,soils or groundwater.Natural background pollutants do not • include legacy pollutants from earlier activity on the site. (C) Toxicity Monitoring The permittee shall monitor annually for aquatic toxicity during the first two years following the date of authorization under Section 3(g)of this permit. This parameter shall be included in a regularly scheduled semiannual sample. (D) Monitoring of Discharges to Impaired Waters Industrial activities that discharge to impaired waters,as identified in Section 5(g) below,must conduct additional monitoring of discharges in addition to the requirements of subsections(A)through(C)above. (i) Discharges to Impaired Waters Without an Established Total Maximum Daily Load(TMDL) If an industrial activity discharges to an impaired water without a TMDL,the permittee must monitor annually for any indicator pollutants identified as contributing to the impairment and for which a standard analytical method exists. No monitoring is required when a waterbody's biological communities are impaired but no pollutant,including indicator or surrogate pollutants,is identified as an indicator of the impairment, or when a waterbody's impairment is related to hydrologic modifications,impaired hydrology,or temperature. This monitoring requirement does not apply after the first year of monitoring if the indicator pollutant is not detected above natural background levels,as determined by the Commissioner,in the stormwater discharge or is the result of Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 33 of 69 t 0/l/11 run-on entering from offsite and the permittee has documented that diversion of this off-site run-on is not feasible or practicable in accordance with"Off-site and natural background pollutant levels" (Section 5(e)(1)(B)(v)). In either case, the permittee must provide such documentation to the Commissioner. (ii) Discharges to Impaired Waters With an Established Total Maximum Daily Load (TMDL) For stormwater discharges to waters for which there is an established TMDL, the permittee is not required to monitor for any indicator pollutant identified in the TMDL unless informed in writing by the DEP,upon examination of the applicable TMDL and/or Waste Load Allocation(WLA),that the permittee is subject to such a requirement consistent with the assumptions of the applicable TMDL and/or WLA. DEP's notice will include specifications on which indicator pollutant to monitor and the required monitoring frequency during the first year of permit coverage. Following the first year of monitoring: • If the indicator pollutant is not detected in any of the first year samples,the permittee may discontinue further sampling,unless the TMDL has specific instructions to the contrary,in which case the permittee must follow those instructions. The permittee must keep records of this finding offite with the Plan. • If the permittee detects the presence of the indicator pollutant in the stormwater discharge for any of the samples collected in the first year,the permittee must continue monitoring annually throughout the term of this permit,unless the TMDL specifies more frequent monitoring,in which case the TMDL requirements must be followed. (E) Sector-Specific Benchmarks For those permittees conducting sector-specific additional monitoring on a quarterly or semiannual basis in accordance with a sector in"Additional Requirements for Certain Sectors"(Section 5(f)),the provisions for meeting or exceeding any sector- specific benchmarks shall follow the requirements of"Data not exceeding benchmarks"and"Data exceeding benchmarks"(Sections 5(e)(1)(B)(iii)and(iv), respectively),applying to the most recent 4 monitoring events,whether quarterly or semiannually. (F) Effluent Limitations Monitoring Certain industrial facilities are required to comply with numeric effluent limits determined by EPA as specified in"Additional Requirements for Certain Sectors" (Section 5(f)). Exceedance of any effluent limit is a violation of the general permit. Where a benchmark and an effluent limit both apply to a given parameter,the requirements to address the effluent limit exceedance supersede those of the benchmark exceedance. If the permittee exceeds an effluent limit,they must comply with the following measures: (i) Exceedance of an Effluent Limit If a stormwater discharge exceeds an effluent limit to which a facility is subject, the permittee must review the selection,design,installation and implementation Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 34 of 69 10/1/11 of the control measures and make the modifications to the control measures and Plan necessary to meet the effluent limit. The permittee must then conduct follow-up monitoring during the next qualifying rain event for any parameter which exceeded an effluent limit. (ii) Exceedance Report In addition to any reporting required after an initial effluent limit exceedance as required by Section 22a-430-30)(11)(D)of the Regulations of CT State Agencies,the permittee must submit an Exceedance Report to DEP on or before 30 days from the date the permittee receives the lab results if follow-up monitoring pursuant to subparagraph(i)above exceeds a numeric effluent limit. The report must include the following: • DEP permit number; • Facility name,physical address and location; • Name of receiving water; • Monitoring data from this and the preceding monitoring event(s); • An explanation of the measures taken and to be taken to correct the violation; and • An appropriate contact name and phone number. (2) Stormwater Monitoring Procedures (A) All samples shall be collected from discharges resulting from a storm event that • occurs at least 72 hours after any previous storm event generating a stormwater discharge. Any sample containing snow or ice melt must be identified on the Stormwater Monitoring Report form. For sites that discharge through a detention basin or other stormwater management structure,the sample shall be taken at the discharge from the basin or structure. If no discharge occurs during a monitoring period,a Stormwater Monitoring Report (SMR)form shall still be submitted in accordance with the"Reporting Requirements"section(Section 5(h)(3))of this general permit. In such a case,a notation of"no discharge"shall be made on the SMR form. Grab samples shall be used for all monitoring and shall not be combined. Collection of grab samples shall begin during the first thirty(30)minutes of a storm event discharge(flow at sampling location)and shall be completed as soon as possible. Samples shall be taken at the outfall or nearest feasible location representative of the discharge.The uncontaminated rainfall pH measurement shall also be taken,when required,at this time.All discharge samples at a facility must be taken during the same storm event, if feasible. (B) Representative Discharge When a facility has two or more outfalls that,based on a consideration of features (e.g. grass vs.pavement,slopes,catch basins vs. swales)and activities within the area drained by the outfall,the permittee reasonably believes discharge substantially identical effluents,the permittee may test the effluent of one such outfall and report that the quantitative data is representative of the substantially identical outfalls. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 35 of69 10/1/11 The Plan shall include a narrative of the rationale for designating outfalls as representative discharges,and, for each outfall that the permittee believes is representative,an estimate of the size of the drainage area(in square feet),an estimate of the runoff coefficient of the drainage area and a description of the substantially identical activities contributing to the discharge shall be provided in the Plan. In no case shall one outfall test be substituted for more than five(5) outfalls. (C) Storm Event Information The following information shall be collected for the storm events monitored: (i) The date,discharge temperature,time of the start of the discharge,time of sampling,and magnitude(in inches)of the storm event sampled; (ii) The pH of the uncontaminated rainfall(before it contacts the ground); and (iii) The duration between the storm event sampled and the end of the most recent storm event that produced a discharge. (D) Test Procedures (i) Unless otherwise specified in this permit,all pollutant parameters shall be tested according to methods prescribed in Title 40,Code of Federal Regulations (CFR),Part 136. Laboratory analyses must be consistent with Connecticut Reasonable Confidence Protocols. (ii) Acute toxicity biomonitoring tests shall be conducted according to the procedures specified in Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater and Marine Organisms, 5th edition(EPA 82 1-R-02-012).The following specific conditions apply: • Tests shall employ neonatal(less than 24-hour-old)Daphnia pulex as test organisms; • Tests shall be conducted at 20+/- 1 degrees Centigrade; • Tests shall be forty-eight(48)hours in duration; • Synthetic freshwater prepared as described in EPA 821-R-02-012 and adjusted to a hardness of 50+/-5 mg/1 as CaCO3 shall be used as dilution water in all tests; • The sample shall not be hardness or pH adjusted or altered in any way; • The following test dilution series shall be utilized,expressed as percent stormwater sample: 100%,50%,25%, 12.5%, 6.25%and 0%; • A minimum of twenty test organisms shall be exposed to each stormwater concentration,with each test concentration containing a minimum of four (4)test chambers. Each test chamber shall contain a minimum of five(5) test organisms; • Test organisms shall not be fed during the test period; Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 36 of 69 10/1/11 • Test results shall be reported as the LC50 value determined using the procedure specified in EPA 82 1-R-02-012; • Hardness in the stormwater sample and in the dilution control water shall be reported as mg/L as CaCO3; • Toxicity tests shall be initiated within thirty-six(36)hours of stormwater sample collection; and • Any test in which the survival of test organisms is less than 90%in the combined control test vessels or failure to achieve test conditions as specified,such as maintenance of environmental controls,shall constitute an invalid test and will require stormwater resampling and retesting as soon as practicable. (E) Inability to Collect a Sample If a permittee is unable to collect a sample pursuant to"Visual Monitoring"(Section 5(e)(1)(A)(i)) or"Additional Requirements for Certain Sectors"(Section 5(f))due to the inability to meet the conditions in subsection(A)above,the permittee shall,for visual monitoring,document such inability in their Plan or,for all other monitoring, submit the Stormwater Monitoring Report form in accordance with the"Reporting Requirements"section(Section 5(h)(3))with a notation of"no discharge"and an explanation of the limitations restricting the collection of an appropriate sample. isReasons may include the absence of a 72-hour period of dry weather,the absence of a rain event that produces a stormwater discharge,the absence of a discharge from a detention or retention basin in accordance with subsection(A)above,or safety considerations preventing access to a stormwater discharge location. Timing of a rain event is not an acceptable reason to fail to sample unless it precludes the analysis of a parameter within the acceptable hold time specified by a laboratory. () Additional Requirements for Certain Sectors (1) Sector A—Asphalt Plants This sector applies to those facilities categorized as SIC Codes 2911 and 2951 that manufacture asphalt paving mixtures and other bituminous road materials. The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Monitoring Requirements In addition to the semiannual monitoring required in"Monitoring"(Section 5(e)),the permittee must sample this parameter semiannually under the same conditions as those required in Section 5(e): Semivolatile Hydrocarbons Analysis of this parameter shall be conducted using EPA Method 625. i Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 37 of69 10/1/11 (B) Sector-specific Benchmarks Facilities monitoring under the requirements of this sector shall not be subject to a Benchmark requirement for Semivolatile Hydrocarbons. These facilities must monitor semiannually for this parameter for the entire term of the permit. (C) Effluent Limitations The following effluent limits apply only to asphalt emulsion facilities(within SIC code 2911). These parameters must be monitored once a year for the term of the permit. Monitoring for these parameters may be conducted concurrently with any other monitoring required in this general permit. Exceedance of any effluent limit is a violation of the general permit. Parameter Effluent Limitation Oil&Grease(mg/1) 15 Sample pH 6-9 Total Suspended Solids(mg/1) 23 (2) Sector B—Non-metallic Mines and Quarries(SIC Code 14)and Stone Cutting(SIC Code 3281) This sector applies to those facilities categorized as SIC Major Group 14 that mine sand, gravel,stone,clay and other non-metallic minerals as well as those facilities that cut and shape stone products classified as SIC Code 3281. The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific • activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Requirements for Authorization Mine dewatering discharges are not authorized by this general permit. (B) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: (i) Additional Sediment and Erosion Control The permittee must implement erosion and sediment control measures for any areas with the potential to impact surface waters or wetlands or the potential for off-site impacts by following the Guidelines and the Stormwater Quality . Manual. (ii) Dust Suppression The permittee must ensure that off-site vehicle tracking of sediments and the generation of dust shall be minimized. Dust suppression measures shall be utilized on any activity that causes airborne particles,in accordance with section 22a-174-18(c) of the Regulations of Connecticut State Agencies.The volume of water sprayed to control dust shall be minimized to prevent runoff to the surface waters of the State. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 38 of69 10/1/11 (iii) Run-on Diversion The permittee shall,where feasible,divert uncontaminated stormwater run-on away from potential pollutant sources by means of interceptor or diversion controls (e.g.,dikes, swales,curbs,or berms);pipe slope drains; subsurface drains;conveyance systems(e.g., channels or gutters,open-top box culverts, and waterbars;rolling dips and road sloping;roadway surface water deflector and culverts); or their equivalents. (C) Additional Plan Requirements In addition to the Plan requirements specified in"Stormwater Pollution Prevention Plan"(Section 5(d)),the permittee must include the following additional elements in their Plan: (i) Nature of Industrial Activities The permittee must document in the Plan the mining and associated activities that can potentially affect the stormwater discharges covered by this permit, including a general description of the location of the site relative to major transportation routes and communities. (ii) Site Map The permittee must document in the Plan the locations of the following(as appropriate):mining or milling site boundaries;access and haul roads; outline of the drainage areas of each stormwater outfall within the facility with information on the types of discharges from the drainage areas;location(s) of all permitted discharges covered under an NPDES permit,outdoor equipment storage,fueling,and maintenance areas;materials handling areas; outdoor manufacturing,outdoor storage,and material disposal areas; outdoor chemicals and explosives storage areas; overburden,materials,soils,or waste storage areas; location of all stormwater discharges; location of mine drainage dewatering or other process water; off-site points of discharge for mine dewatering and process water;surface waters; and location(s)of reclaimed areas. (iii) Potential Pollutant Sources For each area of the mine or mill site where stormwater discharges associated with industrial activities occur,the permittee must document in the Plan the types of pollutants(e.g.,heavy metals,sediment)likely to be present. Consider these factors: the mineralogy of the waste rock(e.g.,acid forming); toxicity and quantity of chemicals used,produced,or discharged; the use of blasting materials;the likelihood of contact with stormwater;vegetation of site(if any); and history of significant leaks or spills of toxic or hazardous pollutants.Also include a summary of any existing waste rock or overburden characterization data and test results for potential generation of acid rock drainage. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 39 of 69 10/1/11 (iv) Stormwater Controls The permittee shall document any of the control measures in subsection(B), above,in the Plan pursuant to Section 5(c)(2)(E). If control measures are implemented or planned but are not listed in subsection(B)(e.g.,substituting a less toxic chemical for a more toxic one),the permittee shall include descriptions of them in the Plan. (3) Sector C—Refuse Systems (SIC Code 4953) This sector applies to those facilities categorized as SIC Code 4953 and are included in Category 5 of the definition of Industrial Activity in Section 2 of this general permit. The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific activities occur and where waste and/or leachate are exposed or potentially exposed to rainfall. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Requirements for Authorization The following discharges are not authorized by this permit: landfill leachate; gas collection condensate; drained free liquids; contaminated ground water; laboratory wastewater;and rinse-or wash-water from washing trucks,railcar exteriors, equipment,paved areas or building surfaces. (B) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: (i) Preventive Maintenance Program As part of the preventive maintenance program in Section 5(b)(8),the permittee must maintain all elements of leachate collection and treatment systems to prevent commingling of leachate with stormwater and the integrity and effectiveness of any intermediate or final cover(including repairing the cover as necessary)to minimize the effects of settlement, sinking,and erosion. For transfer stations,the permittee must maintain the integrity and effectiveness of all collection containers,collection systems for white goods and other waste material storage areas,and systems to contain pollutants and minimize exposure to rainfall and runoff. (ii) Erosion and Sedimentation Control The permittee must provide temporary stabilization(e.g.,temporary seeding, mulching,and placing geotextiles on the inactive portions of stockpiles)for the following:materials stockpiled for daily,intermediate,and final landfill cover; inactive areas of a landfill or open dump; landfills or open dump areas that have received final cover but where vegetation has yet to establish itself; and land application sites where waste application has been completed but final vegetation has not yet been established. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 40 of 69 (C) Additional Plan Requirements In addition to the Plan requirements specified in"Stormwater Pollution Prevention Plan"(Section 5(d)),the permittee must include the following additional elements in their Plan: (i) Drainage Area Site Map The permittee must document in the Plan where any of the following may be exposed to precipitation or surface runoff. active and closed landfill cells or trenches; active and closed land application areas;locations where open dumping is occurring or has occurred;locations of any known leachate springs or other areas where uncontrolled leachate may commingle with runoff; leachate collection and handling systems; and transfer station waste storage areas, hoppers,and waste loading or transfer areas. (ii) Summary of Potential Pollutant Sources The permittee must document in the Plan the following sources and activities,as well as any others,that have the potential to contribute pollutants to stormwater runoff. fertilizer,herbicide,and pesticide application;earth and soil moving; waste hauling and loading or unloading; outdoor storage of materials,including daily,interim, and final cover material stockpiles as well as temporary waste storage areas;exposure of active and inactive landfill and land application areas; uncontrolled leachate flows; and failure or leaks from leachate collection and treatment systems. • (D) Additional Inspection Requirements In addition to the requirements of"Inspections"(Section 5(d)),the permittee shall comply with these additional inspection requirements: (i) Inspections of Active Landfills The permittee must inspect operating landfills, open dumps,and land application sites at least once every 7 days. A qualified inspector shall focus on areas of landfills that have not yet been finally stabilized; active land application areas, areas used for storage of material and wastes that are exposed to precipitation,stabilization,and structural control measures; leachate collection and treatment systems; and locations where equipment and waste trucks enter and exit the site.Ensure that sediment and erosion control measures are operating properly.For stabilized sites and areas where land application has been completed and vegetation established,conduct inspections at least once every month. (ii) Inspections of Inactive Landfills The permittee must inspect inactive landfills, open dumps,and land application sites at least quarterly.Qualified personnel must inspect landfill(or open dump) stabilization and structural erosion control measures,leachate collection and treatment systems,and all closed land application areas. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 41 of69 10/1/11 (iii) Inspections of Transfer Stations and Recycling Facilities to The permittee must inspect transfer stations at least once every 7 days. A qualified inspector shall focus on areas of used for storage of material and wastes that are exposed to precipitation,locations where equipment and waste trucks enter and exit the site,and areas where waste and materials are loaded and unloaded. Additionally,the permittee shall conduct a daily site"walk- through"for litter focusing on the site perimeter,cover of waste containers, and areas the public has access for waste disposal or recycling drop-off. (E) Additional Monitoring Requirements In addition to the semiannual monitoring required in"Monitoring"(Section 5(e)),for municipal and regional landfills and all other solid waste disposal areas, the permittee must sample this parameter quarterly under the same conditions as those required in Section 5(e): Total Iron(mg/1) (F) Sector-specific Benchmarks In addition to the Benchmarks specified in"Monitoring"(Section 5(e)),for municipal and regional landfills and all other solid waste disposal areas, the following Benchmark shall apply to the monitoring parameter required in subparagraph E,above, and be subject to the requirements in"Benchmarks"(Section 5(e)(1)(B)(ii)): • Parameter Benchmark Total Iron(mg/1) 1.0 (G) Effluent Limitations For municipal and regional landfills and all other solid waste disposal areas, compliance with the following effluent limits is required for this general permit. These parameters must be monitored once a year for the term of the permit. Monitoring for these parameters may be conducted concurrently with any other monitoring required in this general permit. Exceedance of any effluent limit is a violation of the general permit. Parameter Effluent Limit Biochemical Oxygen Demand(mg/) 140 Total Suspended Solids (mg/1) 88 Ammonia(mg/1) 10 Alpha Terpineol (mg/1) 0.033 Benzoic Acid(mg/1) 0.12 p-Cresol(mg/1) 0.025 Phenol(mg/1) 0.026 Total Zinc(mg/1) 0.200 pH 6-9 Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 42 of69 10/1/11 (H) Additional Reporting and Recordkeeping Requirements In addition to the requirements of"Reporting and Recordkeeping"(Section 5(h)),the permittee must keep records with the Plan of the types of wastes disposed of in each cell or trench of a landfill or open dump.For land application sites,track the types and quantities of wastes applied in specific areas. (4) Sector D—Auto Salvage Yards(SIC Code 5015) This sector applies to those facilities categorized as SIC Code 5015 and are included in Category 6 of the definition of Industrial Activity in Section 2 of this general permit. The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: (i) Spill and Leak Prevention Procedures The permittee must drain vehicles and mechanical equipment intended to be dismantled of all fluids upon arrival at the site(or as soon thereafter as feasible), or employ some other equivalent means to prevent spills and leaks. The • permittee must conduct dismantling activities on a covered impermeable surface and employ impermeable containment measures for any uncovered outdoor storage of oily parts, engine blocks, and above-ground liquid storage. Disposal of stormwater collected within the containment areas shall be conducted in accordance with the"Spill Prevention and Response Procedures"section (Section 5(b)(9)(A))of this general permit. (ii) Employee Training The permittee shall address,if applicable,the following areas(at a minimum)in the employee training program: proper handling(collection,storage,and disposal)of oil, gasoline,diesel fuel,used mineral spirits, anti-freeze,mercury switches,solvents and any other automotive fluids. (iii) Management of Runoff The permittee shall consider the following management practices:berms or drainage ditches on the property line(to help prevent run-on from neighboring properties); installation of detention ponds;and installation of filtering devices and oil and water separators. (B) Additional Plan Requirements In addition to the Plan requirements specified in"Stormwater Pollution Prevention Plan'(Section 5(d)),the permittee must include the following additional elements in their Plan: i Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 43 of69 10/1/11 (i) Drainage Area Site Map is The permittee shall identify locations used for dismantling,storage,and maintenance of used motor vehicle parts.Also identify where any of the following may be exposed to precipitation or surface runoff: dismantling areas, parts(e.g., engine blocks,tires,hub caps,batteries,hoods,mufflers) storage areas,and liquid storage tanks and drums for fuel and other fluids. (ii) Potential Pollutant Sources The permittee must assess the potential for the following to contribute pollutants to stormwater discharges: vehicle storage areas,dismantling areas,parts storage areas(e.g.,engine blocks,tires,hub caps,batteries,hoods,mufflers), areas where vehicle fluids are drained,and fueling stations. (C) Additional Inspection Requirements The permittee must immediately(or as soon thereafter as feasible)inspect vehicles arriving at the site for leaks. Inspect at least quarterly for signs of leakage all equipment containing oily parts,hydraulic fluids,any other types of fluids,or mercury switches. Also,inspect at least quarterly for signs of leakage all vessels and areas where hazardous materials and general automotive fluids are stored,including, but not limited to,mercury switches,brake fluid,transmission fluid,radiator water, and antifreeze. (D) Additional Monitoring Requirements • (i) Quarterly Monitoring In addition to the semiannual monitoring required in"Monitoring"(Section 5(e)),the permittee must sample these parameters quarterly under the same conditions as those required in Section 5(e): Total Iron(mg/1) Total Mercury(mg/1) Total Aluminum(mg/1) (ii) Semiannual Monitoring In addition to the semiannual monitoring required in"Monitoring"(Section 5(e)) and the quarterly sampling in subparagraph(i),above,the permittee must sample these parameters semiannually under the same conditions as those required in Section 5(e): Semivolatile Hydrocarbons Analysis of this parameter shall be conducted using EPA Method 625. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 44 of 69 10/1/11 (E) Sector-specific Benchmarks (i) Quarterly Monitoring In addition to the Benchmarks specified in"Monitoring"(Section 5(e)),the following Benchmarks shall apply to the monitoring parameters required in subparagraph A,above,and be subject to the requirements in"Benchmarks" (Section 5(e)(1)(B)(ii)): Parameter Benchmark Total Iron(mg/1) 1.0 Total Mercury(mg/1) 0.0014 Total Aluminum(mg/1) 0.75 (ii) Semiannual Monitoring Facilities monitoring under the requirements of this sector shall not be subject to a Benchmark requirement for Semivolatile Hydrocarbons. These facilities must monitor semiannually for this parameter for the entire term of the permit. (5) Sector E—Scrap Recycling Facilities(SIC Code 5093) This sector applies to those facilities categorized as SIC Code 5093 and are included in Category 6 of the definition of Industrial Activity in Section 2 of this general permit. The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Requirements for Authorization Non-stormwater discharges from turnings or other containment areas are not authorized by this general permit. Disposal of stormwater collected within the containment areas shall be conducted in accordance with the"Spill Prevention and Response Procedures"section(Section 5(b)(9)(A)) of this general permit. (B) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: (i) Inbound Recyclable and Waste Material Control Program The permittee must minimize the acceptance of materials that could be sources of pollutants by conducting inspections of inbound recyclables and waste materials.The following are some possible control measure options: (a)provide information and education to suppliers of scrap and recyclable waste materials on draining and properly disposing of residual fluids(e.g.,from vehicles and equipment engines,radiators and transmissions,oil filled transformers,and individual containers or drums)and removal of mercury switches from vehicles before delivery to the facility; (b)establish procedures to minimize the potential • of any residual fluids from coming into contact with precipitation or runoff; (c) establish procedures for accepting scrap lead-acid batteries(additional requirements for the handling,storage,and disposal or recycling of batteries are Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 45 of 69 10/1/11 contained in the scrap lead-acid battery program provisions in subparagraph(vi) below; (d)provide training for those personnel engaged in the inspection and acceptance of inbound recyclable materials; and(e)establish procedures to ensure that liquid wastes,including used oil,are stored in materially compatible and non-leaking containers and are disposed of or recycled in accordance with the Resource Conservation and Recovery Act(RCRA). (ii) Outdoor Scrap and Waste Material Stockpiles and Storage The permittee must minimize contact of stormwater runoff with stockpiled materials,processed materials,and nonrecyclable wastes. The following are some possible control measure options: (a)permanent or semi-permanent covers; (b)sediment traps,vegetated swales and strips,catch basin filters,and sand filters to facilitate settling or filtering of pollutants; (c)dikes,berms, containment trenches,culverts,and surface grading to divert runoff from storage areas; (d)silt fencing to prevent sediment transport; (e)any treatment or other measures necessary to minimize the discharge of water-soluble pollutants such as coolants or oils;and(f)oil and water separators,sumps,and dry absorbents for areas where potential sources of residual fluids are stockpiled(e.g., automobile engine storage areas). (iii) Outdoor Stockpiling of Turnings Exposed to Cutting Fluids The permittee must minimize contact of surface runoff with residual cutting fluids by: (a) storing all turnings exposed to cutting fluids under some form of permanent or semi-permanent cover,and/or(b) establishing dedicated containment areas for all turnings that have been exposed to cutting fluids.Any containment areas must be constructed of concrete, asphalt, or other equivalent types of impermeable material and include a barrier(e.g.,berms, curbing, elevated pads)to prevent contact with stormwater run-on. Stormwater runoff from these areas can be discharged,provided that the cutting fluids are not water soluble and that any runoff is first collected and treated by an oil and water separator or its equivalent. The permittee must regularly maintain the oil and water separator(or its equivalent)and properly dispose of or recycle collected residual fluids. Stormwater containing water soluble cutting fluids may not be discharged and must be collected and disposed of appropriately. (iv) Covered Scrap and Waste Material Stockpiles and Storage The permittee must minimize contact of residual liquids and particulate matter from materials stored indoors or under cover with surface runoff. The permittee shall implement the following control measures: (a)good housekeeping measures,including the use of dry absorbents or wet vacuuming to contain, dispose of,or recycle residual liquids originating from recyclable containers,or mercury spill kits for spills from storage of mercury switches; (b)not allowing washwater from tipping floors or other processing areas to discharge to the storm sewer system; and(c)disconnecting or sealing off all floor drains connected to the storm sewer system. (v) Scrap and Recyclable Waste Processing Areas The permittee must minimize surface runoff from coming in contact with scrap processing equipment. Particular attention shall be paid to operations that Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 46 of 69 10/1/11 generate visible amounts of particulate residue(e.g.,shredding)to minimize the contact of accumulated particulate matter and residual fluids with runoff(i.e., through good housekeeping,preventive maintenance,etc.). Following are some required control measures: (a)regularly inspect equipment for spills or leaks and malfunctioning,worn, or corroded parts or equipment; (b)establish a preventive maintenance program for processing equipment; (c)use dry absorbents or other cleanup practices to collect and dispose of or recycle spilled or leaking fluids or use mercury spill kits for spills from storage of mercury switches; (d) on unattended hydraulic fluid reservoirs over 150 gallons in capacity,install protection devices such as low-level alarms or equivalent devices, and provide secondary containment in compliance with Section 5(b)(9)(A); (e)containment or diversion structures such as dikes,berms, culverts,trenches,elevated concrete pads,and grading to minimize contact of stormwater runoff with outdoor processing equipment or stored materials;(f)oil and water separators or sumps; (g)permanent or semi-permanent covers in processing areas where there are residual fluids and grease;(h)retention or detention ponds or basins; sediment traps,and vegetated swales or strips(for pollutant settling and filtration); (i)catch basin filters or sand filters. (vi) Scrap Lead-Acid Battery Program The permittee must properly handle,store, and dispose of scrap lead-acid batteries.The permittee shall implement the following control measures (a) segregate scrap lead-acid batteries from other scrap materials; (b)properly handle, store, and dispose of cracked or broken batteries; (c)collect and dispose of leaking lead-acid battery fluid; (d)minimize or eliminate(if possible) • exposure of scrap lead-acid batteries to precipitation or runoff; and(e)provide employee training for the management of scrap batteries. (vii) Spill Prevention and Response Procedures The permittee shall install alarms and/or pump shutoff systems on outdoor equipment with hydraulic fluid reservoirs exceeding 150 gallons in the event of a line break. Compliance with the containment provisions in Section 5(b)(9)(A) shall also be maintained. Use a mercury spill kit for any release of mercury from switches,anti-lock brake systems, and switch storage areas. (viii)Supplier Notification Program As appropriate,the permittee shall notify major suppliers which scrap materials will not be accepted at the facility or will be accepted only under certain conditions. Any such restrictions shall be identified in the Plan. (C) Additional Plan Requirements In addition to the Plan requirements specified in"Stormwater Pollution Prevention Plan'(Section 5(d)),the permittee must include the following additional elements in their Plan: (i) Drainage Area Site Map . The permittee shall document in the Plan the locations of any of the following activities or sources that may be exposed to precipitation or surface runoff: Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 47 of69 10/1/11 scrap and waste material storage, outdoor scrap and waste processing areas or equipment; and containment areas for turnings exposed to cutting fluids. (ii) Maintenance Schedules/Procedures for Collection,Handling,and Disposal or Recycling of Residual Fluids at Scrap and Waste Recycling Facilities If the permittee has outdoor stockpiles with cutting fluids subject to Section 5(f)(5)(B)(iii) above,the Plan must identify any applicable maintenance schedule and the procedures to collect,handle,and dispose of or recycle residual fluids. (D) Additional Monitoring Requirements (i) Quarterly Monitoring In addition to the semiannual monitoring required in"Monitoring" (Section 5(e)),the permittee must sample these parameters quarterly under the same conditions as those required in Section 5(e): Total Iron(mg/1) Total Mercury(mg/1) Total Aluminum(mg/1) (ii) Semiannual Monitoring In addition to the semiannual monitoring required in"Monitoring"(Section • 5(e))and the quarterly sampling in subparagraph(i),above,the permittee must sample these parameters semiannually under the same conditions as those required in Section 5(e): Semivolatile Hydrocarbons Polychlorinated Biphenyls(PCBs) Analysis of semivolatile hydrocarbons shall be conducted using EPA Method 625. (E) Sector-specific Benchmarks (i) Quarterly Monitoring In addition to the Benchmarks specified in"Monitoring"(Section 5(e)),the following Benchmarks shall apply to the monitoring parameters required in subparagraph A,above, and be subject to the requirements in"Benchmarks" (Section 5(e)(1)(B)(ii)): Parameter Benchmark Total Iron(mg/1) 1.0 Total Mercury(mg/1) 0.0014 Total Aluminum(mg/1) 0.75 Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 48 of69 10/1/11 (ii) Semiannual Monitoring Facilities monitoring under the requirements of this sector shall not be subject to Benchmark requirements for Semivolatile Hydrocarbons or PCBs. These facilities must monitor semiannually for these parameters for the entire term of the permit. (6) Sector F—Steam Electric Power Generation(SIC Code 4911) This sector applies to those facilities that are categorized as SIC Code 4911 and are included in Category 7 of the definition of Industrial Activity in Section 2 of this general permit. The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: (i) Fugitive Dust Emissions The permittee shall minimize fugitive dust emissions from coal handling and storage areas.To minimize the tracking of coal dust offsite,the following are possible control measures: installing specially designed tires or washing vehicles in a designated area before they leave the site and controlling the wash • water;locating coal handling areas,whether accessed by rail or road access, within a building or under a roof and provide measures to minimize tracking from these areas;maintaining a removable or permanent cover over coal storage areas. (ii) Water-based Coal Unloading Areas The permittee shall minimize contamination of precipitation or surface runoff in vessel,pier and shoreside coal unloading areas as well as spillage and airborne dust from coal transfer operations resulting in direct discharge to adjacent watercourses.The following are possible control measures:using containment curbs in these areas;having personnel familiar with spill prevention and response procedures present during deliveries to ensure that any spillage is immediately contained and cleaned up; and using spill and overflow protection devices(e.g., conveyor pans and covers). (iii) Land-based Fuel Oil Unloading Areas The permittee shall minimize contamination of precipitation or surface runoff from fuel oil unloading areas.The following are possible control measures: using containment curbs in unloading areas;having personnel familiar with spill prevention and response procedures present during deliveries to ensure that any leaks or spills are immediately contained and cleaned up; and using spill and overflow protection devices(e.g.,drip pans,drip diapers, absorbent pads, or other containment devices placed beneath fuel oil connectors to contain potential spillage during deliveries or from leaks at the connectors). Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 49 of69 10/1/11 (iv) Water-based Fuel Oil Unloading Areas The permittee shall minimize contamination of precipitation or surface runoff from vessel,pier and shoreside fuel oil unloading areas. The following are possible control measures:using containment curbs in unloading areas;having personnel familiar with spill prevention and response procedures present during deliveries to ensure that any leaks or spills are immediately contained and cleaned up; and using spill and overflow protection devices(e.g.,drip pans,drip diapers,absorbent pads,containment booms or other containment devices placed beneath fuel oil connectors to contain potential spillage during transfer. (v) Large Bulk Fuel Storage Tanks The permittee shall minimize contamination of surface runoff from large bulk fuel storage tanks by using containment berms(or their equivalent),where feasible.The permittee must also comply with the containment requirements of Section 5(b)(9)(A)as well as applicable State and Federal laws,including Spill Prevention, Control and Countermeasure(SPCC)Plan requirements. (vi) Oil-Bearing Equipment in Switchyards The permittee shall minimize contamination of surface runoff from oil-bearing equipment in switchyard areas.The following are possible control measures: using level grades and gravel surfaces to retard flows and limit the spread of spills; or collecting runoff in perimeter ditches. (vii) Residue-Hauling Vehicles The permittee must inspect all residue-hauling vehicles for proper covering over the load,adequate gate sealing,and overall integrity of the container body.The permittee must repair vehicles without load covering or adequate gate sealing, or with leaking containers or beds. (viii)Ash Loading or Storage Areas The permittee shall reduce or control the tracking of ash and residue from ash loading or storage areas.The permittee must clear the ash building floor and immediately adjacent roadways of spillage,debris,and excess water before departure of each loaded vehicle. (B) Additional Plan Requirements The permittee shall document in the Plan the locations of any of the following activities or sources that may be exposed to precipitation or surface runoff. storage tanks,scrap yards,and general refuse areas;short-and long-term storage of general materials (including but not limited to supplies, construction materials,paint equipment, oils, fuels,used and unused solvents,cleaning materials,paint,water treatment chemicals,fertilizer,and pesticides); landfills and construction sites; and stock pile areas(e.g.,coal or limestone piles). (C) Additional Inspection Requirements The permittee must inspect the following areas monthly: coal handling areas,loading or unloading areas,switchyards,fueling areas,bulk storage areas,ash handling areas, areas adjacent to disposal ponds and landfills,maintenance areas,liquid storage tanks,and long term and short term material storage areas. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 50 of 69 10/1/11 (D) Additional Monitoring Requirements In addition to the semiannual monitoring required in"Monitoring"(Section 5(e)),the permittee must sample this parameter quarterly under the same conditions as those required in Section 5(e): Total Iron(mg/1) (E) Sector-specific Benchmarks In addition to the Benchmarks specified in"Monitoring"(Section 5(e)),the following Benchmark shall apply to the monitoring parameter required in subparagraph A, above,and be subject to the requirements in"Benchmarks"(Section 5(e)(1)(B)(ii)): Parameter Benchmark Total Iron(mg/1) 1.0 (F) Effluent Limitations The following effluent limits apply only to steam electric power generation facilities with coal vile runoff. These parameters must be monitored once a year for the term of the permit. Monitoring for these parameters may be conducted concurrently with any other monitoring required in this general permit. Exceedance of any effluent limit is a violation of the general permit. Parameter Effluent Limitation pH 6-9 Total Suspended Solids(mg/1) 50 (7) Sector G—Transportation and Public Works Facilities This sector applies to those facilities categorized as SIC Codes 40,41,42,43,44(except 4493) and 45 as well as those facilities described as public works garages,all included in Category 8 of the definition of Industrial Activity in Section 2 of this general permit. The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: (i) Vehicle and Equipment Storage The permittee shall minimize the potential for stormwater exposure to leaky or leak-prone vehicles/equipment awaiting maintenance. The following are possible control measures: use of drip pans under vehicles/equipment; indoor storage of vehicles and equipment;installation of berms or dikes;use of absorbents;roofing or covering storage areas; and cleaning pavement surfaces to remove oil and grease(with proper washwater disposal). Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 51 of69 10/1/11 (ii) Fueling Areas The permittee shall minimize contamination of stormwater runoff from fueling areas.The following are possible control measures: covering the fueling area; using spill/overflow protection and cleanup equipment;minimizing stormwater run-on/runoff to the fueling area;using dry cleanup methods;providing spill kits and catch basin covers nearby; and treating and/or recycling collected stormwater runoff. (iii) Vehicle and Equipment Cleaning The permittee must minimize contamination of stormwater runoff from all areas used for vehicle/equipment cleaning. The permittee must implement the following(or other equivalent measures): performing all cleaning operations indoors,where feasible; covering the cleaning operation,ensuring that all washwater drains to a proper collection system(i.e.,not the stormwater drainage system); treating and/or recycling collected washwater,or discharging to sanitary sewer. (iv) Vehicle and Equipment Maintenance The permittee must minimize contamination of stormwater runoff from all areas used for vehicle/equipment maintenance. The permittee must implement the following(or other equivalent measures):performing maintenance activities indoors,where feasible;using drip pans;keeping an organized inventory of materials used in the shop; draining all parts of fluid prior to disposal; prohibiting wet clean up practices if these practices would result in the discharge of pollutants to stormwater drainage systems;using dry cleanup • methods;treating and/or recycling collected stormwater runoff,minimizing run on/runoff of stormwater to and from maintenance areas. (v) Employee Training The permittee shall train personnel within 90 days of employment and at least once a year in accordance with"Control Measures"(Section 5(b)) and address the following activities,as applicable: used oil and spent solvent management; fueling procedures; general good housekeeping practices;proper painting procedures;and used battery management. (vi) Liquid De-Icing Material Storage The permittee shall provide that containers for liquid de-icing materials constructed or modified after the effective date of this general permit must be constructed with impermeable secondary containment which will hold at least 110%of the volume of the container without overflow from the containment area. For storage containers for liquid de-icing materials installed prior to the effective date of this general permit,the permittee shall identify containment control measures as part of the storm water pollution prevention plan(Plan) on or before one(1)year from the effective date of this permit. Containment control measure options may include but are not limited to:regularly inspect equipment for spills or leaks and malfunctioning,worn or corroded parts of equipment; establish a preventative maintenance program;use dry absorbents or other cleanup practices to collect spills or leaks; install protection devices such as low level alarms or equivalent devices;implement containment or diversion Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 52 of 69 10/1/11 structures to prevent spills or leaks from entering a storm drainage system;use drainage control and other diversionary structures(dikes,impermeable berms, curbing,pits). Additionally,on or before one(1)year from the effective date of this general permit,permittees with liquid de-icing storage containers lacking the containment volume required in this subsection that were installed prior to the effective date of this general permit shall submit to the commissioner a plan and implementation schedule for the installation of secondary containment measures on those containers. Such plan shall provide information on the costs associated with providing secondary containment measures at each site and a site priority list for the installation of these measures. (vii) Aircraft De-Icing Operations Where aircraft de-icing is conducted,the permittee shall determine the seasonal timeframe during which deicing activities typically occur at the facility. Implementation of control measures,facility inspections and monitoring must be conducted with particular emphasis throughout the defined deicing season. If the permittee meets the deicing chemical usage thresholds of 100,000 gallons glycol and/or 100 tons of urea,the permittee must conduct at least one of the required benchmark monitoring events (pursuant to Section 5(e))during the deicing season and include the deicing-related parameters identified in subsection D,below(i.e.,BOD,COD,and ammonia). Where deicing operations occur,the permittee must implement a program to control or manage contaminated runoff to minimize the amount of pollutants discharged.The permittee shall implement these control measure options(or their equivalents),as appropriate: a dedicated deicing facility with a runoff collection/recovery system;using vacuum/collection trucks; storing contaminated stormwater/deicing fluids in tanks and releasing controlled amounts to a publicly owned treatment works; and directing runoff into vegetative swales or other infiltration measures. The permittee must also recover deicing materials when these materials are applied during non- precipitation events (e.g., covering storm sewer inlets,using booms,installing absorptive interceptors in the drains,etc.)to prevent these materials from later becoming a source of stormwater contamination.Used deicing fluid should be recycled whenever possible. (B) Additional Plan Requirements (i) Drainage Area Site Map The permittee must identify in the Plan the following areas of the facility and indicate whether activities occurring there may be exposed to precipitation/surface runoff: • Fueling stations; • vehicle/equipment maintenance or cleaning areas; • storage areas for vehicle/equipment with actual or potential fluid leaks; • loading/unloading areas; • areas where treatment,storage or disposal of wastes occur; • aircraft de-icing areas; • liquid storage tanks (including liquid de-icing and anti-icing materials); Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 53 of69 10/1/11 • processing areas; and • storage areas. (ii) Potential Pollutant Sources The permittee shall assess the potential for the following activities and facility areas to contribute pollutants to stormwater discharges: Onsite waste storage or disposal; dirt/gravel parking areas for vehicles awaiting maintenance; illicit plumbing connections between interior floor drains and the stormwater conveyance system(s); aircraft de-icing material storage and application areas; and fueling areas. Describe these activities in the Plan. (iii) Description of Good Housekeeping Measures The permittee must document in the Plan the good housekeeping measures implemented consistent with"Additional Control Measures"(Section 5(f)(7)(A)),above. (iv) Vehicle and Equipment Washwater Requirements If applicable, the permittee shall attach to or reference in the Plan,a copy of the NPDES permit issued for vehicle washwater or,if an NPDES permit has not been issued, a copy of the pending application. If an industrial user permit is issued under a local pretreatment program,the permittee shall attach a copy to the Plan. In any case,implement all non-stormwater discharge permit conditions or pretreatment conditions in the Plan.If washwater is handled in another manner(e.g.,hauled offsite),describe the disposal method and attach all pertinent documentation/information(e.g., frequency,volume,destination,etc.) in the Plan. (C) Additional Inspection Requirements The permittee shall inspect all the following areas/activities: storage areas for vehicles/equipment awaiting maintenance,fueling areas,indoor and outdoor vehicle/equipment maintenance areas,material storage areas,vehicle/equipment cleaning areas; aircraft de-icing areas; and loading/unloading areas. (D) Additional Monitoring Requirements In addition to the parameters required in"Monitoring"(Section 5(e)),the permittee must sample any additional parameters required in this subsection under the same conditions as those required in Section 5(e),unless otherwise specified in this subsection: (i) Additional Parameters for Aircraft De-Icing (a) Large Airports Air transportation facilities(SIC Code 45)conducting aircraft de-icing utilizing more than 100,000 gallons glycol and/or 100 tons of urea shall monitor their stormwater discharges twice during the deicing season(as defined in Section 5(t)(7)(A)(vii)above)for the following parameters,if in use: Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 54 of 69 10/1/11 BOD(mg/1) Urea(mg/1) Propylene Glycol(mg/1) Ethylene Glycol(mg/1) At least one of the two required sampling events shall be conducted concurrently with one of the semiannual sampling events conducted pursuant to"Monitoring Requirements"(Section 5(e)). For air transportation facilities with stormwater discharges from areas where aircraft deicing operations occur(including departure gates,dedicated aircraft deicing stations and any other areas where aircraft deicing occurs), monitoring shall be performed,where practicable,during or immediately following deicing operations when there is a discharge and samples shall be collected in such a manner that they are representative of stormwater quality resulting from deicing operations. (b) Small Airports Air transportation facilities(SIC Code 45) conducting aircraft de-icing utilizing less than 100,000 gallons glycol and/or 100 tons of urea shall monitor their stormwater discharges for the parameters required by "Monitoring"(Section 5(e)) once per gear during the deicing season(as defined in Section 5(f)(7)(A)(vii)above). Additionally,stormwater discharges must be monitored for the following parameters,if in use,once a year for the first two,years of the permit term,regardless of the amounts used: BOD(mg/1) Urea(mg/1) Propylene Glycol(mg/1) Ethylene Glycol(mg/1) For air transportation facilities with stormwater discharges from areas where aircraft deicing operations occur(including departure gates, dedicated aircraft deicing stations and any other areas where aircraft deicing occurs),monitoring shall be performed,where practicable,during or immediately following deicing operations when there is a discharge and samples shall be collected in such a manner that they are representative of stormwater quality resulting from deicing operations. (ii) Additional Parameters for Federal, State,or Municipal Facilities with Incidental Solid De-Icing Material Storage In addition to the general monitoring requirements specified in Section 5(e)(1)(A)(ii)and subject,as applicable,to the conditions for DOT facilities in subparagraph(iv)below,for facilities in this sector that have solid de-icing material storage on-site in conjunction with other activities,a sample shall be taken of a discharge that is representative of the quality of runoff from the deicing storage activity. Such sample shall also include the following parameters: Chloride(mg/1) Cyanide(mg/1) Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 55 of 69 10/1/11 If the discharge location for this sample is already included in the facility's general monitoring program,these additional parameters may be included in that sample. Such facilities shall continue to monitor these additional parameters for the first two years of the permit term(four samples) and shall conduct visual monitoring pursuant to the requirements of"Visual Monitoring" (Section 5(e)(1)(A)(i))for the entire term of the permit. (iii) Monitoring Requirements for Federal, State,or Municipal Facilities Consisting Solely of Solid De-Icing Material Storage Industrial activities in this sector that consist solely of solid de-icing material storage with no other industrial activities on-site shall not be required to monitor for the parameters or conditions in subsections 5(e)(1)(A) -(C) of the "Monitoring Requirements"section. (iv) Department of Transportation Repair and Maintenance Facilities The Department of Transportation shall sample all of its repair facilities and maintenance facilities(those facilities that conduct repair and/or maintenance on DOT vehicles) for the parameters in"General Monitoring Requirements" (Section 5(e)(1)(A)(ii))and,as applicable,those parameters included in subparagraph(ii)above at least once during the term of this general permit. These facilities are otherwise exempt from the additional semiannual monitoring requirements of that section. Such facilities shall continue to conduct visual monitoring pursuant to the requirements of"Visual Monitoring"(Section 5(e)(1)(A)(i)). (E) Sector-specific Benchmarks In addition to the Benchmarks specified in"Monitoring"(Section 5(e)),the following Benchmarks shall apply to the additional monitoring parameters required in subparagraph D,above, and be subject to the requirements in"Benchmarks"(Section 5(e)(1)(B)(ii)): (i) Additional Benchmarks for Aircraft De-Icing (a) Large Airports Facilities monitoring under the requirements of subparagraph(D)(i)(a) above shall not be subject to Benchmark requirements for BOD,Urea, Propylene Glycol or Ethylene Glycol. These facilities must monitor under the conditions of that subparagraph for these parameters for the entire term of the permit. (b) Small Airports Facilities monitoring under the requirements of subparagraph(D)(i)(b) above shall not be subject to Benchmark requirements for BOD,Urea, Propylene Glycol or Ethylene Glycol. Such facilities must monitor for these parameters under the conditions specified in that subparagraph for the first two years of the permit. For their monitoring under"General Monitoring Requirements"(Section 5(e)(1)(A)(ii)),as modified by Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 56 of 69 10/1/11 subparagraph(D)(i)(b) above,these facilities shall be subject to the • Benchmarks of Section 5(e)(1)(B)(ii)after each annual monitoring event rather than an average of four semiannual events. (ii) Additional Benchmarks for Federal, State,or Municipal Facilities with Incidental Solid De-Icing Material Storage Facilities monitoring under the requirements of subparagraph(D)(ii)above shall not be subject to Benchmark requirements for Chloride or Cyanide. (iii) Additional Benchmarks for Federal, State, or Municipal Facilities Consisting Solely of Solid De-Icing Material Storage Facilities monitoring under the requirements of this sector are not required to sample and shall not be subject to Benchmark requirements. (iv) Department of Transportation Repair and Maintenance Facilities Department of Transportation repair and maintenance facilities shall not be subject to the requirements of the"Standard Monitoring Benchmarks" subsection(Section 5(e)(1)(B))to conduct additional sampling based on Benchmarks. However, for those facilities that exceed one or more benchmarks for their sampling event,the permittee shall review the selection,design, installation and implementation of the control measures to determine if modifications are necessary to meet the benchmark(s) and make the necessary modifications to the control measures and Plan for all such facilities. Such . facilities shall also continue to conduct visual monitoring pursuant to the requirements of"Visual Monitoring"(Section 5(e)(1)(A)(i)). (8) Sector H—Marinas,Yacht Clubs and Boat Dealers(SIC Codes 4493, certain 7997 and 5551) This sector applies to those facilities categorized as SIC Code 4493 and are included in Category 8 of the definition of Industrial Activity in Section 2 of this general permit. This sector also includes yacht clubs(within SIC Code 7997) and boat dealers(SIC Code 5551). The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Requirements for Authorization Non-stormwater discharges from sanitary wastes and pressure wash water originating from vessels are not authorized by this permit. Discharges from non-pressure washing,bilge water,ballast water and cooling water originating from recreational vessels up to eighty(80) feet in length may be discharged as they are considered to be incidental to the normal operation of a recreational vessel. (B) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 57 of 69 10/1/11 (i) Pressure Washing Discharges is pressure washing(or other means of washing)is used to remove marine growth from vessels,the permittee must follow the pressure washing guidance in the Connecticut Clean Marina Guidebook,as amended. The discharge of these washwaters is not authorized by this general permit. The discharge of these waters is deemed under the Clean Water Act to be a process wastewater and must be collected and discharged to sanitary sewer under a separate permit or pumped and hauled by a licensed waste hauler. (ii) Non-Pressure Washing Discharges The conditions in subparagraph(i),above,do not apply to non-pressure washing discharges incidental to the normal operation of a recreational vessel. (iii) Blasting and Paint Spraying If abrasive blasting of vessels or equipment is conducted on-site,the permittee must follow the abrasive blasting guidance in the Connecticut Clean Marina Guidebook,as amended.The permittee shall minimize the potential for spent abrasives,paint chips, and overspray to discharge into receiving waters or the storm sewer systems. The permittee shall contain all blasting and paint spraying activities to minimize the discharge of contaminants either by hanging plastic barriers or tarpaulins during blasting or painting operations to contain debris or by conducted such operations inside with appropriate containment measures. Stormwater conveyances within the drainage area of these operations shall be inspected at the end of each day of blasting and cleaned of deposits of abrasive blasting debris and paint chips if necessary. When feasible,blasting media • should be recycled. (iv) Material Storage The permittee shall store and plainly label all containerized materials (e.g., fuels,paints,solvents, waste oil, antifreeze,batteries)in a protected,secure location away from drains.The permittee shall minimize the contamination of precipitation or surface runoff from the storage areas.The permittee shall specify where materials are stored and provide containment as specified in "Containment"(Section 5(b)(9)(A)). If abrasive blasting is performed,the Plan shall discuss the storage and disposal of spent abrasive materials generated at the facility. (v) Engine Maintenance and Repair The permittee shall implement the following(or their equivalents),as appropriate: performing engine maintenance and repair activities indoors,when feasible;maintaining an organized inventory of materials used in the shop; draining all parts of fluid prior to disposal;prohibiting the practice of hosing down the shop floor;using dry cleanup methods; and treating and/or recycling stormwater runoff collected from the maintenance area. No engine fluids, cleaning solvents,paint, scale,rust,oil and grease,or other contaminants resulting from maintenance or repair activities may be discharged to ground, storm sewer or receiving water. Such materials shall be collected and properly disposed. • Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 58 of 69 10/1/11 (vi) Material Handling The permittee shall minimize the contamination of precipitation or surface runoff from material handling operations and areas(e.g.,fueling,paint and solvent mixing,disposal of process wastewater streams from vessels). The permittee shall consider the following(or their equivalents): covering fueling areas,using spill and overflow protection,mixing paints and solvents in a designated area(preferably indoors or under a shed), and minimizing runoff of stormwater to material handling areas. (vii) Employee Training As part of the employee training program,the permittee shall address,at a minimum,the following activities(as applicable): used oil management,spent solvent management,disposal of spent abrasives, disposal of vessel wastewaters,spill prevention and control,fueling procedures,general good housekeeping practices,painting and blasting procedures,pressure washing procedures,engine maintenance and repair procedures,zinc anode disposal and used battery and management. (C) Additional Plan Requirements (i) Drainage Area Site Map The permittee shall document in the Plan where any of the following may be exposed to precipitation or surface runoff: fueling; engine maintenance and repair; vessel maintenance and repair;pressure washing;painting; sanding; blasting;welding;metal fabrication; loading and unloading areas; locations used for the treatment,storage,or disposal of wastes;liquid storage tanks;liquid storage areas(e.g.,paint,solvents,resins); and material storage areas(e.g., blasting media,aluminum,steel,scrap iron). (ii) Summary of Potential Pollutant Sources The permittee shall document in the Plan the following additional sources and activities that have potential pollutants associated with them: outdoor manufacturing or processing activities(e.g.,welding,metal fabricating)and significant dust or particulate generating processes (e.g., abrasive blasting, sanding,and painting.) (D) Additional Inspection Requirements The permittee shall also inspect the following areas of the site monthly:pressure washing area;blasting,sanding,and painting areas;material storage areas; engine maintenance and repair areas;material handling areas;drydock area; and general yard area. At least quarterly and as necessary,the permittee shall perform inspection of stormwater management devices(e.g.,oil and water separators,sediment traps or chambers,pressure wash collection systems),as well as inspecting and/or testing facility equipment and systems to uncover conditions that could cause breakdowns or failures resulting in discharges of pollutants to surface waters. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 59 of 69 10/1/11 (E) Additional Monitoring Requirements In addition to the semiannual monitoring required in"Monitoring"(Section 5(e)),the permittee must sample these parameters semiannually under the same conditions as those required in Section 5(e): Total Iron(mg/1) Total Aluminum(mg/1) (F) Sector-specific Benchmarks In addition to the Benchmarks specified in"Monitoring Requirements"(Section 5(e)),the following Benchmarks shall apply to the additional monitoring parameters required in subparagraph E,above, and be subject to the requirements in "Benchmarks"(Section 5(e)(1)(B)(ii)): Parameter Benchmark Total Iron(mg/1) 1.0 Total Aluminum(mg/1) 0.75 Facilities monitoring under the requirements of this sector shall not be subject to the Benchmark requirements for Total Copper specified in Sections 5(e)(1)(B)(ii), (iii) and(iv). These facilities must monitor semiannually for Total Copper for the entire term of the permit. (9) Sector I—Ship and Boat Building and Repair(SIC Code 373) This sector applies to those facilities categorized as SIC Industry Group 373 and included in Category 2 of the definition of Industrial Activity in Section 2 of this general permit. The permittee must comply with these sector-specific requirements in those areas of the facility where these sector-specific activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Requirements for Authorization Non-stormwater discharges from sanitary wastes and pressure wash water originating from vessels are not authorized by this permit. Discharges from bilge water,ballast water and cooling water originating from recreational vessels up to eighty(80)feet in length may be discharged as they are considered to be incidental to the normal operation of a recreational vessel.. (B) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: (i) Pressure Washing If pressure washing(or other means of washing)is used to remove marine growth from vessels,the permittee must follow,where practicable,the pressure washing guidance in the Connecticut Clean Marina Guidebook,as amended. Where, for reasons of vessel size,location or configuration,these measures are not practicable,suitable alternative control measures shall be implemented. The discharge of these washwaters is not authorized by this general permit.The Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 60 of 69 10/1/11 • discharge of these waters is deemed under the Clean Water Act to be a process wastewater and must be collected and discharged to sanitary sewer under a separate permit or pumped and hauled by a licensed waste hauler. (ii) Non-Pressure Washing Discharges The conditions in subparagraph(i),above,do not apply to non-pressure washing discharges incidental to the normal operation of a recreational vessel. (iii) Blasting and Paint Spraying If abrasive blasting of vessels or equipment is conducted on-site,the permittee must follow,where practicable,the abrasive blasting guidance in the Connecticut Clean Marina Guidebook,as amended.The permittee shall minimize the potential for spent abrasives,paint chips,and overspray to discharge into receiving waters or the storm sewer systems. The permittee shall contain,where practicable,all blasting and paint spraying activities to minimize the discharge of contaminants either by hanging plastic barriers or tarpaulins during blasting or painting operations to contain debris or by conducted such operations inside with appropriate containment measures. Where, for reasons of vessel size,location or configuration,these measures are not practicable, suitable alternative control measures shall be implemented. Stormwater conveyances within the drainage area of these operations shall be inspected at the end of each day of blasting and cleaned of deposits of abrasive blasting debris and paint chips if necessary. Spent blasting media shall be collected and disposed in an appropriate manner dependent upon its composition. When feasible,blasting media should be recycled. (iv) Material Storage The permittee shall store and plainly label all containerized materials(e.g., fuels,paints,solvents,waste oil, antifreeze,batteries)in a protected,secure location away from drains.The permittee shall minimize the contamination of precipitation or surface runoff from the storage areas.The permittee shall specify where materials are stored, and provide containment as specified in "Containment"(Section 5(b)(9)(A)).If abrasive blasting is performed,the Plan shall discuss the storage and disposal of spent abrasive materials generated at the facility. (v) Engine Maintenance and Repair The permittee shall implement the following(or their equivalents), as appropriate:performing engine maintenance and repair activities indoors,when feasible;maintaining an organized inventory of materials used in the shop; draining all parts of fluid prior to disposal;prohibiting the practice of hosing down the shop floor;using dry cleanup methods;and treating and/or recycling stormwater runoff collected from the maintenance area. No engine fluids, cleaning solvents,paint, scale,rust, oil and grease,or other contaminants resulting from maintenance or repair activities may be discharged to ground, storm sewer or receiving water. Such materials shall be collected and properly disposed. (vi) Material Handling • The permittee shall minimize the contamination of precipitation or surface runoff from material handling operations and areas(e.g.,fueling,paint and Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 61 of69 10/1/11 solvent mixing, disposal of process wastewater streams from vessels).The permittee shall consider the following(or their equivalents): covering fueling areas,using spill and overflow protection,mixing paints and solvents in a designated area(preferably indoors or under a shed),and minimizing runoff of stormwater to material handling areas. (vii) Drydock Activities The permittee must routinely maintain and clean the drydock to minimize pollutants in stormwater runoff. The permittee must clean accessible areas of the drydock prior to flooding. Upon flooding,removal of the vessel and raising the dock,the permittee shall conduct a final cleanup.Procedures shall be documented in the Plan and shall include training materials for cleaning up oil, grease, and fuel spills occurring on the drydock. Debris and spent blasting material should be swept rather than hosed off accessible areas of the drydock prior to flooding. If rinsing or washing is employed for cleanup,this material must be collected disposed of in accordance with DEP regulations and may not be discharged to the receiving water. During active drydock operations, absorbent materials and oil containment booms shall be readily available to clean up or contain any spills. (viii)Employee Training As part of the employee training program,the permittee shall address,at a minimum,the following activities(as applicable):used oil management,spent solvent management,disposal of spent abrasives,disposal of vessel wastewaters,spill prevention and control,fueling procedures,general good housekeeping practices,painting and blasting procedures,pressure washing procedures,engine maintenance and repair procedures,zinc anode disposal and used battery and management. (C) Additional Plan Requirements (i) Drainage Area Site Map The permittee shall document in the Plan where any of the following may be exposed to precipitation or surface runoff. fueling; engine maintenance and repair;vessel maintenance and repair;pressure washing;painting;sanding; blasting; welding;metal fabrication; loading and unloading areas; locations used for the treatment,storage,or disposal of wastes; liquid storage tanks; liquid storage areas(e.g.,paint,solvents,resins);and material storage areas(e.g., blasting media,aluminum, steel, scrap iron). (ii) Summary of Potential Pollutant Sources The permittee shall document in the Plan the following additional sources and activities that have potential pollutants associated with them: outdoor manufacturing or processing activities (e.g.,welding,metal fabricating) and significant dust or particulate generating processes(e.g.,abrasive blasting, sanding,and painting.) (iii) Blasting and Painting Areas • The permittee shall document in the plan any standard operating practices relating to blasting and painting(e.g.,prohibiting uncontained blasting and Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 62 of 69 10/1/11 painting over open water or prohibiting blasting and painting during windy • conditions,which can render containment ineffective). (iv) Storage Areas The permittee shall specify in the Plan which materials are stored indoors which are stored outdoors,and how containment is provided in accordance with Section 5(b)(9)(A). (D) Additional Inspection Requirements The permittee shall also inspect the following areas of the site monthly:pressure washing area;blasting, sanding,and painting areas;material storage areas;engine maintenance and repair areas;material handling areas; drydock area; and general yard area. At least quarterly and as necessary,the permittee shall perform inspection of stormwater management devices(e.g.,oil and water separators, sediment traps or chambers,pressure wash collection systems),as well as inspecting and/or testing facility equipment and systems to uncover conditions that could cause breakdowns or failures resulting in discharges of pollutants to surface waters. (E) Sector-specific Benchmarks Facilities in this sector shall not be subject to the Benchmark requirements for Total Copper specified in Sections 5(e)(1)(B)(ii), (iii)and(iv). These facilities must monitor semiannually for Total Copper for the entire term of the permit. (10) Sector J—Small-Scale Composting Facilities This sector applies to those facilities included in Category 14 of the definition of Industrial Activity in Section 2 of this general permit. The permittee must comply with these sector- specific requirements in those areas of the facility where these sector-specific activities occur. These sector-specific requirements are in addition to any requirements specified elsewhere in this permit. (A) Additional Control Measures In addition to the control measures specified in"Control Measures"(Section 5(b)), the permittee must implement the following additional control measures: (i) Management of Runoff Where composting operations are exposed to rainfall or runoff,the permittee must retain the runoff from the 25-year,24-hour rainfall event. (ii) Plan Submittal For small-scale composting facilities composting horse manure and bedding,the Plan shall be submitted to the commissioner for review and approval with the completed registration in accordance with the"Contents of Registration"section (Section 4(c)). Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 63 of69 10/1/11 (B) Additional Plan Requirements (i) Site Map The permittee shall indicate on the site map areas of the site where loading, unloading,mixing,hauling or placing of composting materials takes place. (ii) Inventory of Exposed Materials The permittee shall include in the Plan,a tabular inventory of the types and nature of materials composted or used in the composting operations that may be exposed to stormwater. (iii) Composting Operations The permittee shall document how the following criteria have been included in the design of the small-scale composting operations: • Quantities of source materials to be composted; • Origin of source materials to be composted; • Target carbon-nitrogen ratio; • Target moisture content; • Mix ratios of source materials; • Method for mixing materials; • Equipment used in all phases of composting; • Turning schedule; • Temperature monitoring; • Composting and curing times; • Odor control; • Area requirements; and • End market for compost product. (C) Alternate Monitoring Requirements Small-scale composting facilities shall not be subject to the General Monitoring Requirements of Section 5(e)(1)(A)(ii)and shall instead conduct annual sampling of the parameters listed below,when and if there is a discharge from the retention system,commencing upon the effective date of this general permit, and annually thereafter as conditions allow. COD(mg/1) Total Phosphorus(mg/1) Total Kjeldahl Nitrogen(mg/1) Nitrate as Nitrogen(mg/1) Total Suspended Solids(mg/1) (D) Sector-specific Benchmarks The following Benchmarks shall apply to the monitoring parameters required in subparagraph C,above,and be subject to the requirements for data exceeding and not exceeding Benchmarks in the`Benchmarks section(Section 5(e)(1)(B)(iii)and , (iv)): Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 64 of 69 10/1/11 Parameter Benchmark 40 COD(mg/1) 75 Total Phosphorus(mg/1) 0.40 Total Kjeldahl Nitrogen(mg/1) 2.30 Nitrate as Nitrogen(mg/1) 1.10 Total Suspended Solids (mg/1) 90 (g) Discharges to Impaired Waters The DEP has established an EPA-approved list of"impaired waters"pursuant to Section 303(d) of the Clean Water Act and as identified in the most recent State of Connecticut Integrated Water Quality Report. These are waters that have been assessed as not meeting Water Quality Standards(WQS)for a given designated use and may identify a pollutant or pollutants(e.g. bacteria,heavy metals,nutrients,etc)as indicators of that impairment. The DEP is required by the EPA to establish a Total Maximum Daily Load(TMDL)for each impaired water to reflect the pollutant load that the water body can assimilate without exceeding the WQS. Industrial activities that discharge to impaired waters are required to meet certain criteria identified in this section. (1) Existing Discharge to an Impaired Water without an Established TMDL If the permittee discharges to an impaired water without an established TMDL,they are required to comply with Section 5(c)(5)and the annual monitoring requirement of Section 5(e)(1)(D). Note that this provision also applies to situations where the DEP determines that the discharge is not controlled as necessary to meet water quality standards in a downstream water segment,even if the discharge is to a receiving water that is not specifically identified as an impaired water on a Section 303(d)list. (2) Existing Discharge to an Impaired Water with an Established TMDL If the permittee discharges to an impaired water with an established TMDL,the DEP will inform them if any additional controls are necessary for the discharge to be consistent with the available Waste Load Allocation in the TMDL,or if coverage under an individual permit is necessary in accordance with"Issuance of an Individual Permit"(Section 3(i)). The permittee must also conduct the appropriate monitoring in accordance with "Monitoring of Discharges to Impaired Waters" (Section 5(e)(1)(D)). (3) New Discharge to an Impaired Water If a new discharge to an impaired water is authorized pursuant to the conditions of Section 3(b)(9),the permittee must implement and maintain any control measures or conditions on the site that enabled such authorization,and modify such measures or conditions as necessary to maintain such authorization. The permittee must also maintain compliance with this subsection and Section 5(e)(1)(D). (h) Reporting&Record Keeping Requirements (1) Recording of Results For each measurement or sample taken pursuant to the requirements of this general permit, • the discharger shall maintain records of the following information: (A) the place,date,and time of sampling and the time the discharge started; Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 65 of 69 10/1/11 (B) the person(s) collecting samples; (C) the dates and times the analyses were initiated; (D) the person(s) or laboratory that performed the analyses; (E) the analytical techniques or methods used; and (F) the results of all analyses. (2) Records Retention All records and information resulting from the monitoring activities required by this general permit including all records of analyses performed and calibration and maintenance of instrumentation shall be retained for a minimum of five(5)years following the date of expiration of this general permit,or longer if requested by the commissioner. (3) Reporting Requirements (A) All results of monitoring conducted pursuant to this general permit shall be submitted on the Stormwater Monitoring Report(SMR) form provided in Appendix B, including all supporting chemical/physical measurements performed in association with the toxicity tests as well as dose-response data.A separate SMR form shall be used for each discharge monitored.All SMR forms shall be submitted within ninety (90)days of the date of sampling to: 0 WATER TOXICS PROGRAM COORDINATOR BUREAU OF WATER PROTECTION AND LAND REUSE DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD,CT 06106-5127 In the case of stormwater discharges through a municipal separate storm sewer system,these results shall also be made available to the operator of that system upon request. (B) Additional Monitoring by Permittee If the permittee monitors any pollutant at the discharge location(s)designated herein more frequently than required by this general permit or monitors for additional parameters not included in the"Monitoring"section(Section 5(e))or"Additional Requirements for Certain Sectors"(Section 5(f))of this general permit,using approved analytical methods as specified above,the results of such monitoring shall meet the reporting requirements of Section 5(h)(3)(A). (i) Regulations of Connecticut State Agencies Incorporated into this General Permit The permittee shall comply with the following Regulations of Connecticut State Agencies which are hereby incorporated into this general permit,as if fully set forth herein: • Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 66 of 69 10/1/11 (1) Section 22a430-3: Subsection(b)General -subparagraph(1)(D) and subdivisions (2),(3),(4)and(5) Subsection(c) Inspection and Entry Subsection(d)Effect of a Permit-subdivisions (1)and(4) Subsection(e)Duty to Comply Subsection(f)Proper Operation and Maintenance Subsection(g) Sludge Disposal Subsection(h)Duty to Mitigate Subsection(i)Facility Modifications,Notification-subdivisions(1)and(4) Subsection 6)Monitoring,Records and Report Requirements -subdivisions (1), (6), (7), (8),(9)and(11)(except subparagraphs(9)(A) (2)and(9)(c) Subsection(k)Bypass Subsection(m)Effluent Limitation Violations Subsection(n)Enforcement Subsection(p) Spill Prevention and Control Subsection(q)Instrumentation,Alarms,Flow Recorders Subsection(r)Equalization (2) Section 22a4304 Subsection(t) Prohibitions Subsection(p)Revocation,Denial,Modification Appendices Section 6. General Conditions (a) Reliance on Registration When evaluating a registration,the commissioner relies on information provided by the registrant.If such information proves to be false or incomplete,the authorization issued under this general permit may be suspended or revoked in accordance with law,and the commissioner may take any other legal action provided by law. (b) Duty to Correct and Report Violations Upon learning of a violation of a condition of this general permit,a permittee shall immediately take all reasonable action to determine the cause of such violation,correct such violation and mitigate its results,prevent further such violation,and report in writing such violation and such corrective action to the commissioner within five(5)days of the permittee's learning of such violation. Such report shall be certified in accordance with Section 6(d)of this general permit. (c) Duty to Provide Information If the commissioner requests any information pertinent to the authorized activity or to determine compliance with this general permit,the permittee shall provide such information in writing within thirty(30)days of such request. Such information shall be certified in accordance with Section 6(d)of this general permit. (d) Certification of Documents Any document,including but not limited to any notice,which is submitted to the commissioner under this general permit shall be signed by,as applicable,the registrant or the permittee in Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 67 of 69 10/1/11 accordance with section 22a-430-3(b)(2)of the Regulations of Connecticut State Agencies,and by the individual or individuals responsible for actually preparing such document,each of whom shall certify in writing as follows: "I have personally examined and am familiar with the information submitted in this document and all attachments thereto,and I certify that,based on reasonable investigation,including my inquiry of those individuals responsible for obtaining the information,the submitted information is true,accurate and complete to the best of my knowledge and belief.I understand that a false statement made in the submitted information may be punishable as a criminal offense,in accordance with section 22a-6 of the General Statutes,pursuant to section 53a-157b of the General Statutes, and in accordance with any other applicable statute." (e) Date of Filing For purposes of this general permit,the date of filing with the commissioner of any document is the date such document is received by the commissioner. The word"day"as used in this general permit means the calendar day; if any date specified in the general permit falls on a Saturday, Sunday,or legal holiday,such deadline shall be the next business day thereafter. 09 False Statements Any false statement in any information submitted pursuant to this general permit may be punishable as a criminal offense,in accordance with section 22a-6 of the General Statutes, pursuant to section 53a-157b of the General Statutes,and in accordance with any other applicable statute. (g) Correction oflnaccuracies Within fifteen(15)days after the date a permittee becomes aware of a change in any of the information submitted pursuant to this general permit,becomes aware that any such information is inaccurate or misleading, or that any relevant information has been omitted,such permittee shall correct the inaccurate or misleading information or supply the omitted information in writing to the commissioner. Such information shall be certified in accordance with Section 6(dl)of this general permit. The provisions of this subsection shall apply both while a request for registration is pending and after the commissioner has approved such request. (h) Transfer ofAuthorization An authorization under this general permit is not transferable. (i) Other Applicable Law Nothing in this general permit shall relieve the permittee of the obligation to comply with any other applicable federal,state and local law,including but not limited to the obligation to obtain any other authorizations required by such law. (j) Other Rights This general permit is subject to and does not derogate any present or future rights or powers of the State of Connecticut and conveys no rights in real or personal property nor any exclusive privileges,and is subject to all public and private rights and to any federal,state,and local laws pertinent to the property or activity affected by such general permit.In conducting any activity authorized hereunder,the permittee may not cause pollution,impairment, or destruction of the Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 68 of69 10/1/11 air,water,or other natural resources of this state.The issuance of this general permit shall not create any presumption that this general permit should or will be renewed. Section 7. Commissioner's Powers (a) Abatement of Violations The commissioner may take any action provided by law to abate a violation of this general permit,including the commencement of proceedings to collect penalties for such violation.The commissioner may,by summary proceedings or otherwise and for any reason provided by law, including violation of this general permit,revoke a permittee's authorization hereunder in accordance with sections 22a-3a-2 through 22a-3a-6,inclusive, of the Regulations of Connecticut State Agencies.Nothing herein shall be construed to affect any remedy available to the commissioner by law. (b) General Permit Revocation,Suspension, or Modification The commissioner may,for any reason provided by law,by summary proceedings or otherwise, revoke or suspend this general permit or modify it to establish any appropriate conditions, schedules of compliance,or other provisions which may be necessary to protect human health or the environment. (c) Filing of an Individual Application If the commissioner notifies a permittee in writing that such permittee must obtain an individual permit to continue lawfully conducting the activity authorized by this general permit,the permittee may continue conducting such activity only if the permittee files an application for an individual permit within sixty(60)days of receiving the commissioner's notice.While such application is pending before the commissioner,the permittee shall comply with the terms and conditions of this general permit.Nothing herein shall affect the commissioner's power to revoke a permittee's authorization under this general permit at any time. Issued: August 23,2010 AMEY W. MARRELLA Commissioner This is a true and accurate copy of the general permit executed on August 23, 2010 by the Commissioner of the Department of Environmental Protection. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 69 of 69 10/1/11 Appendix A: Industrial Stormwater General Permit SIC Code Definitions Definition 2 SIC Except Classification 24 Lumber&Wood Products, Except Furniture 2434 Wood Kitchen Cabinets 26 Paper&Allied Products 265 Paperboard Containers& Boxes 267 Converted Paper&Paperboard Products, Except Containers&Boxes 28 Chemicals&Allied Products 283 Drugs 285 Paints,Varnishes, Lacquers, Enamels, &Allied Products 29 Petroleum Refining&Related Industries 311 Leather Tanning&Finishing 32 Stone, Clay,Glass&Concrete Products 323 Glass Products, Made of Purchased Glass 33 Primary Metal Products 3441 Fabricated Structural Metal 373 Ship&Boat Building &Repairing Definition 5 SIC Except Classification 4953 Refuse Systems(Includes Dumps,Landfills,Rubbish Collection&Disposal) Definition 6 SIC Except `` Classification 5015 Motor Vehicle Parts, Used 5093 Scrap&Waste Materials Definition 7 SIC Except Classification 4911 Electric Services(electric power generation,transmission or distribution) Definition 8 M40 Exce t. Classification Railroad Transportation Local&Suburban Transit& Interurban Highway Passenger Motor Freight Transportation&Warehousing 4221 Farm Product Warehousing &Storage 4222 Refrigerated Warehousing&Storage 4225 General Warehousing&Storage 44 Water Transportation 45 Transportation by Air 5541 Retail Truck Stops 5551 Boat Dealers 7997 Yacht Clubs 9199 Public Works Garages Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 1 of2 10/1/11 Definition 10 SIC Except Classification 20 Food&Kindred Products 21 Tobacco Products 22 Textile Mill Products 23 Apparel&Other Products Made from Fabrics&Similar Materials 2434 Wood Kitchen Cabinets 25 Furniture&Fixtures 265 Paperboard Containers&Boxes 267 Converted Paper&Paperboard Products, Except Containers&Boxes 27 Printing, Publishing&Allied Industries 283 Drugs 285 Paints,Varnishes, Lacquers, Enamels,&Allied Products 30 Rubber& Misc. Plastics Products 31 Leather&Leather Products 311 Leather Tanning &Finishing 323 Glass Products, Made of Purchased Glass 34 Fabricated Metal Products, Except Machinery&Transportation Equipment 3441 Fabricated Structural Metal 35 Industrial&Commercial Machinery&Equipment 36 Electronic&Other Electrical Equipment&Components Except Computer Equipment 37 Transportation Equipment • 373 Ship&Boat Building&Repairing 38 Measuring,Analyzing&Controlling Instruments; Photographic, Medical &Optical Goods;Watches&Clocks 39 Misc. Manufacturing Industries 4221 Farm Product Warehousing &Storage [=4222 Refrigerated Warehousing &Storage 4225 General Warehousing&Storage Definition 11 SIC Except ' Classification 5171 Petroleum Bulk Stations&Terminals ; 0 Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 2 of 2 10/1/11 APPENDIX B—INDUSTRIAL STORMWATER MONITORING GUIDANCE SUMMARY OF GENERAL AND SECTOR SPECIFIC MONITORING REQUIREMENTS is Type Quarterly Semi-Annual Benchmarks Effluent Limits Annual General Visual Rainfall pH, Sample pH, None Aquatic Toxicity(Years 1 &2) sample pH, O&G,COD, AND O&G,COD, TSS,P,TKN, Impaired Water parameters(if TSS,P,TKN, NO3,Cu,Pb, applicable) NO3, Cu,Pb,Zn Zn AND TMDL Parameter(s) (if dictated by DEP) SECTOR A Visual Same as general Same as Asphalt Aquatic Toxicity(Years 1 &2) ASPHALT PLANTS AND general emulsion AND Semivolatiles facilities ONLY: Sample pH,O&G,TSS O&G, Sample (Asphalt emulsion only) pH,TSS AND Impaired Water parameters(if applicable) AND TMDL Parameter(s) (if dictated by DEP) SECTOR B Visual Same as general Same as None Aquatic Toxicity(Years 1 &2) MINES&QUARRIES general AND Impaired Water parameters applicable) AND TMDL Parameter(s)(if dictated by DEP) SECTOR C Visual Same as general Same as Landfills and Aquatic Toxicity(Years 1 &2), REFUSE SYSTEMS AND general solid waste AND Fe(for AND disposal areas (for landfills and solid waste landfills and Fe(for landfills ONLY: BOD, disposal areas only)BOD,TSS, solid waste and solid waste TSS,Ammonia, Ammonia, Sample pH,Zinc, disposal disposal areas) Sample pH, Alpha Terpineol,Benzoic Acid, areas) Zinc,Alpha p-Cresol,Phenol Terpineol, AND Benzoic Acid, Impaired Water parameters(if p-Cresol,Phenol applicable) AND TMDL Parameter(s) (if dictated by DEP) SECTOR D Visual Same as general Same as None Aquatic Toxicity(Years 1 &2) AUTO SALVAGE AND AND general AND Fe,Hg,Al Semivolatiles AND Impaired Water parameters(if Fe,Hg,Al applicable) AND TMDL Parameter(s) (if dictated bv DEP) Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 1 of3 10/1/11 ype Quarterly Semi-Annual Benchmarks Effluent Limits Annual CTOR E Visual Same as general Same as None Aquatic Toxicity(Years 1 &2) CRAP RECYCLING AND AND general AND Fe,Hg,Al Semivolatiles, AND Impaired Water parameters(if PCB Fe,Hg,Al applicable) AND TMDL Parameter(s)(if dictated by DEP) SECTOR F Visual Same as general Same as Coal pile runoff Aquatic Toxicity(Years 1 &2), STEAM ELECTRIC AND general ONLY: and pH and TSS (for sites with GENERATION Fe AND pH,TSS coal pile runoff) Fe AND Impaired Water parameters(if applicable) AND TMDL Parameter(s) (if dictated by DEP) SECTOR G Visual Same as general Same as None Aquatic Toxicity(Years 1 &2) TRANSPORTATION general AND AND PUBLIC Impaired Water parameters(if WORKS applicable) AND TMDL Parameter(s)if dictated by DEP jWircraft Deicing Sites rge Airports Visual Same as general Same as None Same as above AND general Urea,Glycols, BOD(during deicing season, if used) Small Airports Visual None Same as None Same as above general but on AND an annual basis Same as General Monitoring Requirements in Section 5(e)(1)(A)(ii)(during deicing season) AND Urea,Glycols,BOD(during deicing season,if used) Maintenance/Repair/ Visual Same as general Same as None Same as above Salt Storage AND general Cl,Cn(for first two years only) Salt Storage only None None None None Impaired Water parameters(if applicable) AND TMDL Parameter(s)(if dictated by DEP) Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 2 of 10/1/11 Type Quarterly Semi-Annual Benchmarks Effluent Limits Annual SECTOR G(cont) DOT Maintenance& Visual Same as general None None Same as above Repair Facilities but only once in permit term SECTOR H Visual Same as general Same as None Aquatic Toxicity(Years 1 &2) MARINAS,YACHT AND general(but no AND CLUBS AND BOAT Fe,Al Cu Benchmark) Impaired Water parameters(if DEALERS AND applicable) Fe,Al AND TMDL Parameter(s) (if dictated by DEP) SECTOR I Visual Same as general Same as None Aquatic Toxicity(Years 1 &2) SHIP AND BOAT general(but no AND BUILDING AND Cu Benchmark) Impaired Water parameters(if REPAIR applicable) AND TMDL Parameter(s) (if dictated by DEP) SECTOR J Visual(if None COD,TSS,P, None Aquatic Toxicity(Years 1 &2) SMALL-SCALE site NO3,TKN(if AND COMPOSTING discharges) site discharges) COD,TSS,P,NO3,TKN(if FACILITIES site discharges) AND Impaired Water parameters(if applicable) AND TMDL Parameter(s) (if dictated by DEP) Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 3 of 10/1/11 APPENDIX C— AQUIFER PROTECTION AREAS AND OTHER GROUNDWATER DRINKING SUPPLY AREAS GUIDANCE In considering the use of stormwater infiltration,the Plan should consider measures to reduce or mitigate potential impacts to both ground water(aquifers) and surface waters,taking into consideration both quantity and quality of the runoff. The emphasis should be to minimize, to the extent possible,changes between pre- development and post-development runoff rates and volumes. The basic stormwater principals for Aquifer Protection Areas(and other groundwater drinking supply areas)are to prevent inadvertent pollution discharges/releases to the ground,while encouraging recharge of stormwater where it does not endanger groundwater quality. Measures include: • prevent illicit discharges to storm water,including fuel/chemical pollution releases to the ground. • minimize impervious coverage and disconnect large impervious areas with natural or landscape areas • direct paved surface runoff to aboveground type land treatment structures—sheet flow,surface swales, depressed grass islands,detention/retention and infiltration basins,and wet basins.These provide an opportunity for volatilization of volatile organic compounds to the extent possible before the stormwater can infiltrate into the ground. • provide necessary impervious pavement in high potential pollutant release areas. These"stormwater hot spots" include certain lands use types or storage and loading areas,fueling areas, intensive parking areas and roadways (see table below). • only use subsurface recharge structures such as dry wells, galleries,or leaching trenches,to directly infiltrate clean runoff such as rooftops,or other clean surfaces. These structures do not adequately allow for attenuation of salts,solvents,fuels or other soluble compounds in groundwater that may be contained in runoff. • restrict pavement deicing chemicals,or use an environmentally suitable substitute such as sand only,or alternative de-icing agents such as calcium chloride or calcium magnesium. Infiltration of stormwater should be restricted under the following site conditions: • Land Uses or Activities with Potential for Higher Pollutant Loads: Infiltration of stormwater from these land uses or activities(refer to Table 7-5 below), also referred to as stormwater"hotspots,"can contaminate public and private groundwater supplies. Infiltration of stormwater from these land uses or activities may be allowed by the review authority with appropriate pretreatment. Pretreatment could consist of one or a combination of the primary or secondary treatment practices described in the Stormwater Quality Manual provided that the treatment practice is designed to remove the stormwater contaminants of concern. • Subsurface Contamination: Infiltration of stormwater in areas with soil or groundwater contamination such as brownfield sites and urban redevelopment areas can mobilize contaminants. • Groundwater Supply and Wellhead Areas:Infiltration of stormwater can potentially contaminate groundwater drinking water supplies in immediate public drinking water wellhead areas. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 1 of2 10/1/11 Land Uses or Activities with Potential for Higher Pollutant Loads Table 7-5 of the 2004 Stormwater Quality Manual Land Use/Activities • Industrial facilities subject to the DEP • Road salt storage facilities(if exposed to Industrial Stormwater General Permit rainfall) • Vehicle salvage yards and recycling • Commercial nurseries facilities . Flat metal rooftops of industrial facilities • Vehicle fueling facilities (gas stations and . Facilities with outdoor storage and other facilities with on-site vehicle loading/unloading of hazardous substances or fueling) materials,regardless of the primary land use • Vehicle service,maintenance,and of the facility or development equipment cleaning facilities Facilities subject to chemical inventory • Fleet storage areas (cars,buses,trucks, reporting under Section 312 of the Superfund public works) Amendments and Reauthorization Act of • Commercial parking lots with high 1986(SARA),if materials or containers are intensity use(shopping malls,fast food exposed to rainfall restaurants,convenience stores, • Marinas and shipbuilding facilities (service supermarkets,etc.) and maintenance) • Public works storage areas • Other land uses and activities as designated by the review authority For further information regarding the design of stormwater collection systems in Aquifer Protection Areas, contact the Aquifer Protection Area Program at(860)424-3020. Bureau of Materials Management&Compliance Assurance DEP-PED-GP-014 2 of 10/1/11 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX B Stormwater Monitoring Data A►c1lo1 Cofy 414 General Permit for the Discharge of Stormwater Associated, •r..;;,,,, Industrial Aetivity,effective 10/1/2071 'r Sfonnimater Monlforfng Report Form General Requirements and Sector G Transportation Facilities Only (Do no submit if you have other sector speclfie requirements) Facility Information Permittee Name:Town.of South Windsor Site Name:pegartment of Public Works Facility Malting Address:1540 Sullivan Avenue South Windsor CT 06074 Contact Person:Mr.Michael J.Gantick.P E.FELF Title:plrgcfgr 9f Public Works Business Phone:f360.644.2511 ext.242 ext.:,,, ,,,,,Email:michael.or nticWsouthwindlsor ora Site Address:157 Burgess Road South Windsor CI' 06074 Receiving Water(name/basin):4000-19-1-L1 "-- — Permit P.GSi 000176 Primary SIC:9199 Discharges Into an Impaired Waterbody:Yes ❑ No ® (If yes,complete the table on page 3 of.this fibrin) Sample information Sample Location: DSN-001 ,Person Collecting Sample:Samantha Carey Datelrime Collected: 518/2012 6:60 P.M •Date of Previous Storm Event:51312012 This report is for samples required: Semiannually ® Annually ❑ Other ❑ . Check here!(the sample contains snow or foe melt, ❑ Check here if a benchmark exceedance is solely due to background or off site sources []we no%below Monitoring Results Required Results Benchmark Laboratory Rna meter :pm enc Benchmark Exceedanca• Test McO�ad qu y {units) (see pg'4) Name . rease Semi-annual <1.4mg/L 5.0 mg& ❑ EPA16B4A Phoenix ll pH Semi-annual -6.6 S.U. Na field measure Phoenbc e pH Semi-annual 7.11 S.U. 5-9 SU © 4500-W B1s040 Phoenix Semi-annual 43 75 mg/L ❑ SM522 D Phoenix Semi-annual 57 90 mull. SM254D Phoenix Semi-annual 0.32 0.40 mg1L. ❑ SM4500P E Phoenix Semi-annual 1.12 2.30 A- E351.1 Phoenix Seml-annual 0.23 1.10mg/L ❑ E353A Phoenixo er Seml-annual 0.014 MID mgA. ❑ 6010/200.7 Phoenix inc Semi-annual 0.030 0.160 mgA. ❑ 901VA0.7 Phoenixad Semi-annual 0.007 0.076 rn lL 60101200.7 Phoenix 24 Hr,L Annual-Year 1&2 y100°,6 Na 321-R-02-012 1 NEB 48!it LGan Annual-Year 1&2 >100% Na VII-R 02-012 NEB Exem tlorm L t here any parameter(s)that will not be sampled for the remainder of the permit term:'08 rote below NOTE: Complete the uData Tracking Table"(page 4 on this form)to show the parameter is eligible for the • monitoring exemption in Section NOX1)(Bx111)of the general permit, if you are disocntinuing monitoring for impaired water parameters(per Sectlon 5(eX1 XD)),or parameters that are present due to natural or background levels or off site run-on(per Section 5(e)(i xBXV)),attach addlttonal supporting information to this BUREAU OF MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE .DEEP-PEi -SMR•014 1 of 4 Rev.10/17/11 STORNEWATER ACUTE TOXICITY TEST DATA SHEET (required annually only during Year 1 and Year 2 of the permit) Site Name: Date/Time Begin: Date/Time End: Sample Hardness: Sample Conductivity: Test Species:Daphnia pulex c 24 hrs old Dilution Water Hardness: Effluent Number of Organisms Dissolved Oxygen Temperature pH Dilution Surviving (mglL) (°C) (su) Hoar 00 24 48 00 24 48 00 24 48 00 24 48 CONTROL 1 CONTROL 2 CONTROL3 CONTROL 4 6.26%A 6.25%B 6.25%C B.25%D 12.6%A 12.5%B 12.5%C 12.5%D 25%A 25%8 25%C 25%D 60%A 60%B 60%C 50%D 100%A 100%B 100%C 100%D REFERENCE TOXICANT RESULTS Test Species Date Reference Toxicant Sodree LCso Daphnia pulex BUREAU OR MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE DEEP-PED-SMR-014 •2 of-4 Rev.10/17111 • 1 I Additional Monitoring for Discharges to Impaired Waters(if applicable): Parameter Frequency Results(units) Test Method Laboratory Name Statement of Certification °i have personally examined and am fam0lar with the Information submitted in this document and all attachments thereto,and I certify that based on reasonable investigation,including my inquiry of the individuals responsible for obtaining the information,the submitted Information Is true,accurate and complete to the best of my knowledge and belief.I understand that a false statement In the submitted Information may be punishable as a criminal offense,In accordance with section 22a-6 of the General Statutes,pursuant to section 53a-157b of the General Statutes,and In accordance with any other applicable statute." o - Signature of P itfe Date Mr.Michael J.Gantick,P.E.,PWLF Director of Public Works • Name of Permittee(print or type) Title(If applicable) r' Cc, 9&nzz • /Z -y rZ- Signature of Preparer( t than above) Date Eric A.Andruk Environmental Scientist Name of Prepsrer(print or type) Title(If applicable) Please send all completed forms to: WATER TOXICS PROGRAM COORDINATOR BUREAU OF WATER PROTECTION AND LAND REUSE CT DEPARTMENT OF ENERGY$ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD,CT 06106-5127 BUREAU OF MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE DEEP-PEDSMR-014 3 of 4 Rev.I0f17111 General Permit for the Discharge of Stormwater Associated with Industrial Activity,effective 10MI2011 Data Tracking Sheet General and Sector G Transportation Facilities Only Monitoring Requirements Permittee Name:Town of South Windsor Permit#:GSI 000176 Site Name:Departmenit of Public Works Site Address:167 Buraess Road South Windsor CT,06074 Sample location:DSN-001 Enter the earnple.dates and the data reported for the four(4)most recent seml-annual sample results at this discharge location Into the chart below. To determine the average for the four samples add up each of the four results and then divide that number by 4. Average=(Sample 1+Sample 2+Sample 3+Sample 4) 4 Sample Result FpI 1 2 3 4 Qualify for 518/12 Average Benchmark" exemption? d91.4 mg/L 5.0 mg/L 7.11 S.U. 5-9 S.U. 43 mg/L 75 mg/L57 mg/L 90 mg1L 0.32 mg1L 0.40 mg1L 1.12 mg/L 2.30 mg1L NOrN 0.23 mg1L 1.10 mg/L Total Copper 0.014 0.059 mg/L MalL Total Zinc 0.030 0.100 mg& mg/L Total Lead 0.007 0,076 mg/L m 'If the average of the four(4)most recent samples is less than the benchmark listed,your facility is no longer required to sample semi-annually for that parameter for the rest of the permit(current permit expires 9/3012016).if your facility qualifies for an exemption from monitoring for sample pH,your facility is also exempt from monitoring rainfall pH for the remainder of the permit If the average of the four(4)most resent samples is equal to or greater than the benchmark listed,check the appropriate box on page t.if so,you have exceeded the benchmark and must continue to sample this parameter semiannually until the average is below the benchmark.See Section 5(e)(1)(B)of the General permit for requirements when exceeding a benchmark.If the sample result reported by the testing laboratory was below detection limit,for the purpose of averaging,use a value that is%Z the detection limit for that parameter In the formula above. For example, if the result for Oil&Grease was<2.0 mg/L,use a value of 1.0 mg/L for determining the average. Please refer to Section 5 e(I)B(III)of the General Permit for a more detailed explanation. BUREAU OF MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE DEEP PED-SMR-414 4 of 4 Rev.10/17111 Stormwater Visual Assent Field Data Sheet S Site: Otl ( QSS 'Rd' �� 0 Location Data Sample Location:SC.- Y111111-f Location ID- Sample Data Date: g Z Time-, Gg , SO Sampler: C Weather: Visual Parameters Sample Appearance/Description: Color - W Odor Clarity O Floating Solids Y If desrnbe: Settled Solids YID If yes,describe: Suspended Solids If XS,describe: SO Foy —YO If yes,describe: Oil Sheen Y/ If es,describe: Other Obvious indicators of stormwater pollution Y If yes,describe: Additional Comments: Instructions for filling out this form• One Visual Assessment must be performed each quarter(Quarters start Jan 1,April 1,July 1,Oct 1). Visual Assessment sample must be collected during a representative storm event(See Attachment G of Plan). Visual Assessment sample must be collected in a dean clear glass or plastic container. Sampler must visually inspect the sample in a well lit area. Sampler must fill out all blocks of form legibly Copy of completed form must be placed into the Stormwater Monitoring Data Section of facility's Stormwater Pollution Prevention Plan \PROJECTSMEL)\Vjm*_Asse-ca Data Sheet Anchor Engineering Services,Inc. Anc��r C°?Y General permit for the Discharge of Starmwater Associated wit .„• Industrial Activity,effective 101112011 '' S form water Monitoring Report Form 2012 General Requirements and Sector G Transportation Facilities Only (Do __submit If You have other sector specific requirements) Facility Information Permittee Name:Tow�t of South Windsor SIte Name:Department of Public Works Facifty Mailing Address:1040 Sullivan Avenue South Windsor CT 06074 Contact Person:Mr.Michael J.gantick P.E. PWLF Title:Director of Public Works Business Phone:860-044-2511 ext 242 ext.: Email:michmJxantickCcDsouthwindsor orct Site Address:157 Suruess Road.South Windsor CT 06074 _ Receiving Water(name/basin):4000-19-1-L7 Permit#:GS1Q00170 ^� PrimarySIC:9199 Discharges into an Impaired Waterbody:Yes ❑ No (if yes,complete the table on page 8 of this form) Sample Information Sample Location: DSN-001 Person Collecting Sample:Patrick McKay DateTme Collected: 10/19/2012 14.10 _Date of Previous Storm Event 10115112 This report is for samples required: -Semi-annually 0 Annually ❑ Other ❑ Check here If the sample contains snow or ice melt: ❑ Check here If a benchmark exceedance is solely due to background or off site sources ❑we rate below Monitoring Results i3equlred Resuits Benchmark. Parameter q y (units} Benchmark Exceedance- ' Testfl od Laboratory Fre uenc Name . :(seo pg 4) Oil&Grease Semi-annual <1.4 md/L 5.0 mg/L ❑ EPA ' Phoenixnfall pH Semi-annual --6.5 S.U. nraPhoenixSam a pH Semi-annual 7.2d s.U. 6-9 SU4500- p0 PhoenixCOD Semi-annual 75 mg/L 75 SM PhoenixTSS Semi-annual 64A SMPhoenixTP Seml-annual 0.08 mglL 0.40 mWL ❑ SM4 PhoenixTKN Seml-annual 11.6 mglL 2.30 93PhoenixNO$-N Semi-annual 0.01 mgA. 1.10 not ❑ E3PhoenixTotal CopperSemi-annual <0.005 mplL 0.069 m /L ❑ 6010 PhoenixTotal Zinc Semi-annual <0.002 mgA. 0.160 mg/L ❑ 8010 PhoenixotaLead Seml-annual 40.002 & 0.076 m L 6010 Phoenix 24 Hr.L Annual-Year 1&2 n/a 48 Hr.L Annual-Year 1&2 nra _ lrxem tions List here any parameter(s)that will not be sampled for the remainder of the permit torm:i80 note below NOTE: Complete the"Data Tracking Table"(page 4 on this form)to show the parameter is eligible for the monitoring exemption in Section 5(e)(1)(BXIIi)of the general permit. V you are discontinuing monitoring for Impaired water parameters(per Section 6(eX1 XD)),or parameters that are present due to natural or form. -on levels or off site run-on(per Section t5(ex1XB)(V)),attach additional supporting information to this BUREAU OF MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE DEEP-PED`SMR-014 104. Rev.10117/11 STORMWATER ACUTE TOXICITY TEST DATA SHEET (required annually only during Year 1 and Year 2 of the permit) Site Name. DatelTime Begin: Dateli'ime End: Sample Hardness: Sample Conductivity: Test Species:Daphnia pulex<24 hra old Dilution Water Hardness: R Number of Organisms Dissolved Oxygen Tempdrature pH Surviving (mgiL) (QC) (su) 00 24 48 00 24 , 48 00 24 48 00 24 48 e.25%A 6.25%B 6.25%n C 0.26%D 12.5%A 12.5%B 12.5%C 12.6%D 25%A 25%B 25%C 25%D 60%A. 50%B 50%C 50%D 100%A 100%B 100%C 100%D REFERENCE TOXICANT RESULTS Test Species Date Reference Toxicant Source Lcid Daphnia pubx BUREAU OF MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE DEEP-PED-SMR-"4 204 Rev.10J17111 1 1 Additional Monitoring for Discharges to Impaired Waters(if applicable): Parameter Frequeyrcy Results(units) Test Method. Labc;ratoryName Statement of Certification "I have personally examined and am familiar with the information submitted In this document and all attachments thereto,and I certify that based on reasonable Investigation,including my inquiry of the individuals responsible for obtaining the Information,the submitted information is true,accurate and complete to the best of my knowledge and belief.I understand that a false statement in the submitted Information maybe punishable as a criminal offense,in accordance with section 22a-6 of the General Statutes,pursuant to section 53a-157b of the General Statutes,and in accordance with any other appllcabie statute." Signature of i ee Date Mr.Michael J.Gantick,P.E.,PWLF Director of Public Works Name of Permittee(print or type) Titre(if applicable) Signature of Preparer(if different than above) Date Eric A Andruk Environmental Scientist Name of Preparer(print or type) Title(if applicable) Please send all completed forms to: WATER TOXICS PROGRAM COORDINATOR BUREAU OF WATER PROTECTION AND LAND REUSE CT DEPARTMENT OF ENERGY&ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD,CT 06106-6127 BUREAU OF MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE DEEP-PED-SMR-014 8 of 4 Rev.10/17/11 1 General Permit for the Discharge of StormwaterAssociated with Industrial Activity,effective 1011/2011 Data Tracking Sheet General and Sector G Transportation Facilities Only Monitoring Requirements Permittee Name:Town of South Windsor Permit#:GSI 00017e Site Name:Department of Public Works Site Address:157 Burgess Road South Windsor CT,06074 Sample Location:DON-001 Enter the sample dates and the data reported for the four(4)most recent semi-annual sample results at this discharge location into the chart below. To determine the average for the four samples add up each of the four results and then divide that number by 4. Average=(Sample 1+Sample 2+Sample 3+Sample 4) 4 Sample Result Parameter 1• 2 3 4 Average Benchrriark` Qualtfyfbr Sam a Date 518112 10/10/12 exempt(on? O&G <1A mgA. <1.4 mg& 5.0 mg/L Sample pH 7.11 S.U. 7,20 S.U. 6.9 S.U. COD 43 mg& 75 m91L 75 mall TSS 5T mg1L 64 mgAL 90 mg1L TP 0.32 mglL 0.08 mg/L 0.40 mg/L TKN 1.12 mg1L 11.8 mg& 2.30 mg/L NO3-N 0.23mgfL 0.01 mg/L 1.10 mg/L Total Copper 0.014 <0.005 mgiL 0.059 mg/L mall. Total Zino 0.030 <0.002 mg1L 0.160 mg/L m Total Lead 0.007 40.002 m911- 0.070 mg/L m fL *If the average of the four(4)most recent samples is less than the benchmark listed,your facility Is no longer required to sample semi-annually for that parameter for the rest of the permit(current permit expires 9130(2016).V your facility qualifies for an exemption from monitoring for sample pH,your facility is also exempt from monitoring rainfall pH for the remainder of the permit. If the average of the four(4)most resent samples is equal to or greater than the benchmark listed,check the appropriate box on page 1.If so,you have exceeded the benchmark and must continue to sample this parameter semiannually until the average is below the benchmark.See Section 5(e)(1)(13)of the General permit for requirements when exceeding a benchmark. If the sample result reported by the testing laboratory was below detection limit,for the purpose of averaging,use a value that is%the detection limit for that parameter In the formula above. For example, If the result for Oil&Grease was<2.0 mg/L,use a value of 1.0 mg/L for determining the average. Please refer to Section 5 e(1)B(Iii)of the General Permit for a more detailed explanation. BUREAU OF MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE DEEP-PED-SMR-014 4 of 4 Rev..i 0/17/11 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX C Spills/Leaks Records and Reportable Quantities List Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT SPILL/LEAK INCIDENT REPORT Date: Facility Name: Facility Location: Time of Incident: Facility Manager: Employees Present: Weather: Material: Quantity: Release to Stormwater System(Yes/No): If Yes,Estimated Quantity: Hazardous or Non-Hazardous: Responders (DEEP,Fire Dept.,Spill Contractor): Cause of Spill. Response Procedures: Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. • South Windsor, CT APPENDIX D Training Program and Employee Certifications • Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. • South Windsor, CT STORMWATER POLLUTION PREVENTION TRAINING PROGRAM Program Description This stormwater pollution prevention training program is instituted to provide facility employees with the information and techniques required to assure the facility stormwater pollution prevention plan (SWPPP) is properly implemented. The training programs will enable facility staff to have an improved understanding of the stormwater system and how to minimize the impact the facility has on the system. The training program consists of two components. The first aspect of the program is for employees to read the "Operational Procedures for Stormwater Pollution Prevention," which follows. The second aspect is attendance at courses for pollution prevention. The operational procedures and informational courses should be implemented and reviewed on an annual basis for all employees at the facility. Operational Procedures for Stormwater Pollution Prevention The most critical component of an SWPPP is the implementation of the plan by on-site employees. The following are some recommended operational procedures that will help reduce the amount of contaminants that enter the stormwater system: 1. Good Housekeeping Good Housekeeping refers to the general upkeep of the facility, including litter control, sweeping of roadways, spill cleanup and control, and maintaining erosion and sedimentation control devices. Good housekeeping practices should be employed by the personnel at this facility to provide a clean and orderly working environment. The goal of good housekeeping practices is to reduce the potential for stormwater pollution from on-site activities and spills. A. Litter Control Litter control is a maintenance item that, if possible, should be performed on a daily basis, or at least once/week. The facility should be walked over to assure that litter and debris is not entering or fouling any components of the stormwater management system. Cover roll-off containers stored outside when not in use and plug all drains. B. Sweeping Paved roads, drives, unloading areas (tipping floors, load out bays, truck docks), loading areas, and material storage areas should be swept periodically to remove any dirt or sand that has accumulated. Sweeping should routinely be performed once in the spring and again in late summer. Sweeping of dirt on paved surfaces greatly reduces the amount of sediment entering the stormwater system. • Any dirt and grit that enters the stormwater system and accumulates in catch basins should be removed periodically. Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT C. Maintaining Erosion and Sedimentation Control Devices Most erosion and sedimentation control devices perform their functions very well when properly maintained. However, if they are not maintained they can be largely ineffective. Maintenance of these structures consists of maintaining the integrity of the structures and the periodic removal of accumulated sediment. These structures should be inspected monthly and after each significant rain event to verify that they remain properly installed and that the quantity of entrapped sediment or debris is not impeding their performance. D. Spill Control and Cleanup Promptly remove/remediate all spills in accordance with the level of training that you have received and immediately notify the site manager. To reduce the likelihood of spills, return all chemicals and hazardous substances to their proper storage location as soon as possible, or at the end of the working day. Spill control materials are located on-site inside the building. Speedi-dry and oil absorbent pads should be kept in the inventory. There shall also be a spill kit located near the outdoor fuel storage tank. • E. Vehicle and Equipment Washing Vehicles and equipment will be washed inside the building at this facility. F. Stormwater Control Devices Properly maintain and periodically clean stormwater control devices including catch basins (sumps and inlet screens), sedimentation chamber, and drainage ditches. Stormwater control devices should be inspected quarterly and cleaned out at least once a year and as needed throughout the year. Any damage to these components should be repaired promptly. 2. Materials Handling Materials should be handled in a manner, which will reduce their potential exposure to stormwater. This potential can be reduced by the following techniques: storing hazardous materials and chemicals in a building with secondary containment; carefully handling and labeling chemicals and petroleum products; quickly and properly remediating spills; and covering materials stored outside to prevent stormwater from contacting any stored material. Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT EMPLOYEE CERTIFICATIONS By signing this form, I hereby certify that I have received training, read and understood the goals and intent of this stormwater pollution prevention plan. DATE NAME (Printed) SIGNATURE Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX E Inspections&Comprehensive Site Compliance Evaluation Reports Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX F Plan Revisions Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX G Monitoring Program • Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT A. Stormwater Monitoring Procedures Stormwater samples shall be collected at the drainage basin near the maintenance building and analyzed for the parameters listed above. This sampling location is noted on the Facility Site Plan in Appendix J, as DSN-001. All samples shall be collected from discharges resulting from a storm event that occurs at least 72 hours after any previous storm event generating a stormwater discharge. Any sample containing snow or ice melt must be identified on the Stormwater Monitoring Report form. If no discharge occurs during a monitoring period, a Stormwater Monitoring Report(SMR) form shall still be submitted in accordance with the "Reporting Requirements" section (Section 5(h)(3)) of this general permit. In such a case, a notation of"no discharge"shall be made on the SMR form. Grab samples shall be used for all monitoring and shall not be combined. Collection of grab samples shall begin during the first thirty (30) minutes of a storm event discharge (flow at sampling location) and shall be completed as soon as possible. Samples shall be taken at the outfall or nearest feasible location representative of the discharge. The uncontaminated rainfall pH measurement shall also be taken, when required, at this time. All discharge samples at a facility must be taken during the same storm event, if feasible. The following information shall be collected from the storm events monitored: • The date, discharge temperature, time of the start of the discharge, time of the sampling,and magnitude(in inches) of the storm event sampled • The pH of the uncontaminated rainfall(before it contacts the ground) • The duration between the storm event sampled and the end of the most recent storm event that produced a discharge. Unless otherwise specified in this permit, all pollutant parameters shall be tested according to methods prescribed in Title 40, Code of Federal Regulations (CFR), Part 136. Laboratory analyses must be consistent with Connecticut Reasonable Confidence Protocols. • Acute toxicity biomonitoring tests shall be conducted according to the procedures specified in Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater and Marine Organisms, 5th edition (EPA 821-R-02-012). The following specific conditions apply: • Tests shall employ neonatal(less than 24-hour-old) Daphnia pulex as test organisms; • Tests shall be conducted at 20 +/- 1 degrees Centigrade; • Tests shall be forty-eight(48)hours in duration; • Synthetic freshwater prepared as described in EPA 821-R-02-012 and adjusted to a hardness of 50 +/-5 mg/1 as CaCO3 shall be used as dilution water in all tests; Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor,CT • The sample shall not be hardness or pH adjusted or altered in any way; • The following test dilution series shall be utilized, expressed as percent stormwater sample: 100%, 50%, 25%, 12.5%,6.25%and 0%; • A minimum of twenty test organisms shall be exposed to each stormwater concentration, with each test concentration containing a minimum of four (4) test chambers Each test chamber shall contain a minimum of five(5) test organisms; • Test organisms shall not be fed during the test period; • Test results shall be reported as the LC50 value determined using the procedure specified in EPA 821-R-02-012; • Hardness in the stormwater sample and in the dilution control water shall be reported as mg/L as CaCO3; • Toxicity tests shall be initiated within thirty-six (36) hours of stormwater sample collection; and • Any test in which the survival of test organisms is less than 90% in the combined control test vessels or failure to achieve test conditions as specified, such as maintenance of environmental controls, shall constitute an invalid test and will require stormwater resampling and retesting as soon as practicable. If a permittee is unable to collect a sample pursuant to "Visual Monitoring" (Section 5(e)(1)(A)(i)) or "Additional Requirements for Certain Sectors"(Section 5(0) due to the inability to meet the conditions in subsection (A) above, the permittee shall, for visual monitoring, document such inability in their Plan or, for all other monitoring, submit the Stormwater Monitoring Report form in accordance with the "Reporting Requirements" section (Section 5(h)(3)) with a notation of "no discharge" and an explanation of the limitations restricting the collection of an appropriate sample. Reasons may include the absence of a 72-hour period of dry weather, the absence of a rain event that produces a stormwater discharge, the absence of a discharge from a detention or retention basin in accordance with subsection (A) above, or safety considerations preventing access to a stormwater discharge location. Timing of a rain event is not an acceptable reason to fail to sample unless it precludes the analysis of a parameter within the acceptable hold time specified by a laboratory. B. Visual Monitoring Once each quarter for the entire permit term, the permittee must collect a stormwater sample from each outfall (or a representative outfall pursuant to Section 5(e)(2)(B)) and conduct a visual assessment of each of these samples. These samples should be collected in such a manner that the samples are representative of the stormwater discharge. For monitoring purposes, quarters will begin on January 1, April 1,July 1 and October 1. The visual assessment must be made of a sample in a clean, clear glass, or plastic container, and examined in a well-lit area. The permittee must visually inspect the sample for the presence of the following water quality characteristics: • Color; 0 Odor; Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT • Clarity; • Floating solids; • Settled solids; • Suspended solids; • Foam; • Oil sheen; and • Other obvious indicators of stormwater pollution. The results of the visual monitoring will be recorded on a field data sheet and kept in Appendix B. If,based on the above indicators, the visual assessment indicates the control measures for the facility are inadequate or are not being properly operated and maintained, the permittee must review and revise the selection, design, installation and implementation of the control measures to ensure that the condition is eliminated and will not be repeated in the future. The permittee shall maintain documentation of these procedures in the Plan. C. Base Monitoring Requirements Sampling and chemical analysis of stormwater discharge at the site shall be conducted semiannually. One monitoring event shall be conducted between October 1 and March 31. The other monitoring event shall be conducted between April 1 and September 30. Monitoring events shall be separated by at least 30 days. Monitoring shall be conducted for the parameters listed below: • Chemical Oxygen Demand (mg/1) • Total Oil and Grease(mg/1) • pH (S.U.) • Total Suspended Solids (mg/1) • Total Phosphorus (mg/1) • Total Kjeldahl Nitrogen(mg/1) • Nitrate as Nitrogen(mg/1) • Total Copper(mg/1) • Total Lead(mg/1) • Total Zinc(mg/1) • Uncontaminated Rainfall pH (S.U.) Annual monitoring shall also be conducted for Aquatic Toxicity during the first two years of the permit (2011-2012 monitoring year and 2012-2013 monitoring year). D. Additional Sector Based Monitoring Requirements (Site Specific) In addition to the parameters required in "Monitoring" the permittee must sample any additional iparameters required in this subsection under the same conditions as those required in Section 5(e), unless otherwise specified in this subsection. Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT Per Section 5(f) of the General Permit, this facility falls under Sector G - Transportation and Public Works Facilities.The facility is subject to extra control measures and additional plan requirements, but is not subject to any additional monitoring requirements. E. Additional Parameters for Federal, State, or Municipal Facilities with Incidental Solid De- Icing Material Storage In addition to the general monitoring requirements, for facilities in this sector that have solid de-icing material storage on-site in conjunction with other activities, a sample shall be taken of a discharge that is representative of the quality of runoff from the deicing storage activity. Such sample shall also include the following parameters: • Chloride(mg/1) • Cyanide(mg/1) If the discharge location for this sample is already included in the facility's general monitoring program, these additional parameters may be included in that sample. Such facilities shall continue to monitor these additional parameters for the first two years of the permit term (four samples) and shall conduct visual monitoring pursuant to the requirements of "Visual Monitoring" for the entire term of the permit. The subject property is a Municipal Facility that contains liquid de-icing material storage. Based on this fact, the facility is not required to analyze the stormwater samples for the two additional parameters listed above. F. Monitoring Requirements for Federal, State, or Municipal Facilities Consisting Solely of Solid De-Icing Material Storage Industrial activities in this sector that consist solely of solid de-icing material storage with no other industrial activities on-site shall not be required to monitor for the parameters or conditions in the "Monitoring Requirements"section. =subjectoperty is a Municipal Facility however, this facility does not consist solely of solid de- torage. Based on this fact, the additional monitoring requirements are applicable to the Anchor Engineering Services,Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX H • Additional Sector-Based Requirements Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT SECTOR G TRANSPORTATION AND PUBLIC WORKS FACILITIES This sector applies to those facilities categorized as SIC Codes 40,41, 42, 43, 44 (except 4493) and 45 as well as those facilities described as public works garages Additional Control Measures In addition to the general control measures referenced in the permit, the permittee must implement the following control measures: Vehicle and Equipment Storage The permittee shall minimize the potential for stormwater exposure to leaky or leak-prone vehicles/equipment awaiting maintenance. The following are possible control measures: use of drip pans under vehicles/equipment; indoor storage of vehicles and equipment; installation of berms or dikes; use of absorbents; roofing or covering storage areas; and cleaning pavement surfaces to remove oil and grease(with proper wash water disposal). E ermittee shall maintain a supply of absorbents (speedy dry, pads, pigs, etc.) on-site, and utilize aterial to mitigate minor leaks of vehicles, equipment, and containersstored on-site on an as-basis.Drip pans will also be used on an as needed basis. Fueling Areas The permittee shall minimize contamination of stormwater runoff from fueling areas.The following are possible control measures: covering the fueling area; using spill/overflow protection and cleanup equipment; minimizing stormwater run-on/runoff to the fueling area; using dry cleanup methods; providing spill kits and catch basin covers nearby; and treating and/or recycling collected stormwater runoff. FEm ttee shall maintain a supply of absorbents (speedy dry, pads, pigs, etc.) in the vicinity of the ing area and utilize best management practices while operating the fueling pump to include: operators stay at the pumps while fueling and lock the pump when not in use. Vehicle and Equipment Cleaning The permittee must minimize contamination of stormwater runoff from all areas used for vehicle/equipment cleaning. The permittee must implement the following (or other equivalent measures): performing all cleaning operations indoors, where feasible; covering the cleaning operation, ensuring that all wash water drains to a proper collection system (i.e., not the stormwater drainage system); treating and/or recycling collected wash water,or discharging to sanitary sewer. Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor,CT • Facility personnel wash vehicles in a the designated wash bay in the maintenance building. This discharge is directed the sanitary sewer system after being routed through an oil/water separator.T t�i -scharge should be permitted under and'managed in"accordance with ¢he Genera :Permit fv�46 Pischi rge pf Vebi&-Maintenance' Wastewater Vehicle and Equipment Maintenance The permittee must minimize contamination of stormwater runoff from all areas used for vehicle/equipment maintenance. The permittee must implement the following (or other equivalent measures): performing maintenance activities indoors, where feasible; using drip pans; keeping an organized inventory of materials used in the shop; draining all parts of fluid prior to disposal; prohibiting wet clean up practices if these practices would result in the discharge of pollutants to stormwater drainage systems; using dry cleanup methods; treating and/or recycling collected stormwater runoff, minimizing run on/runoff of stormwater to and from maintenance areas. This facility performs vehicle and equipment maintenance indoors, additionally drip pans and good housekeeping measures will be used to prevent spills or leaks from coming in contact with stormwater. The permittee shall also maintain a supply of absorbents (speedy dry,pads,pigs, etc.) on-site to contain and clean up any spills or leaks. • Employee Training The permittee shall train personnel within 90 days of employment and at least once a year in accordance with "Control Measures" and address the following activities, as applicable: used oil and spent solvent management; fueling procedures; general good housekeeping practices; proper painting procedures; and used battery management. The employee training program is included in Appendix D. Drainage Area Site Map The permittee must identify in the Plan the following areas of the facility and indicate whether activities occurring there may be exposed to precipitation/surface runoff: • Fueling stations; • vehicle/equipment maintenance or cleaning areas; • storage areas for vehicle/equipment with actual or potential fluid leaks; • loading/unloading areas; • areas where treatment, storage or disposal of wastes occur; • aircraft de-icing areas; • • liquid storage tanks (including liquid de-icing and anti-icing materials); • processing areas; and • storage areas. Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT A Facility Site Map with the above information is included in AppendixJ. Potential Pollutant Sources The permittee shall assess the potential for the following activities and facility areas to contribute pollutants to stormwater discharges: Onsite waste storage or disposal; dirt/gravel parking areas for vehicles awaiting maintenance; illicit plumbing connections between interior floor drains and the stormwater conveyance system(s); aircraft de-icing material storage and application areas; and fueling areas. Describe these activities in the Plan. • On-site waste storage utilizes covered containers with drain plugs installed. • Dirt/gravel parking areas exist on the property and shall be maintained on an as needed basis • No illicit plumbing connections have been identified on-site. • No aircraft operations of any kind are performed on-site. • Fueling areas are located on-site and have secondary containment. Description of Good Housekeeping Measures • The permittee must document in the Plan the good housekeeping measures implemented consistent with"Additional Control Measures"above. JrG�oodHousekeeping Measures are detailed in the employee training program presented in Appendix D. Vehicle and Equipment Wash water Requirements If applicable, the permittee shall attach to or reference in the Plan, a copy of the NPDES permit issued for vehicle wash water or, if an NPDES permit has not been issued, a copy of the pending application. If an industrial user permit is issued under a local pretreatment program, the permittee shall attach a copy to the Plan. In any case, implement all non-stormwater discharge permit conditions or pretreatment conditions in the Plan. If wash water is handled in another manner (e.g., hauled offsite), describe the disposal method and attach all pertinent documentation/information (e.g., frequency, volume, destination, etc.) in the Plan. Facility personnel wash vehicles in a the designated wash bay in the maintenance building. This discharge is directed the sanitary sewer system after being routed through an oil/water separator. �. 6s �s ^y�± hS_ 1. Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. 46 South Windsor, CT Additional Inspection Requirements The permittee shall inspect all the following areas/activities: storage areas for vehicles/equipment awaiting maintenance, fueling areas, indoor and outdoor vehicle/equipment maintenance areas, material storage areas,vehicle/equipment cleaning areas; aircraft de-icing areas; and loading/unloading areas. Inspections are covered in section VIII of the SWPPP and Appendix E. s Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX I • Spill Prevention and Response Procedures Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT Spill Prevention and Response Procedures If any additional storage tanks are utilized in the future they will be stored in impermeable containment with a volume equal to the largest container, or 10%of the total container volume,whichever is larger. In the event of a spill, employees may attempt to contain the spill to prevent contaminants from entering the stormwater system. Spill control materials (e.g., speedi-dry, oil absorbent pads) are located directly adjacent to the ASTs. The team leader will be immediately contacted for directions on the proper handling of the spill. If a spill appears to be hazardous or a safety threat, then the local fire and police departments and CTDEEP should be contacted. If a spill or leak of potentially hazardous material occurs on-site the following section provides guidance as to the actions employees of the facility should take.The list of prescribed activities is generally in the order which they should be conducted. As soon as a spill is discovered by an employee, notify the facility manager. Attempt to stop the spill from entering a stormwater system (catch basins, swales, etc.). Be extremely careful in the handling of any unknown substance. The facility manager will quickly examine the spill and make a preliminary determination as to what the material is, determine if the spill will be treated as hazardous or non-hazardous, and will direct personnel to react accordingly. If the spill is determined non-hazardous, clean up the spill by utilizing proper cleanup techniques. Prepare a brief spill report for insertion into Appendix C of this document that includes, at a minimum, the following spill information: time, date, name of facility manager, employees present, type of material spilled, cause of spill, quantity of material released into the stormwater system, and a description on the procedure followed after the spill was detected. A spill report form may also need to be filed with the CTDEEP Office of Oil and Chemical Spills,which may be contacted at(860) 424-3338. If the spilled material is determined to be hazardous, or if the manager is uncertain, the manager will determine if the spill can be remediated by on-site personnel.If on-site personnel are utilized, follow the procedure in paragraph 3 above, except that the material must be handled and disposed of in accordance with state regulations for hazardous material.If the spill is in excess of the reportable quantity, as shown in Appendix C,the CTDEEP Office of Oil and Chemical Spills will be notified at(860) 424-3338. If on-site personnel are not determined to be capable of handling the spill, the facility manager will immediately contact the fire department (dial 911), CTDEEP Office of Oil and Chemical Spills (860- 424-3338), and a Connecticut licensed spill response contractor. Three such spill contractors and telephone numbers are listed below. Clean Harbors Environmental Service (800) 645-8265 Environmental Services,Inc. (860) 528-9500 Earth Technology, LLC. (203) 230-2040 United industrial Services (888)276-0886 Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT E tential for spills to occur is highest with the use of the ASTs and UST identified on the site Anchor Engineering Services, Inc. Town of South Windsor Public Works Facility 157 Burgess Rd. South Windsor, CT APPENDIX J Facility Site Plan COMPLIANCE SCHEDULE STORMWATER POLLUTION PREVENTION PLAN SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS FACILITY(TO INCLUDE CLOSED LF/LEAF COMPOSTING AREA) 157 BURGESS ROAD REVISED APRIL 2014 DhWeekl.._..3.............................. Monthl Y.. ..................... ...............................:.:.:.:.:..:.:.:.:.:....•.,.,.,.;.;.;.;Y:;:;:;:;:;:;:.;:;.;.;.;.;.;.;.;.;.Qua;rerh ;:;:;:;:;:;:;::;:::::::;:;:So qu-Annuall.:.;.;.:.:.;..;......... Informal Inspections All Areas Routine Inspections(Written) All Areas Comprehensive Inspections For Permit Duration Additional Sector-Specific Inspections Inactive LF Area Visual Monitoring Assessment For Permit Duration Base Parameter Monitoring For First Two Years(Min) Aquatic Toxicity Monitoring For First Two Years Additional Sector-Specific Chloride and Cyanide Monitoring For First Two Years of Permit Additional Sector-Specific Iron Monitoring Nor applicable if no leachare Additional Sector-Specific Annual Monitoring Nor applicable if no leachare For Permit Duration Employee Training For Permit Duration MONITORING PARAMETERS Quarterly Semi-Annual for 4 Events Semi-Annual as of4/1/14 Annual for 2 Years Visual Assessments COD(mg/1) Total Kjeldahl Nitrogen(mg/1)Aquatic Toxicity(LC 50) Total Oil and Grease(mg/1) Uncontaminated Rainfall pH pH(S.U.) Total Suspended Solids(mg/1) Total Phosphorus(mg/1) Total Kjeldahl Nitrogen(mg/1) Nitrate as Nitrogen(mg/1) Total Copper(mg/1) Total Lead(1ng/1) Total Zinc(mg/1) Uncontaminated Rainfall pH Chloride(mg/1) Cyanide(mg/L) J:\047\10\2011 SWPPP\20130808_Co,np1unce Schedule Anchor Engineering Services,Inc.