Loading...
HomeMy WebLinkAboutScanned on 02/02/2012 at 08:26:41 B-9.1 CHANGE ORDER No. 26 Project: South Windsor WPCF Upgrade Date of Issuance: January 18,2012 Owner: Town of South Windsor Contractor: C.H.Nickerson&Co. Inc. Project No.: Contract C-503 Duration: 900 days Engineer: Camp Dresser&McKee, Inc. Eng's Project No. 1806 You are directed to make the following changes in the Contract Documents. Description: See Attached Documentation Purpose of Change Order: See Attached Documentation CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Time $ 30,503,739.00 Final Completion: 900 days (days or date) Previous Change Orders Net change from previous Change Orders $ 889,884.00 0 (days) Contract Price prior to this Change Order Contract Time prior to this Change Order $ 31,393,623.00 Final Completion: 900 days (days or date) Net Increase of this Change Order Net Increase this Change Order $ 18,084.00 87 (days) Contract Price with all approved Change Orders Contract Time with all Change Orders $ 31,411,717.00 Final Completion: 987 days (days or date) This document will become a supplement to the CONTRACT and all provisions will apply hereto. Stipulated price includes all costs associated with the above described change. Contractor and Owner agree that the price(s)stated above are equitable and acceptable to both parties. RECO APPROVE AP O By: ?. E i By: By: - nginee ownef nt actor lZ, I Date bate Date Change Order 26 Town of South Windsor Water Pollution Control Facility Upgrade Contract C-503 Description of Change PCO No. 172 Railing In-fills at Anoxic Tanks The Contractor shall provide all necessary labor, materials and equipment to install new aluminum railings at the locations where the former Aerator Mixer bridges were removed at the Anoxic Tanks. PCO No. 174 Low Flow Air Switch The Contractor shall provide all necessary labor, materials and equipment to install conduit and wiring for the Odor Control system low flow air switch on a time and material basis. PCO No. 175 SITYP High Pressure Switches The Contractor shall provide all necessary labor, materials and equipment to install conduit and wiring for the SITYP pump high pressure discharge switches on a time and material basis. PCO No. 176 Glass Replacement at Control Building The Contractor shall provide all necessary labor,materials and equipment to install various new sections of window glass at the west elevation windows in the Control Building. PCO No. 177 Replace Catch Basin Tops The Contractor shall provide all necessary labor materials and equipment to furnish and install two new flat top catch basin tops at the west gate entrance. r PCO No. 178 Loading Dock Structural Repairs The Contractor shall provide all necessary labor, materials and equipment to perform structural repairs to the concrete Loading Docks at the Headworks and Control Bldg. Reason for the Change PCO No. 172 Railing In-fills at Anoxic Tanks PCO No. 156 required removal of 2 existing walkway bridges for the former Mechanical Aerators (of the old Aeration Tanks)which were not designated for demolition. In addition,per the original contract documents the two northern walkway bridges were designated for demolition by the Contractor. The documents made no provisions to furnish new in-fill railing sections at these four locations. The cost presented herein represents the cost to furnish and install various sections of 2 line aluminum railings at these locations at the Anoxic Tanks which were the converted Aeration Tanks. PCO No. 174 Low Flow Air Switch RFI No. 278 was presented to the Engineer requesting direction on the electrical wiring required for the low flow air switch on the Odor Control fans. Contract documents did not make provisions for this wiring. The cost presented herein represents the time and materials required to furnish conduit and wiring for the Odor Control system low flow air switch. PCO No. 175 SITYP High Pressure Switches RFI No. 275 was presented to the Engineer requesting direction on the SITYP pump manufacturers discharge high pressure switch for each pump. Contract documents did not make provisions for this conduit and wiring for the switch which was provided by the manufacturer. The cost presented herein, represents the time and material required to furnish conduit and wiring to provide a high pressure discharge alarm for each SITYP pump. PCO No. 176 Glass Replacement at Control Building The former laboratory was located on the first floor of the Control Building in the northwest corner. The upper west window elevation had contained . f i panes which did not have glass in them due to renovation work previous to this contract. Architectural drawings did not call for installation of new glass sections where pieces of plywood were currently installed. The Contractor was requested to provide a cost estimate to install four new glass sections at the west window elevation of the Control Building. PCO No. 177 Replace two Catch Basin Tops During reconstruction of an existing storm catch basin and repair of an existing 12" storm pipe at the west entrance gate,the Contractor submitted RFI No. 208 inquiring on the disposition of two existing catch basin tops west of the Administration Bldg and in the center of the entrance. The Owner directed the Contractor to replace the two existing catch basin tops. This was performed on a time and material basis and the costs are presented herein. PCO No. 178 Structural Repairs to Loading Docks Contract documents indicated to make minor structural repairs to the two concrete Loading Docks at the Headworks and Control Bldg. The Owner requested complete removal and replacement of these concrete docks. CDM Smith Structural Engineers visited the site in October and prepared a report on the condition of both docks. Their report did not warrant full replacement of the structures,however due to the time elapse between original design and construction, additional repair work and crack injection was required. The Contractor was directed to perform the additional repairs on a time and material basis. The overall total cost includes a credit for the original repair work which was included in the Contractor lump sum bid. Attachments (List Supporting Documentation) PCO No. 172 Railing In-fills at Anoxic Tanks Reference CHN RFI No. 270 dated 9-29-11 Reference CHN PCO No. 172 dated 1-03-12 Reference CDM approval letter dated 1-18-12 PCO No. 174 Plant Water System Revisions Reference CHN RFI No. 278 dated 11-17-11 Reference CHN PCO No. 174 dated 1-9-12 Reference CDM approval letter dated 1-14-12 y PCO No. 175 SITYP High Pressure Switches Reference CHN RFI No. 275 dated 10-18-11 Reference CHN PCO No. 175 dated 1-09-12 Reference CDM approval memo dated 1-14-12 PCO No. 176 Glass Replacement at Control Building Reference CHN PCO No. 176 dated 1-09-12 Reference CDM approval letter dated 1-14-12 PCO No. 177 Replace two Catch Basin Tops Reference CHN RE No. 208 dated 11-17-10 Reference CHN PCO No. 177 dated 1-09-12 Reference CDM approval letter dated 1-14-12 PCO No. 178 Structural Repairs to Loading Docks Reference CDM memo dated 10-25-11 Reference CDM COR No. 042 dated 10-24-11 Reference CHN PCO No. 178 dated 1-11-12 Reference CDM approval letter dated 1-16-12 Summary of Costs PCO No.172 Railing In-Fills $3,857.00 PCO No.174 Low Flow Switch $1,824.00 PCO No.175 High Pressure Switches $1,457.00 PCO No.176 Replacement Glass $2,983.00 PCO No.177 Replace CB Tops $1,866.00 PCO No.178 Repairs to Loading Docks $6,097.00 Total Cost $18,084.00 PCO No . 172 Page 1 of 1 From: Joyce,Thomas Sent: Wednesday, October 05, 20119:59 PM To: Stan Bujalski Cc: Lawson, Deborah; Kasle,Stephen Subject: Response to RFI#270-Anoxic Tank Railing Openings Yes,fill in gaps at all locations with 42"two post rail systems.And the other gaps. From: Stan Bujalski [mailto:sbujaiski@chnickerson.com] Sent: Thursday, September 29, 2011 1:55 PM To: Joyce, Thomas Cc: Kasle, Stephen; Shaw, Fred; Jeff Lavoie;Jonathan Miller Jr. Subject: RFI #270 -Anoxic Tank Railing Openings Tom, RFI#270: Existing railing to be left in place at the Anoxic Tank has openings where the existing equipment bridges were removed. Please clarify if you wish to have these openings addressed for safety concerns. Stanley T. Bujalski, TM Executive Vice President C. H. Nickerson & Company, Inc. Torrington, CT 860489-0455 860496-0483-Fax www.chnickerson.com AA/EOE file://CADocuments and Settings\kaslesd\My Documents\South Windsor Folders\SW RFT's... 1/14/9019 Nickerson PROPOSED CHANGE ORDER No. 00172 GENERAL CONTRACTORS TITLE: Railing Openings @ Anoxic Tank DATE: 1/3/2012 PROJECT:South Windsor WPCF Upgrade JOB: 500-422 TO: Attn: Thomas A.Joyce,P.E. CONTRACT NO: 1 Camp Dresser&McKee,Inc. Jefferson Mill 670 N Commercial Street Manchester,NH 03101 Phone: 603-222-8345 Fax: 603-628-7675 RE: Issue: FF240 AESCRY:P3'ION=::QI?`•PROPUSAL : . : ::-;;-`; . :. .. . This Proposed Change Order is for the additional cost to furnish and install aluminum railing at various openings in existing railing at the Anoxic Tank per the RFl#270 response. Item .`Description Quantity Units - Unit Price NetAmount. 00001 PMWI Change Order#101 1.000 LS $2,467.00 $2,467.00 00002 Spreadsheet Summary 1.000 Ls $1,280.60 $1,280.60 00003 15%0verhead 8s Profit 1.000 LS $562.14 $562.14 00004 1%Bond Cast 1.000 LS $43.10 $43.10 The foregoing proposal includes direct labor and material costs only. Unit Cost: $4,352.84 Because this change order may affect the performance of our contract work, C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: S0.00 such Impact costs which may result and to request an extension of time Lump Sum: $0.00 1 necessary when these items can be assessed. This proposal is valid for 30 days. After 30 days,this proposal Lump Tax: $0.00 Prop Ys• Y p posal is subject to change for any price increases which may apply Total: $4,352.84 APPROVAL: By: By: ZW///, Thomas A. Joyce,P.E. t iey PXildsO,PE Date: Date: 1/3/2012 cc: FF240 Field Office C.H.Nickerson+Co.,Ina -49 Hayden Hill Road-PO Sox 808 - Torrington,CT 06790-0808 Phone: 860489-0455 - Fax: 860-496-0483 -PLM.0204803-P1-SHM.005805-SM1-M/EOE OWNER CHANGE ORDER ARCHITECT CONTRACTOR FIELD OTHER PROJECT: 09-1362 CHANGE ORDER#: 101 South Windsor,CT WPCF PO Box 808 49 Haydon Hill Road CHANGE ORDER DATE: 10/19/2011 Torrington,CT 06790-0808 PROJECT#s: TO: Pleasant Mount Welding,Inc. DATE OF CONTRACT: 06/16/2009 45 Dundaff Street Carbondale,PA 184071801 FOR: mist metals The Contract is changed as follows: PENDING CHANGE ORDER 1362PC9 DATE MATERIAL REQUIRED ON SITE: i 1 5 sections 2-line alum handrail w/2 posts each $2,259.00 1 at V,1 at 62.6%1 at 64"&1 at 516" Cost to supply toeboard on these 5 sections $208.00 Total Contract Change(add) $2,467.00 Freight Included—Tax Not Included "As a policy of PMWI,we will issue a 100%credit for an item that is no longer needed,contingent upon the item was not detailed yet. As an industry standard,if we detailed the item,in the anticipation that you will need it,and it needs to be deleted at a later date,we will issue a 90%credit for that item". The original Contract Sum was $193,792.00 The net change by previously authorized Change Orders is $10,972.00 The Contract Sum prior to this Change Order was $204,764.00 The Contract Sum will be increased by this Change Order in the amount of $2,467.00 The new Contract Sum including this Change Order will be $207,231.00 The Contract Time will be increased by 0 days. The date of Substantial Completion as of this Change Order therefore is Unchanged Not valid until signed by all parties below. Pleasant Mount Welding,Inc. C.H.Nickerson&Co.,Inc. ARCHITECT CONTRACTOR OWNER 45 Dundaff Street PO Box 808 49 Haydon Hilt Road ADDRESS ADDRESS ADDRESS Carbondale,PA 184071801 Torrington,CT 08790-0808 BY (Signature) BY (Signaaurs) BY (Signature) Kenneth O'Hara (Typed Name) (Typed Name) (Typed Name) DATE DATE DATE Quantum Software Solutions,Inc.Document SOUTH WINDSOR WATER POLLUTION CONTROL FACILITY FIELD FILE#240-Railing Openings @ Anoxic Tank UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNIT PRICE MATERIAL PRICE LABOR COST EQUIPMENT: Small Tools(3%LABOR) $30.60 $30.60 Pickup Truck 10 HR. $15.00 $150.00 $150.00 Chipping Guns/Hammer Drills 10 HR. $8.00 $80.00 $80.00 SUB-TOTAL EQUIPMENT $260.60 LABOR: Carpenter Foreman 10 HR. $84.00 $840.00 $840.00 Coordination 2 HR. $90.00 $180.00 $180.00 SUB-TOTAL LABOR $1,020.00 SUB-TOTAL MATERIAL,EQUIPMENT&LABOR $1,280.60 CDM S ith South Windsor Field Office 1 Vibert Road South Windsor, Connecticut 06074 Tel: 860-282-0123 Fax: 860-291-8795 To: Stanley R. BujalskiZMa/gger PE Project Manager From: Stephen KasleSite Construction Date: January 18, 2012 Subject: Town of South Windsor Connecticut WPCF Upgrade Contract No. C-503 PCO No. 172 Railing In-fills Anoxic Tank Stanley, We have received your Proposed Change Order No. 172 dated January 3, 2012, regarding the additional cost of$4,352.84 for the installation of aluminum railing in-fills at the Anoxic Tanks where the existing walkway bridges were removed and offer the following comment: Due to the existing railing system which do not have toeboards; do not furnish toeboards with the new in-fills. The cost of$208.00 for the toeboards was removed from your cost proposal and the labor to install same was reduced by 2 hrs. Please see the revised attached cost summary sheet based on CDM Smith a-mails dated 1-16-12 outlining same. The revised amount, $3,857.00(rounded up)will be included in a forthcoming Change Order for the Owners signature. If you have any questions, please contact us. Cc: Fred Shaw Town of South Windsor Tom Joyce CDM PCO Field File SW WPCF PCO No.172 Railing In fills Anoxic Tanks Response Memo 1 1812.doc ® Nickerson PROPOSED CHANGE ORDER kL ----- ._.__ N0.00172 GENERA!.CONTRACTORS TITLE: Railing Openings @ Anoxic Tank DATE:1/3/2012 PROJECT:South Windsor WPCF Upgrade JOB: 500422 TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:1 Camp Dresser&McKee,Inc. Jefferson Mill 670 N Commercial Street Manchester,NH 03101 Phone: 603 222-834S Fax:603-628-7675 RE: ' Issue: M40 ::. . ..: MFSG t-W-UQN::�I? This Proposed Mange Order is for the additional cost to fumish and install aluminum railing at various openings in existing railing at the Anoxic Tank per the RFI#270 response. Item tiescrlption Quantity Units Upit-Pciee Nit.-Arnopnt 00001 PMWI Chasse Order#101 1.000 LS � 00002 spreadsheet summary l.00o Ls !f ofo(� ! Qtfl S� 00003 1516 Overhead do Prot 1.000 LS 4—q g��'6. }q S565H4 54, 00004 19S soaa cast 1.000 Ls ateSO= The toregoing jai includes d'Kecx tabor and material costs only. 6¢ Because this change order may affect the performance of our contract work. Unit Cost: C.H.tickerson+Co..Inc.reserves the right to seek compensation for any Unit Tax: $0.00 .�, such Impact costs which may result and to request an extension of time if necessary when these items can be assessed. Lump Sum: $0.00 1 This proposal is valid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00 to change for any price Increases which may apply Total: VeO APPROVAL: By: By: Thomas A.Joyce,P.E. t eyWU' Date: Date: 1/3/2012 cc: FF240 Field Office C.H.Nickerson+Co.,Ina-49 Hayden Hill Road-PO Sox 80s-Torrington,CT 06790-0sm Phone: 860489-0455 -Fax: 860496-0483-PLM.0204803-Pt-SHM.005805-SM1-AAfEOE OWNER ❑ CHANGE ORDER ARCHITECT ❑� CONTRACTOR FIELD ❑ OTHER ❑ PROJECT: 094362 CHANGE ORDER#: 101 South Windsor,CT WPCF CHANGE ORDER DATE: 10/1912011 PO Box 806 49 Haydon Hill Road Torrington,CT 06790-0808 PROJECT#s: TO: Pleasant Mount Welding.Inc. DATE OF CONTRACT: 06/1612009 46 Dundaff Street FOR: misc metals Carbondale,PA 184071801 Tha Contract is chanced as follows: PENDING CHANGE ORDER 1362PC9 DATE MATERIAL REQUIRED ON SITE:! / 5 sections 2-line alum handrail wl 2 posts each $2,269.00 1 o to u 5'2.t�oard on these 5 sections = 'Cost to supply Total Contract Change(add) Freight Included—Tax Not Included "As a policy of PMWI,we will issue a 100%credit for an item that is no longer needed,contingent upon the item was not detailed yet As an industry standard,if we detailed the item,in dre anticipation that you will aced it,and it needs to be deleted at a later date,we will issue a 90%credit for that item"• $193,792.00 The original Contract Sum was $10,972.00 The net change by previously authorized Change Orders is $204,764.00 I The Contract Sum prior to this change Order was $2,467.00 The Contract Sum will be Increased by this Change Order in the amount of $207,231.00 - The new Contract Sum including this Change Order will be 0 days. The Contract Time will be increased by Unchanged i The date of Substantial Completion as of this Change Order therefore is i Not valid until signed by all parties below. Pleasant Mount Welding,Inc C.H.Nickerson&Co.,Inc. j OWNER ARCHITECT CONTRACTOR 45 Dundaff Street PO Box 808 49 Haydon HERoad � ADDRESS ADDRESS ADDRESS Carbondale,PA 184D71801 Torrington.CT 06790-0808 BY (Srinafure) BY (Srgnwe) BY (Slomwro) Kenneth O'Hara (Typed Name) (typed Name) (Typed Nam) DATE PATE DATE Quantum Software Solutions,Inc.Document i �i a SOUTH WINDSOR WATER POLLUTION CONTROL FACILITY FIELD FILE#240-Railing Openings Anoxic Tank , UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNIT PRICE MATERIAL PRICE LABOR, COST EQUIPMENT: Small Tools(3%LABOR) $ $fig 2 ' g"lv Pickup TruckHR. $15.00 $ .00. Chipping Guns/Hammer Drills 4&&HR. $8.00 $g�80 �,� �� ( SUB-TOTAL EQUIPMENT 9 S� LABOR: �?7z Carpenter Foreman 4L R. $84.00 $04"o $04"o Coordination 2 HR. $90.00 $180.00 $180.00 SUB-TOTAL LABOR SUB TOTAL MATERIAL,EQUIPMENT&LABOR PCO No . 174 Page 1 of 1 From: Joyce,Thomas Sent: Friday, November 18, 20117:34 AM To: Stan Bujalski; Gary Willard Cc: Lawson, Deborah; Kasle,Stephen Subject: Response to RFI #278 Odor Control Fan Low Flow Air Switch Power Attachments: 422 RFI-278 Odor Cnti. Fan Low Air Flow Switch Power.pdf See below. From: Kasle, Stephen Sent: Friday, November 18, 2011 7:12 AM To: Joyce, Thomas Cc: Lawson, Deborah Subject: FW: 500-422 South Windsor WWTF, RFI-278 Odor Control Fan Low Flow Air Switch Power Response to RFI No.278: The direction described in RFI No.278 is acceptable, please proceed in that manner. Stephen Kasle Site Construction Manager CDM Field Office South Windsor WPCF 1 Vibert Rd South Windsor,CT, 06074 Tel:(860)282-0123 Fax: (860)291-8795 From: Gary Willard [mailto:gwillard@chnickerson.com] Sent: Thursday, November 17, 2011 10:04 PM To: Kasle, Stephen Cc: megan@wjgei.com; Ipantano@wjgei.com;jpmichalec@aaronct.com; Stan Bujalski; Jeff Lavoie; Jonathan Miller Jr. Subject: 500-422 South Windsor WWTF, RFI-278 Odor Control Fan Low Flow Air Switch Power Steve, Attached for your information and response is RFI-278. Please confirm we have correctly directed our subcontractor to resolve this issue. Gary file://CADocuments and Settings\kaslesd\My Documents\South Windsor Folders\SW BFI's... 1/14/2012 Nickerson PROPOSED CHANGE ORDER No. 00174 GENERAL CONTRACTORS TITLE: Odor Control Low Flow Switch DATE:1/9/2012 PROJECT:South Windsor WPCF Upgrade JOB: 500-422 TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO: 1 Camp Dresser&McKee,Inc. Jefferson Mill 670 N Commercial Street Manchester,NH 03101 Phone: 603-222-8345 Fax: 603-628-7675 RE: Issue: FF258 DESC 1O1v:0F ftOPOSAL This Proposed Change Order is for the additional cost to perform Time&Material electrical work in accordance with the RE#278 for the Low Flow Switch on the Odor Control System. Item Description Quantity Units Unit Price' Net Amount 00001 Wayne 1'Griffin Proposal#103 1.000 Ls $1,720.00 $1,720.00 00002 501*Overhead&Profit On Subcontractor Work 1.000 iS $86.00 $86.00 00003 Bond Cost 1.000 ES $18.06 $18.06 The foregoing proposal Includes direct labor and material costs only. Unit Cost: $1,824.06 Because this change order may affect the performance of our contract work, C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00 such impact costs which may result and to request an extension of time Lump Sum: $0.00 if necessary when these items can be assessed. This proposal Is valid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00 to change for any price increases which may apply Total: $1,824.06 APPROVAL: By: By: Thomas A.Joyce,P.E. nl y R J ,PE Date: Date: 1/9/2012 cc: FF258 Field Office C.H.Nickerson+Co.,Inc.-49 Hayden Hill Road-PO Box 808-Torrington,CT 06790-0808 Phone: 860-489-0455-Fax: 860.496-0483-P1M.0204803-P4-SHM.005805-SM'i-/WEOE W Now WNYNEJ .IFFIN ELECTRIC INC. January 9,2012 VIA Env AIL&MAIL: sbuj.alskit'cr��chnickerson.com 1vlr. Stan Bujalski,Executive Vice•Presfdent C.H.Micl-er-son&Company, Inc. 49 Hayden Hill Road Torrington;CT 06790 f, 2 RE! Job#1475—South,Windsor WPCF, South Windsor,.CT Proposal#_10.3 Dear-Mr.Bujalski: In accordance with the field change order signed by your.authorized representative,Jeff Lavoie,.the contract should be modified to include the following revision. Labor and material to provide 110V to the FSL-8000 which is fed_from.PLC-PC. 'Material $ 610.00 Labor 858.00 Overhead&Profit 22.8.0:0 Subtotal $1,695.00 Bond 24.00 'Total :$1,720.00 This.additional work will require one(1)day added to the completion.date. Please issuea written change order as the work above has been completed. The costs included in this field change do not :include any amounts for extended-contract duration,oven time,.changes in.the.sequence of work, acceloiretion,disruptions,interference.and/or impact costs,and the right is eoressly reserved to recover for any and all of these-related items of cost:prior to any final settlement ofthis contract. The working relationship between your company,and ours shall be in accordance with an: appropriate:AIA contract or other mutually agreed to contract form. CorporatelTeadquartets: Licenses: Resionol.ofGces: 116 Hblaping SWA Road MA .A8999 296 Cahaba Valley Parkway 2501 Akae.RW6v Ro.;ci. 1950 everarctn Blvd. Holllston,MA 01746 NH -4221M Pelham,AL 35124. Suiet G-1.00 Suite 369 VT .1;1NWO3 Raleigh,.NC.27607 Duluth;6A 36006 Cr BLC0123697•El AL License 16318 me License 16529U GA Liceatse EN213.065 phone: (509)429-8830 RI AC003520 Reim (205)733-8848 Phone: (919)782.0720 Phone: (678)417.9377 Fm (508)429M25 ME. NIC6.00I7598 Fax: {205)733-8107 .Fax: (919)7.82-0724 Fax: -(679)417-9373 Mr. Stanley Bujalski January 9,2012 Page 2 Wayne J. Griffin Electric, Ino.reserves the right to-void this proposal after thirty(30)days from the above date. Very truly yours, WAYNE J. GRIFFIN ELECTRIC,INC. L Pantano enior Project Manager LP/dpc ACKNOWLEDGMENT, The contract modification stated for the above field change is acceptable for the work already performed. The value-of the work completed to the date of the next requisWon mgLy lie I illed.on that requisition. Date: Authorized Signature: cc: Martin Egan,Project Foreman,Wayne J. Griffm Electric,Inc. ccN4 110V FROM-PLC TO FSL8000 Wayne J.Griffin Electric, Inc. Project Name: South Winidsor WPCF -116 Hopping Brook Road "eat Number. 1475 Holliston,MA 01746 Page Number. I Telephone-608-429-8830 CH Nickerson Work Description We reserve the right to correct this quote for errors and omissions. This quote ommers direct cwW,only and we rowathe right to dift fbr Impectand consequential costs. Ttft pripels good fbr-wAq#.an'ce WhIn 11 ft ft d days diadate rea*L WbYA supply:wd Wag 4'*96is,Z;e,and equipment.asper your instructions to provide 110V'toFSL-8000 fed froin PLC-PC Rdimind Brookdown Descdlptloh Qty Net Price.U Total Mat($) Labor U Total Hours 3/4> 1JZ--'-REDUCJNG-RU.8HlNG 1 546.50 C 5.4.6 0-00 0 0:00 314"PVC CTD QR; 40 62740 C- 2550.96 0.*-00 C O.W. We PVC CM'GRC-C-P.LG 4 568.88 0 23.96- 0.00 C 0.00 31411 PVC GM T 1 80.4.8 E 80.48. 0.0.0 t U.0. XV PVC C TD 00 DEG FELBOW 1 2,073.19 C 20.7.8 0.00 C 0.00 V"PVC CM. 1-H MALL STRAP 3 1.182.92 C 36..48 0.00 C 0.00 31411 PVC CM CLAMPBACK 3 1,788.00 C 53.64 0.00 C 0.00 'lit"LT FLEK 5 2.6540-C 13.25 0.00 C 0.00 Vr LT-SIM.GHT. CONN 2 :386.54-C 7.73- 0.0.0-C 6.0b #14 TH14N sLAcK 500. 236.86-M 1118.43 0.0.0.M 0.00 Labor Only 12 0.00 E 0.00 1.00.E 12.00 Totals 610.17 12.00 - Summary General Materials: 610.17 Material Total 61,01117' Electrician (12.60 Hrs 0 S711.50). $58.00 Subtotal 1,468.17- Oveifie*ad %Q00 9b 146,82. Pf ofit to-U0Q 80.75 Bond .23774 Final Amount $1,71&48 WAYNE J.GRIFFIN ELECTRI•C,.114C. WORK AUTHORIZdTION DATE: a ' 1.16 HOPPINe BROOK ROAD 'AtNDADURESS NUMBER �''f r7S CHECK ONE: HOLLISTOM,MA.01746- PAGE / OF �I TERIAI. TEL.508-A•29-8830 FAX:$08-4�94$..25 DIVISION wORR cu5rotw�uwr: G rr i k jl'r rso�/ , - // _ aye, G• orHEa ESCRI OF RIC rf�C / (^�G �I�L"' PLEASE SPECIFY STREET �, �^ crry auTE ��L!�"AL /,Ji3e✓ /`/�af �1'r�j �'d 001 �nEeoRrneR� EA ,Iza PRE-WORKAUTHORVATION: DATE: ! Z AUTHDRIZED.SIONATURE YOU ARE'HEREBY AUTHORIZED'TUPERFORM THE A8 • -ADDITIO : 'WORK UH(LiEHTkIE>SAME:CrQNplT10NSA$SPECIFI,ED'IR(T.HE ORIGINAL CONTRACT PROPOSAL 1NLESS O7HERN/ISEl IPULATI D MATERIAL AND LABOR 13REAKDOWN: (QUANTITY MATERIAL � UAiNTITY MATERIAL 2 . 31c u � ink' .. "3 ' D S�J�•c ONE 11 a 3J a I �r k 57 d 1Y?`�Yflr� -- C 44;k' 70- . Chl air else xr ! °::'' C ►le�v� TIME AND LABOR RECORD: VVORIEER DATE IN OUT IN OUT HOURS WORKER DATE IN OUT IN OUT HOURS �.f• CC:2C AUTHOR 'SIGNATURE DATE: White-Acoounlin Yellow-Cllent Pink-ProlddlVidnadsi Gold-Forerhan The labor and mateYlals listed above are rate end'th-work was coot loW sall0actorll CDM= S ith South Windsor Field Office 1 Vibert Road South Windsor, Connecticut06074 Tel: 860-282-0123 Fax: 860-291-8795 To: Stanley R. Bujalski, PE Project Manager From: Stephen Kasle - er Site Construction M ag Date: January 14, 2012 Subject: Town of South Windsor Connecticut WPCF Upgrade ' Contract No. C-503 PCO No. 174 Low Flow Air Switch Odor Control System Stanley, We have received your Proposed Change Order No. 174 dated January 9, 2012, regarding the additional cost of$1,824.06 for wiring the Odor Control system low flow air switch on a time and material basis and find the cost acceptable. This amount, $1,824.00(rounded down)will be included in a forthcoming Change Order for the Owners . signature. If you have any questions, please contact us. Cc: Fred Shaw Town of South Windsor Tom Joyce CDM Smith PCO Field File SW WPCF PCO No.174 OC Low Flow Switch Response Memo 1 1412.doc PCO No . 175 p Page 1 of 2 From: Joyce,Thomas Sent: Thursday, November 17, 20115:16 PM To: Stan Bujalski Cc: Lawson, Deborah; Kasle,Stephen Subject: Response to RFI #275 Sodium Hypochlorite Pump Pressure Switches Attachments: RFI-275 Sodium Hypochlorite Pump Pressure Switches.pdf Importance: High Response to RFI No.275 The pressure switches mentioned in RFI No. 275 are currently mounted in the field. Install 2 No. 14 wires from each switch back to PLC-CB. Discussions with WJGE,they can utilize spare conduit for some of the distance between the chemical room and the electrical room and will provide a new conduit drop to each switch.The contact from each switch shall provide a "High Pressure SITYP Pump No.1"and "High Pressure SITYP Pump No.2"alarm at PLC-CB, utilize 2 spare digital inputs at PLC-CB. CDM AE group will write software to shutdown the pump upon initiation of the switch contact.A COR will follow. Stephen Kasle Site Construction Manager CDM Field Office South Windsor WPCF 1 Vibert Rd South Windsor, CT, 06074 Tel:(860)282-0123 Fax:(860)291-8795 From: Stan Bujalski (mailto:sbujalski@chnickerson.com] Sent: Tuesday, October 18, 2011 2:17 PM To: Joyce,Thomas Cc: Shaw, Fred Subject: FW: 500-422 South Windsor WWTF, RFI-275 Sodium Hypochlorite Pump Pressure Switches Importance: High FYI. RFI#275. Stanley 9 Buja66 Tte Executive Vice President C. H. Nickerson& Company, Inc. Torrington, CT 860-489-0455 860-496-0483-Fax www.chnickerson.com AA/EOE From: Gary Willard Sent: Tuesday, October 18, 2011 9:21 AM To: Steve Kasle (KasleSD@cdm.com) Cc: Stan Bujalski; Jeff Lavoie; Jonathan Miller Jr. Subject: 500-422 South Windsor WWTF, RFI-275 Sodium Hypochlorite Pump Pressure Switches file://C:\Documents and Settincs\kaslesd\Mv Documents\South Windsor Folders\SW RR's... 1/14/2012 Page 2 of 2 Importance: High Steve, Attached is RFI-275, please review it and advise us as soon as possible as how to proceed. Work will be proceeding on this system now that the flooring has been completed. If you should have any questions, please contact me. Gary file://C:\Documents and Settingslaslesd\Mv Documents\South Windsor Folders\SW RR's... 1/44/2012 PROPOSED CHANGE ORDER Nickerson No. 00175 GENERAL CONTRACTORS TITLE: Chemical Pump Pressure Switches DATE:1/9/2012 PROJECT:South Windsor WPCF Upgrade JOB: 500-422 TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:1 Camp Dresser&McKee,Inc. Jefferson Mill 670 N Commercial Street Manchester,NH 03101 Phone: 603-222-8345 Fax: 603-628-7675 RE: Issue: FF025 DESCRIPTION OF PROPOSAL This Proposed Change Order is for the additional cost to provide electrical wiring for the pressure switches at the Sodium Flypochlorite Pumps per the RFl#275. Item Description Quantity Units Unit Price Net Amount 00001 Wayne J.Griffin Elemic Proposal#102 1.000 LS $1,374.00 $1,374.00 00002 5"/o Ovenccad&Profit on Subcontractor Work 1.000 LS $68.70 $68.70 00003 1%Bond Cost 1.000 LS $14.43 $14.43 The foregoing proposal includes direct labor and material costs only. Unit Cost:. $1,457.13 Because this change order may affect the performance of our contract work, C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00 such impact costs which may result and to request an extension of time Lump Sum: $0.00 if necessary when these items can be assessed. This proposal is valid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00 to change for any price increases which may apply Total: $1,457.13 APPROVAL: By: BY: Thomas A.Joyce,P.E. B uj allK, Date: Date: 1/9/2012 FF025 Field Office C.H.Nickerson+Co.,Inc. -49 Hayden Hill Road-PO Box 808-Torrington,CT 06790-0808 Phone: 860-489-0455- Fax: 860-496.0483-PLM.0204803-P1-SHM.005805-SMI-AA1EOE WAY I&J. GRIFFIN ELECTRYC January 9,,20_l2 VIA EMAIL&MAIL: sbajalski tz chnickerson cam W.Stan Bujalsk,Executive Vice President 2 C.H,'Nickerson&Company,Inc. 49 Hayden Hill Road Torrington,.CT 067-90- RE Job.41475—South WR indsor WPCF,.South Windsor,CT Proposal#102- Dear Mr.Bujalski: In accordance with the field change order signed by your authorized representative-, Jeff Lavoie,the contract should be modified to include the following revision: Labor and'material to.add two(2)DI points:for pressure switches for the sodium hypo pumps. Material $ 45-9.00 Labor 7.15.00 Oyerheati&Profits ...z.00. Subtotal $p55.00 Bond 19.00 Total $1,374,00 This.additional work will-require one;(1)day added to the-:eompletion date. -Please issue..-a-writtsrn change order as th&.wlrk above has bcen completed. The.costs inOuded in this field change do not Yriclude and amounts.for eXtended:co.t ldt duration,overtime,ehanges-'to the sequeuee of work., acceleration,-disruptions,interference and/or impact costs,:and the right is.expressly reserved to- recover for any and:al1 of these related items of cost prior to any final settlement of this-contract. The working relationship between your company and ours shall be in accordance with aA appropriate AIAA-contract or other mutually agreed to contract form, CoiporateHeadquarters: Licems: Regional UPBces; 116 Hopping Brink Rbad NA A8999 296 Cahaba Valley Parhway 2501 Blue Ridge Rond 1.9%Evergreea Blvd Holliaon,MA 01746 NI-1 4233M Pelham AL 35124 suite G•100 Suka-300 VT FIM1.303 Raleigh,-NC 27607 Duluth,GA 30096 CT ELC.4123697-E1 AL License 16318 NC License 16529U GALicense EN213065 Phone: (..W)429-8830 :R1 ACA03520 Phone: (205)733-8848 Phone: (919)782-47'?0 Phone: (678)417-9371 Fax= (508)429-7825 ?v1E. MC 0017598 Fax: (205)733-8 97 Fax; (919)782-0724 FaX: (678)417-9373 Mr.Stanley-Bujalski January 9,201� Page 2 Wayne J:Griffin Electric,Inc..reserves the right-to void this proposal after thirty(30) days froiin the above date. Very truly yours,. 'VJ ixNE J.GRIFFIN ELECTRIC,INC. L . Pantan. Senior Project Manager LP/dpe- ACIG40WLEDGMENT The contract modification stated for-the above field change is-acceptable for:the-work.-already. performed. The.-value.of the work:completed to the date of the next requisition may be-billed on.-ftt.requisition. Date: Authorized Signature: sec: Martin Egan,.Project Foreman,Wayne J..Griffin Electric,.Inc. CCN# PS FOR SODHI.M HYPO PUMP Wayne J.Griffin Electric, lnc. Project Name: South Windsor WPCF 4181-10 in Brook Road Project Number, 1475 Holliston,MA 01746 Page Number. 1 Telephone:608429-8830 CH Nickerson IiVork Descrip8on We reserve the right to correct this quote for errors and omissions. Thia:gwto.00vers direct costs onlyand we reservethe rightto daim forknpact and conaequertial costs. Tfils priceis good for.accaeptance aAthin 7e days.fwm the da%of receipt. 'Wewill sepptyandinstall atf.mwedaW,tabar,and equipov"as perycur instructions to provide two DI points'for preasure svwtches for the sodium.hypo pumps-. fterniied:Breakdown Description Qty Net Price U Total Mat($) Labor U Total Hours 3/0 1!2'REDUCING BUSHING 2 546.60 C 1C 93 0.00 C 0.00 3f4"PVC:CTD GRC 20 627.40 C 125:48 0:00 C 0.00 3140 PVC CTD GRC CPLG 4 598:88 C 23.96 0.00 C 0.00 3/4"PVC t:"f D x 1 82.50 E 82.50 0:00 E 0.00 VW PVC CTD 90 DEG ELBOW 2 2,078.19 C 41.56 0.00 C 0.00 3/4"PVG.GTD STRUT STRAP 3 439,79 C 13.10 0.00 C 6.00 11;e-LT FLEX 10 265.00 C 26.:50 0.00 C 0.00 1I2'LT 9T- RAi.GHT CONN 4 38t3.54 C 18.46 0:00 C 0.00 #14 TkiHK BLACK 500 236.06 M" 118.43 0:00 M 0.00 Labor Only 10 0.00 E 0:00 1.00 E 10.00 Totals 458.01 10.00 Summary .General Materials 450.01 Material Total 468.01. Electrician (1.0.00.We @$71.50)- 715 00 -Subtotal 1,173.01 Overhead ( 10:000 Q*) 117.30 Prorit (r 5.060%) 64.52 Bond. Final.Amount $1;373.80 F WAYNE J.•rR•IFFIN ELECTRIC, INC. WORK AUTHORIZAMON DATE: 116 HOPPING B:ROQK,.RUAD .aaiDADotaEss NuMSM AlAS CHECK ONE: , HO.LLI.STON,MA.01.746 P.AOE t of ! �i�n AIAL TEL:50,842-9-8830 FAX:.508.4 47$4 ,� .d L`'f 0 DM .rls WORK /� f � / � /� ,/ OTHER dtJ.^srC1MER'NAiAE 7.-. . G iC,/ 7DJJ DESC UMON.MWO l-oks��vut- f:1.' t- c3c,hae, D Jl+'1 f � PLEASE SPECIFY All ( A STREET n) �J�.f+ u�t(1i1 fir A ;4",r S&V MsTolmsR ORY &ilA1 PACHASEbROM9 PRE-IlVO1 K AUTHORIZATION: DATE. Avr MIZEOMnuTURa YOU ARE F3EfiE9Y AUTHOTIIZEDTD PERFORMTH@ AR OE ADDITiO ;WQRK:UNDER'TMII SA AE:{AN.RI )1[3#1S S{?gQjf iFD iN THE ORIGINAL CONTRACT PROPOSAL UNLES$MERWISE STIPULATED MATERIAL AND LASOR BF0KDOWN: QUANTITY 'MATERIAL MATERIAL .f�/Q' yJ V� AA �1,I,7f•!i�it3�t�FE{;r •id::,�t" >ii �fla::i., fTw ' L%� :[ ii3�li,tet::I�y�li�Ijt�)}�•.f�1;4'i'i'1.� �•��i'' ;,.2'Sifl': s11i.<t:1.1i.,i1:'�i`�s`ii'n:i3�•'fu.Ier;•. 3j Svc _._..._... .::�: .,r (/<- 90 ' 3� �f BUG . � � _� �,�... arc;.. .:��N!�J�. • TIME AND LABOR•REC.ORD:• �q WORKER. BATE IN OUT IN OUT KOII% WORKER DATE IN OUT IN OUT HOURS AUYHE>fi12EDs1GNATUAE C..DLVt DATE: ! G✓ White-Accounting YbUbw-Client Pink-Pio'of Mana'er Gold-Forclhfan The labor and materials listed aboaa ars a rate:and.the vrork was oC Ieted sa sbdoril CDM= Smith ,South Windsor Field Office 1 Vibert Road South Windsor, Connecticut 06074 Tel: 860-282-0123 Fax: 860-291-8795 To: Stanley R. Bujalski, PE Project Manager From: Stephen Kasle _ Site Construction Ma ger Date: January 14, 2012 Subject: Town of South Windsor Connecticut WPCF Upgrade Contract No. C-503 PCO No. 175 High Pressure Discharge Switches SITYP Pumps Control Building Stanley, We have received your Proposed Change Order No. 175 dated January 9, 2012, regarding the additional cost of$1,457.13 for wiring the high pressure discharge switches at the SITYP pumps in the Control Bldg on a time and material basis and find the cost acceptable. This amount, $1,457.00(rounded down)will be included in a forthcoming Change Order for the Owners signature. If you have any questions, please contact us. Cc: Fred Shaw Town of South Windsor Tom Joyce CDM Smith PCO Field File SW WPCF PCO No.175 Hi Pressure Switch Response Memo 1 14 12.doc PCO No . 176 C��i I"S a n PROPOSED CHANGE ORDER No. 40176 GENERAL CONTRACTORS TITLE: Glass Replacement @ Control Bid. DATE:1/9/2012 PROJECT:South Windsor WPCF Upgrade JOB: 500-422 TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:l Camp Dresser&McKee,Inc. Jefferson Mill 670 N Commercial Street Manchester,NH 03101 Phone: 603-222-8345 Fax:603-628-7675 RE: Issue: FF264 bESCRIPTION'OYOROPOSAL ' This revised Proposed Change Order is for the additional cost to furnish and install six 0freplacement galas at the existing window frames in the Control Bld.per field request. tem Des&iption. ::.. uaidty units Unit Price• Net-Ainount 00001 Area Glass&Mirror Co.Quotation dated 1/9/12 1.000 LS $4,783.70 $4,783.70 00002 5%Overhead&Pn et on subcontractor work 1.000 LS $239.19 $239.19 00003 Cleanup Laborer(Inc].O&P) 1.000 HR $8050 $80.50 00004 Bond Cost 1.000 Ls $51.03 $51.03 The foregoing proposal includes direct labor and material costs only. Unit Cost: $5,154.42 Because this change order may affect the performance of our contract work, C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00 such impact costs which may result and to request an extension of time Lamp Sure: $0.00 if necessary when these items can be assessed. This proposal is valid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00 to change for any price increases which may apply Total: $51154.42 APPROVAL: By: By: • Thomas A. Joyce,P.E. ley R ujalski,PE Date: Date: 1/9/2012 cc: FF264 Field Office C.H.Nickerson+Co.,Inc.-49 Hayden Hill Road-PO Sax 808 -Torrington,CT 06790-0808 Phone: 860-489-0455-Fax: 860.496-0483-PLM.0204803-Pt-SHM.005805-SM1-AA/E0E FROM MACSATA PHONE NO. : 91045B73B3 Jan. 09 2012 05:01PM Pt RECEIVED C.H. NICKERSON & CO., INC. op .A= GLus & o "-r,';0m�,%wslY 2U Rivv chive JAN 0 20i2 "COrc►ugt�+ .CT 06790 BCN EJ JHM ❑ ❑ GAW ❑ AM 0 SRB El SJE Proorte: (W)489-0611 DES 0GC ❑ GEM ❑ MJR El Fcz 4 fEru¢)� -00 n KOH ❑ AP ❑ JTR d GMC❑ £mnt� �+r+tsli�r+ +dF ❑ ❑ ❑ i/Q 9/12 NAMI � 4 103 NUMBER -"hO.M rn�h�yW��w.w�!' �..N-wMMM�11Y'Mn.M..i-..J..yr rwrYMM�r J 500-422 Nickerson Windsor WWTP ,., i ATTIJ Stan xE3f:'4 LN 'Y COST TOTAL 1 (7) TemperOS safety glans replac*Ments ' installed in existing exterior aluminum frame Glazing tape settings s t with silicone Sealant t ! stagging required weather permitting 4,783.70 for the sua of f yN,. YM. CCDM- Smith South Windsor Field Office 1 Vibert Road South Windsor, Connecticut 06074 Tel: 860-282-0123 Fax: 860-291-8795 To: Stanley R. BujalValger ki PE Project Manage - From: Stephen KasleSite Constructio Date: January 13, 2012 Subject: Town of South Windsor Connecticut WPCF Upgrade Contract No. C-503 PCO No. 176 Glass Replacement Control Building Stanley, We have received your Proposed Change Order No. 176 dated January 9, 2012, regarding the additional cost of$5,154.42 for the replacement glass at the south and west elevations of the Control Bldg. and offer the-following comment: Based on a further review of the contract documents, replacement glass is required on the south elevation of the Control Bldg per A-CB-3. Based on this, we only require replacement glass on 4 window sections of the west elevation. Please see the revised attached cost summary sheet based on our discussions The.revised amount, $2,983.00(rounded up)will be included in a forthcoming Change Order for the Owners signature. If you have any questions, please contact us. Cc: Fred Shaw Town of South Windsor Tom Joyce CDM PCO Field File SW WPCF PCO No.176 Glass CB Response Memo 1 1312.doc N Nickerson PROPOSED CHANGE ORDER No. 04176 GENERAL CONTRACTORS TITLE: Glass Replacement @ Control Bid. DATE:1/9/2012 PROJECT:South Windsor WPCF Upgrade JOB: 500-422 TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:I Camp Dresser&McKee,Inc. Jefferson Mill 670 N Commercial Street Manchester,NH 03101 Phone:603-222-8345 Fax:603-628-7675 RE. Issue: FF264 ESC 'IPTION•�OF•I'1tOP09Ai� This revised Proposed Change Order is for the additional cost to furnish and install six 0f replacement galas at the existing window frames in the Control Bid.per field request. Item Des6i3ption uaa6ty Units Uiutt Price Net•Amotint 00001 Area Glass&Mirror Co.Quotation dated 1/9/12 1.000 a .1fl). Vie ,75 tits 00002 5%Overhead&Profit on subcontractor work 1.000 IS —W9:{9- ,..6230! 00003 Cleanup Laborer t7nc1.O&P) 1•000 HP, $80.50 $90.50 ' 00004 Bond Cost 1.000 LS 45"3 -45H3 The foregoing proposal includes direct labor and material costs only. Unit Cost. 5� because this Mange order may affect the perfonnatx�e of our txmUact work, r p C.H.Nickerson+Co.,Mc.reserves the right to seen compensation for any Unit Tax: such Irnpact costs which may result and to request an extension of Gme Lump Sum: . $0.if necessary when these gems can be assessed. This proposal is varid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00 to Mange for any price increases which may apply Total: 4q zi9 APPROVAL: By: By: Z4 , Thomas A.Joyce,P.E. ley R eujalski,PE Date: Date: 1/9/2012 cc: FF264 Field Office C.H.Nickerson+Co.,Inc.-49 Hayden Hill Road-PO Box 808-Torrington,CT 06790-0808 Phone: 860-489.04W-Fax. 860.496-0483-PI.M.0204803-Pi-SHM.005805-SMJ-AA/EOE FROM MACSATA PHONE NO. : 91045Eme3 Jan. 09 2012 05:01PM P1 RECEIVED C.H. NICKERSON & CO., INC. 00 .Area Gim & Mirror VA)m wm JA 20Rivcr Drive 0 9 2012 Toremg; n,CT 06790 BCN ❑ JHM ❑ SRB ❑P�arre: t860J SJE ❑ w«-�--11 E 489-061t GAW❑ AM GC GEM ❑ MMJR El DE1 ❑ GCQfix M KOH ❑ AP ❑ JTR - 11/1&2 ° ❑ ❑ ° 1/09/12 JOB NUNMER NAM 500-422 Nickerson Windsor WWTP iF ATTN6Stan oe COST TOTAL .4 3G 1 SZrTemperes safety glass replacements i Installed in existing ! exterior aluminum frame . Glazing tape settings with silicone sealant stagging required weather permitting � for the Sum of -7 f PCO No . 177 Nickerson REQUEST FOR INFORMATION No.00208 GENERAL CONTRACTORS TITLE: Catch Basin Tops ma'amDATE: 11/17/2010 PROJECT:South Windsor WPCF Upg JOB: 500-422 L I V L5 1"I TO: Attn: Stephen Kasle FEB 14 2011 Camp Dresser&McKee,Inc. 1 Vibert Road &WOMASTARTED: 11/17/2010 South Windsor, CT 06074 %NPMIVICOMPLETED:11/29/2010 SOUTH WINDSOR FIELD OFFICE REQUIRED: 11/24/2010 Field File#153 was recently created to track the request to replace an existing manhole cover in the driveway and the existing curb type catch basin in the headworks island with flat type CL tops and galvanized grates. This was facilitate the new layout of paved areas. These are being tracked on time and materials. There are two additional exisitng catch basin tops; one west of the administration building, curb type, in pretty poor condition and an older style square type at the West of the main gate.Do you want these catch basin tops replaced also with curb type tops,intergrated with the new concrete curbing?All the existing tops were to left in place by the contract documents. Please replace the two catch basin tops in question, one west of the Administration Bldg and the old style flat top at the existing Main Entrance gate. Incorporate with new curbing;perform work on a T&M basis and include with FF-153. Requested By:C H Nick pany Inc. Date: 11/17/2010. Signed: ; Carl R.Johnson RFI No.00208 Field Office C.H.Nickerson+Co.,Inc: - 49 Hayden Hill Road - PO Box 808 -Torrington,CT 06790-0808 Phone: 860489-0455 - Fax: 860496-0483 - PLM.0204803-P1-SHM.005805-SM1-AA/EOE Nickerson PROPOSED CHANGE ORDER No. 00177 GENERAL CONTRACTORS TITLE: Catch Basin Tops DATE:1/9/2012 PROJECT:South Windsor WPCF Upgrade JOB: 500-422 TO: Attn: Thomas A.Joyce,P.E. CONTRACT NO: 1 Camp Dresser&McKee,Inc. Jefferson Mill 670 N Commercial Street Manchester,NH 03101 Phone: 603-222-8345 Fax: 603-628-7675 RE: Issue: FF153 pES.CRIPTION OF FROPOSAL. -This Proposed Change Order is for the additional cost to replace two(2)existing catch basin tops per the Rh'I#208. Item Disci iptinn Quani ity 'Units Unit-Price Net Amount. 00001 Time&Material Authorization Sheet Summary 1.000 LS $1,848.00 $1,848.00 00002 1%Bond Cost 1.000 LS $18.48 $18.48 The foregoing proposal includes direct labor and material costs only. Unit Cost: $1,86b.48 Because this change order may affect the performance of our contract work, C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00 such Impact costs which may result and to request an extension of time Lump Sum: $0.00 if necessary when these Items can be assessed. This proposal is valid for 30 days. After 30 days,this proposal is subject Lamp Tax: $0.00 to change for any price increases which may apply Total: $1,866.48 APPROVAL: By: By: Thomas A.Joyce,P.E. y R Bu' s i, E Date: Date: 1/9/2012 cc: FF153 Field office C.H.Nickerson+Co.,Inc. -49 Hayden Hill Road-PO Box 808-Tordngton,CT 06790-0808 Phone: 860-489-0465 - Fax: 860.496-0483-PI.M.0204803-PI-SHM.005805-SM1-AAIEOE Rmr%0�E�� ADDITIONAL FIELD WORK AUTHORIZA.HOWERSON & CO., NC. C.H.NICKERSON&COMPANY,INC. P.O.BOX 808 NOV 3 0 20113 TORRINGTON,CONNECTICUT 06790 PHONE 489-0455 BCN ❑ JHM CI SRB 0 . JE 1 GAW [I AM ❑ GC 9, ' MJR ❑ DEB L. D?R _I vMC �1 PecEONTRAC - AP ❑ JTR roR NAME �1,, G r i ENE ❑ DATE tZs- to STREET • JOB NAME ''ff • ,, CHN JOB NUMBER cm K WLNbS��� STATE STREET 7 FIELD FILE# CHANGE ORDER N CITY STATE You are hereby authorized to perform the following specifically described additional work: Et Inc',C' u W d CtIE r4r if'. jS t2_ FEs tx-A A--C-o r.v /Z�/-2a a 1g:�r't j 3 <<c 65 4 c.N 4VaT 4t I . ,4.•ua qe'�{-'r-�� �ar�� PgnT'tat. ir.e�k-��, �•sT:.�+�a E QUANTITY UNIT PRICE oTAI_ CA-MO1- ��--1 �-- � • 21 C.,LC. !arc: ��.,.��,- l G� s �''j q�i _ a a 14 tic(Ko ADDITIONAL CHARGE FOR ABOVE WORK IS:$ Payment will be made as follows: Check one (Time Material) (Unit Prices) Above additional work to be perform r s e con . s specified in original contract unless otherwise stipulated. Authorizing Signature Print !S-M Q OWNE REPR ATIvE SIGNATURE) Date 20 G� We hereby agree to furnish labor and materials complete in accordance with the above specifications at above stated price. Authorized Signature Date 20 NOTE:This revision becomes part 01,and in conformance with,the existing contract. Arrow Concrete Products,Inc. 560 Salmon Brook Street INVOICE 1059428 Granby,CT 06035 Invoice Date: 11110/2010 Phone:(860)653-5063 Fax:(860)653-0267 CUSTOMER Sold to: 23026 Job Number: M13303 NICKERSON,C H&COMPANY Ship to: SOUTH WINDSOR,WATER POLLUTION FACILIT 49 HAYDEN HILL ROAD P O BOX 808 TORRINGTON,CT 06790 SOUTH WINDSOR,CT 111 MIO COREY 11602 2(15M 1 AM2131746 WA 105�428 CAY Unit Item Description Weight Unit Price TX Extension Structure: 110810 2 EA CBTCLG TYPE"CL"FLAT CB TOP-GALV. 2,640 $371.00 ❑ $742.00 Structure Total $742.00 ---••-----...---•-•...........................•----•--. .................. ...................................................................... Total Weight 2,640 ............................................... ..................................................... --.........•-----.....-•-••-•-- ................ Taxable $0.00 For your convenience we are now accepting%W,MasterCard,AMEX,and Non Taxable $742.00 Discover. Please call for more information. Sub Total $742.00 Tax $0.00 invoice Total $742.00 Less Deposit $0.00 Invoice Balance $742.00 22�discount available per above terms $14.84 RECEIVED C.H. NICKERSON & CZSJE ; NOV 15 2010 BCN O JHM ElSRBO � GAW ❑ AM O GC [3 GEM ❑ tiIJR (] DES @ DBR ❑ GMG 13 KOH p AP ❑ JTR ❑ O 0 ❑ C CONDMONSOFSALE Payment term"specified on the fare of the invoice. Late payment is subject io a finance ,,ww a of 1.3%per man&(an annual percentage rate of I8%). In case of non-payment,cost of collection Including reasonable attomeys fees will be charged No badrehaWs or retainage will be acoepted without prior written approval. CDFA- Smith South Windsor Field Office 1 Vibert Road South Windsor, Connecticut 06074 Tel: 860-282-0123 Fax: 860-291-8795 To: Stanley R. Bujalski, PE Project Manager . From: Stephen Kasle Site Construction Ma ager Date: January 14, 2012 Subject: Town of South Windsor Connecticut WPCF Upgrade Contract No. C-503 PCO No. 177 Replace Catch Basin Tops Site Stanley, We have received your Proposed Change Order No. 177 dated January 9, 2012, regarding the additional cost of$1,866.48 for replacement of two flat top catch basin tops in the west entrance area on a time and material basis and find the cost acceptable. This amount, $1,866.00(rounded down)will be included in a forthcoming Change Order for the Owners signature. If you have any questions, please contact us. Cc: Fred Shaw Town of South Windsor Tom Joyce CDM Smith PCO Field File SW WPCF PCO No.177 Replace Catch Basin Tops Response Memo 1 1412.doc PCO No . 178 com Memorandum To: Steve Kasle From: Andrea Adams/MatthewAshe Date: October 25, 2011 Subject. South Windsor Water Pollution Control Facility:Loading Docks Introduction On October 11,2011,the condition of three loading docks at the South Windsor Water Pollution Control Facility was assessed. One loading dock is located along the east side of the Headworks Building-and two loading docks are located at the Control Building, one on the east side and the other on the west side. The reinforced concrete loading dock at the Headworks Building was constructed around 1980 and is approximately 24 feet by 4 feet in plan. The concrete slab is of cantilevered construction and has a thickness of 8 inches at the face of the wall tapering to 4 inches at the edge. The two reinforced concrete loading docks at the Control Building were constructed around 1966 and are of cantilevered construction. The east loading dock is approximately 46 feet by 4 feet in plan,with a thickness of 8 inches at the face of the wall tapering to 4 inches at the edge. The west loading dock has plan dimensions of 16 feet by 3 foot-8 inches and a tapered slab thickness of 8 inches at the face of the wall to 4 inches at the edge. The loading docks were previously assessed in December 2007. Photographs from that assessment are used in this report as comparison to the present day condition. Visual observations and hammer sounding of the top and underside of the concrete slabs were the means used to determine the condition of the existing loading docks. Several photographs were taken for documentation. Observations Specific areas of deterioration were noted as follows: Headworks Building-East Loading Dock Steve Kasle 10/25/11 Page 2 Top Side of Slab: ■ There was a new 1-ft by 3-ft area of spalled concrete approximately 3-in deep along the edge of the south end of the dock. Within the spall,there were two exposed reinforcing bars with surface rust,approximately 3-ft long. There was a new 2-ft by 1-ft area of hollow sounding concrete adjacent to this spall. ■ Adjacent to the column at line 3,there was a new area of spalled concrete approximately 3-ft by 3-ft by 1 Ya-inches deep. There was an existing spall, 12-in by 8-in by 1-in deep, directly across from the column at line 3 as previously indicated in 2007. ■ Adjacent to the column at line 6,there was an area approximately 3-ft 8-in by 4-ft 6-in by 1 Y2-inches deep (maximum) of spalled,hollow sounding concrete. There was an area within this spall that had been previously repaired;however,the repair was not bonded to the underlying concrete. ■ The north-east corner of the dock had a new spalled area of loose concrete approximately 6-in by 10-in by 2-in deep. ■ There were two new cracks toward the north end of the dock approximately 3-ft apart running in the short direction. One crack was 3-ft long by%-in wide and the other crack was approximately 4-ft long by 1/8-in wide. Both cracks were continuous through the concrete slab to the underside. Under Side of Slab: ■ There were three new areas of spalled concrete,totaling approximately 7 square feet by 1-in deep,located along the east edge of the loading dock. Within these spalls,there were approximately 9 linear feet of exposed reinforcing bars with surface rust. t There were 5 new cracks (approximately 1/8-in wide)totaling approximately 10 linear feet running in the short direction of the slab span. There was a rust stain on the underside of the slab along the crack and efflorescence was visible in all cracks. Control Building-East Loading Dock Top Side of Slab: ■ There were three areas of spalled concrete totaling 4 square feet by 1-in deep located on the top slab. One of the areas, 10 inches by 8 inches in size,was a new spall which developed after the 2007 assessment. Under Side of Slab: ■ There were three new areas of spalled concrete,totaling approximately 5 square feet by 1-in deep,located along the east edge of the loading dock. Within these spalls,there were approximately 9 linear feet of exposed reinforcing bars with surface rust. ■ There was 1 new crack(approximately 1/8-in wide)totaling approximately 2 linear feet running in the long direction at the east side of the dock. There was a rust stain on the underside of the slab along the crack and efflorescence was visible in all cracks. Steve Kasle 10/25/11 Page 3 ■ The bottom flange of the channel was rusted. Control Building-West Loading Dock Top Side of Slab: ■ No deterioration on the top of the slab. Under Side of Slab: ■ There was one new area of spalled concrete approximately 6-in by 6-in by 1-in deep located 4-ft from the south end of the dock.There were 2 reinforcing bars with surface rust totaling 1 linear foot within the spall. Discussion and Recommendations Headworks Some attempt has been made to repair the loading dock since the inspection in December 2007. These have broken up and the loading dock shows signs of further deterioration. Photographs 1 and 2 were taken of the top side of the loading dock during the first inspection in 2007. The previous repairs and additional spalled concrete areas are visible.in Photographs 3, 4, and S taken in October 2011 at the same location. CDM recommends repairing the top and underside spalls and cracks as follows: 1. Remove the loose,previous repairs down to intact concrete. 2. Remove the spalled concrete as specified. 3. Where reinforcing steel is exposed within the spalled concrete,the reinforcing steel should be cleaned and incorporated into the new repair mortar as specified. 4. Repair the cracks by injecting epoxy adhesive. S. Roughen and clean the substrate concrete as specified. 6. Install new polymer modified repair mortar to restore the concrete members to their original configuration as specified. Application of the anti-skid coating indicated on the architectural drawings will prevent further ingress of moisture and salt,and should stabilize the condition of the loading dock. Control Building Observations of the top side of the East loading dock indicated only one small additional area of deteriorated concrete since the 2007 assessment. Deterioration was not noted in the 2007 assessment on the underside of the dock,however,the recent site inspection indicated a few Steve Kasle 10/25/11 Page 4 areas of spalled concrete. The concrete cracks and spalls noted on the underside of the slab should be repair as stated above. The West loading dock at the Control Building indicated one area of spalled concrete on the underside of the slab. This spall should be repaired as stated above. Photo 1: Headworks Loading Dock-North End(taken in Dec.2007) Steve Kasle Page 5 t. __'��-�^ �;:;;,..�•' to ;`F�I L 1 1 • • 2: Headworks L•ading Dock • • 1 1 Steve Kasle 10/25/11 Page 6 Photograph 3: Headworks Loading Dock-Looking North(taken in Oct.2011) Photograph 4: Headworks Loading Dock-South End(taken in Oct.2011) Steve Kasle 10/25/11 Page 7 Photograph 5: Headworks Loading Dock-South Edge(taken in Oct,2011) CDM South Windsor Field Office 1 Vibert Road South Windsor, Connecticut 06074 Tel: 860-282-0123 Fax: 860-291-8795 To: Stanley R. Bujalski*Manar PE Project Manager From: Stephen Kasle Site Constructio Date: October 24, 2011 Subject: Town of South Windsor Connecticut WPCF Upgrade Contract No C-503 Change Order Request No. 042 Additional Concrete Repair Work Headworks and Control Building Loading Docks Stanley, The Contractor shall furnish the necessary labor, materials and equipment to make the following concrete repairs to the Headworks and Control Building Loading Docks as outlined in the attached field sketches SK-S-17 thru SK-S-20. The Contractor shall furnish'a credit for the original concrete repair work shown on sheet S-HW-1. The additional work required to install the Dock Bumpers and furnish additional railings at the Control Building will be forward to the Contractor in the near future. A specification is included for crack repairs, in which those areas are also identified in the sketches. All work shall be in accordance with the Contract Documents. Please submit your cost proposal by November 01, 2011. If you have any questions, please contact us. Cc: C. Fredrick Shaw Town of South Windsor Tom Joyce CDM COR Field File CDR No.042 Additional Concrete Repair Work @ Loading Docks 10-24-11.doc SECTION 03741 MODIFICATIONS TO EXISTING CONCRETE—CRACK REPAIR PART IGENERAL PART 2 PRODUCTS 2.01 MATERIALS A. Crack Repair Epoxy Adhesive 1. General a. Crack Repair Epoxy Adhesive shall be a two-component; solvent-free,moisture insensitive epoxy resin material suitable for crack grouting by injection or gravity feed. It shall be formulated for the specific size of opening or crack being injected. 2. Material a. Properties of the cured material 1) Compressive Strength(ASTM D695): 10,000 psi minimum at 28 days. 2) Tensile Strength(ASTM D638): 5,300 psi minimum at 14 days. Elongation at Break-2 to 5 percent. 3) Flexural Strength(ASTM D790): Flexural Strength(Modulus of Rupture): 12,000 psi minimum at 14 days(gravity);4,600 psi minimum at 14 days (injection) 4) Shear Strength(ASTM D732): 3,700 psi minimum at 14 days. 5) Water Absorption(ASTM D570-2 hour boil): 1.5 percent maximum at 7 days. 6) Bond Strength(ASTM C882): 2,400 psi at 2 days dry cure;2,000 psi at 14 days moist cure. 7) Effective Shrinkage(ASTM C883): Passes Test. 3. Approved manufacturers include: a. Sika Corporation,Lyndhurst,NJ-Sikadur 35 Hi-Mod LV. I 180644666 03 741-1 10/24/11404Y44 PART 3 EXECUTION 3.01 CRACK REPAIR A. Cracks on horizontal surfaces shall be repaired by gravity feeding crack repair epoxy adhesive into cracks per manufacturer's recommendations. If cracks are less than 1/1 6-in in thickness they shall be pressure injected. B. Cracks on vertical and overhead surfaces shall be repaired by pressure injecting crack repair epoxy adhesive through valves sealed to surface with crack repair epoxy adhesive per manufacturer's recommendations. C. The cracks shall be cleaned by sandblast,water jet or high pressure air to remove loose matter, dirt, laitance,oil,grease or other contaminants.Prior to injection of the crack a surface seal of epoxy paste shall be applied to the face of the crack. Openings in the surface seal(entry ports) shall be established along the crack. The distance between entry ports shall not be greater than the thickness of the slab. Injection shall begin at the first port at one end of the crack.For vertical or inclined cracks this will be the lowest point of the crack.Injection shall continue at the first port until the injected epoxy begins to flow out of the second port in line. The first port shall be plugged and injection started at the second port. The entire crack shall be injected with the same sequence. Continue injecting crack and do not stop until crack is completely injected.After the injected epoxy has cured,remove or cut off ports and grind flush with adjacent concrete surface. There shall be no indentations or protrusions caused by placement of entry ports. D. The Engineer may take random 2-in diameter core samples for visual inspection and strength testing to verify adequacy of repairs. END OF SECTION I 1806-44666 03 741-2 10/24/1144t24 4 PW XM1\Documents\1806\44466\04 Design Services NM_Record104 Structura1110 CADD\SCBPL001.dwg GR\0 IF T NpO 0 a Cam'N"—c==m—PLANT NORTH 0 c y D N �s'-0„ D I I m O / ..{,.ZY ---------------.--- -�'�, C U C� W � 0 Q � o CONCIRETE ALLED REPAIR SPALLE REPAIR SPALLED CONCRETE CONCRETE AT W � 10"x8"x1"D 12 x9 x1 COLUMN BASE I p —I -P z 12"Wx4"H NOTES: po 1. FOR REPAIRS TO UNDERSIDE OF v z � LOADING DOCK SEE SK—S-20. 2. REPAIR SPALLS PER DETAIL ON FIRST FLOOR S—GD-3. NEW STAIR NOSING i PLAN (TYP x 3 STAIRS) z 3. REPAIR CRACKS PER rn c� m SPECIFICATION 03741. 1/4" = 1'-0" r A N --------------------- _71 t 2�ooZ REPAIR 3'-0' LONG Z cP v�C� t x }I;" CRACK w/ o "' c^G� EPDXY ADHESIVE REPAIR 2'-6"x1'-6"x1"D t,. CONCRETE SPALL REPAIR 6" LONG x Y8— CRACK w/ t EPDXY ADHESIVE REPAIR 8" LONG t x )�" CRACK w/ ,I EPDXY ADHESIVE REPAIR REPAIR 3'-0" LONG 2'-0"x10"x1"D CONCRETE SPALI x A" CRACK w t EPDXY ADHESIVE a REPAIR REPAIR 1'-6" LONG 2'-0"x6"xt"D i CONCRETE SPA I x Ya" CRACK w/ o EPDXY ADHESIVE 0 o.. I NOTES: _ t o� 1 FOR REPAIRS R SEE SKTO TOP OF LOADING 2 e' 2. REPAIR SPALLS PER DETAIL ON 8 S—GD-3. - 3. REPAIR CRACKS PER SPECIFICATION d 03741. r--------------------- � t d y 0 8 REFLECTED UNDERSIDE OF LOADING DOCK _ PLANwpcf- DATE OCT 2011 S WIND-OR CT :RFI FIGURE NO. 1/4" = 1'-0" SHEET N0. LOCATIONCDM Cam Dresser S McKea Ina S—HW-2 D—F,1-21 SK—S-18 4 A N i W14x30 i i ------- +ll 0__4) ------ REPAIR co 4 41.x2"xO.5"D S—HW-1 v oZ CONCRETE SPALL (2 LOCS) to a O cP�y�G� REPAIR 12"x8"x1"D o CONCRETE SPALL p� �` REPAIR ✓ FOR DETAIL SEE O SHEET S—GD-3 9'-0" i 4'-6"x3'-0"x 3"D CONCRETE REMOVE LOOSE, 1' 6" '-6" 1 q" PALL DETERIORATED CONC & REPAIR i 2.5"D CONCRETE PALL '/ I rn N O s I 0/2' O dx' j N O 3 + O C7 I N M O A REPAIR = il, 1'-0"x1'-0"x1.5"D CONCRETE SPALL 1 REPAIR 3'-0" LONG o � N i x 0.25"W CRACK I +� w/ EPDXY a d N T ADHESIVE 1. OP OF STEEL EL 43.71 UNLESS REPAIR 4'-0" LONG INDICATED THUSLY t 0'-0") z -------�- -- ---- ----- x 0.25"W CRACK CL 1 TON � 2. FOR REPAIRS TO UNDERSIDE OF MONORAIL W74x30 w/ EPDXY LOADING DOCK SEE SK—S-18. E ADHESIVE REPAIR 10"x6"x2"D (+0'-4") 3. REPAIR SPALLS PER DETAIL ON ONCRETE SPALL S—GD-3. 2 4. REPAIR CRACKS PER SPECIFICATION $ 03741. MONORAIL s-Hw-1 s PLAN WPCF X 1/4" DATE OCT 2011 S WIND SOR CT 1271] FIGURE SHEET NO. LOCATION a cm Cam Dresser A McKee Inc. S—HW-1 A—B,1-2SSK—S-17 i PW XM1\Documents\1806\44466\04 Design Services NM_Record\04 Structural\10 CADD\SCBPL001.dwg ; 19-0 NPD F1 0) C--}'—'N--C'=-PLANT NORTH s v m C y D REPAIR SPALLED 1 fi'-D" CONCRETE I 1'-6"x1'-0"x1.5"D � D m .-- _------...._._._....__...._._.-.T I I ——— O —_._.----.--- O m REPAIR SPALLED i c� ra CONCRETE W Z z 1'-0"x10"x2"D O REPAIR SPALLED CONCRETE o REPAIR 3'-0" LONG 2-0"x6"x1"D o x Y8" CRACK w/ z -1 EPDXY ADHESIVE I --v— REPAIR 2'-0" LONG x Y8" CRACK NOTES: / EPDXY zo X 1. FOR REPAIRS TO TOP OF ADHESIVE :r LOADING DOCK SEE SK-S-19. 2. REPAIR SPALLS PER DETAIL ON REFLECTED UNDERSIDE OF LOADING DOCK S-GD-3. Z o 3. REPAIR CRACKS PER PLAN m SPECIFICATION 03741. 1/4" 0 _ s Nickerson ;cicerson PROPOSED CHANGE ORDER No. 00178 GENERAL CONTRACTORS TITLE: Loading Dock Repairs DATE:1/11/2012 PROJECT:South Windsor WPCF Upgrade JOB: 500-422 TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:1 Camp Dresser&McKee,Inc. Jefferson Mill 670 N Commercial Street Manchester,NH 03101 Phone: 603-222-8345 Fax:603-628-7675 RE: Issue: FF247 _l.?E3CRIP`TTON''(}F>PR.t�POaAL�".:, . �-.�:.:• . ..• . . -. • ..: : This Proposed Change Order is for the additional cost of concrete repair work at the Headworks Building and Control Building Loading Docks per the COR#42A. �teiri DesoiIpflon• ..: ..:;`:.., uaniity Units -Price 'Net Amotinf 00001 Add Try Works crack Injection IA00 LS $1,500.00 $1,500m 00002 5%Overhead&Profit on Subcontractor 1.000 LS $75.00 $75.00 00003 Nickerson Added Work Spreadsheet Summary 1.000 IS $3,880,00 $3,880.00 00004 15%Overhead&Profit on Nickerson Work 1.000 LS $582 00 $592 00 00005 1%Bond Cost 1.000 IS S60.37 $60.37 The foregoing proposal includes direct labor and material costs only. Because this change order may affect the performance of our contract work, Unit Cost- $6,097.37 C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00 such impact costs which may result and to request an extension of time Lump Sum: $0.00 if necessary when these Items can be assessed. This proposal is valid for 30 days. After 30 days,this proposal Is subject Lump Tax: $0.00 to change for any price Increases which may apply Total: $6,097.37 APPROVAL: �r BY: By: Thomas A.Joyce,P.E. ey uja d, E. Dates Date: 1/11/2012 cc: M47 Field Office C.H.Nickerson+Co.,Ina-49 Hayden Hill Road-PO Box 808-Torrington.CT 06790-0808 Phone: 860-489-0455-Fax:860496-0483-,PLM.0204803-Pi-8HM.005805SMI-ANEOE SOUTH WINDSOR WATER POLLUTION CONTROL FACILITY FIELD FILE#247-Loading Dock Repair Work UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY- UNIT PRICE MATERIAL PRICE LABOR COST MATERIAL: Pea Stone Bags 12 Bags $4.85 $58.20 $58.16 Cement 4 Bags $9.79 $39.16 $39.14 Sikatop 122 B 12 Bags $19.03 $228.36 $228.36 Sikatop A Component 12 Gal $26.21 $314.52 $314.52 Angle&Fasteners for Dock Bumpers 1 LS $400.00 $400.00 $400.00 SUB-TOTAL MATERIAL $1,040.24 $1,040.18 EQUIPMENT: Small Tools(3%LABOR) $147A8 $147 48 Demo Saw 8 HR. $20.00 $160.00 $160.00 Pickup Truck 22 HR. $15.00 $330.00 $330.00 Mini Grinder 12 HR. $8.00 $96.00 $96.00 SUB-TOTAL EQUIPMENT $733.48 LABOR: Carpenter Foreman-Dock Bumper instal. 16 HR. $84.00 $1,344.00 $1,344.00 Labor Foreman 4 HR. $70.00 $280.00 $280.00 Laborer 30 HR. $56.00 $1,680.00 $1,680.00 Mason Foreman 2 HR. $95.00 $190.00 $190.00 Mason 18 HR. $79.00 $1,422.00 $1,422.00 SUB-TOTAL LABOR $4,916.00 SUB TOTAL MATERIAL,EQUIPMENT&LABOR $6,689-66 Original Work @ 42%of Total $2,809 66 Additional Work @ 58%of Total $3,880.00 JOB C. H. NICKERSON & CO., INC. sHEETNO' OF TORRINGTON, CT 06790 CALCULATED BY DATE CHECKED BY f� DATE € £ € # € , ! z _...._».r...__-<-...,jj///`,"J.J_!• <'{ -T"-F•••ii ...1L.y...C:i:•_ =..e._ .......... __ _ ._.! '.'1 4="' x •�� i : "'_•- _- __ ........f...... __.t..•.,...... . _` ? _ ..(..._._...`...(„�bj.....«, .. ___._._ .. _ _ 40- • i F - �i .,_„._'-i'---..-a._.........«......_..§ ...___-..6e...�ar�{�{.._..._...«.__....:.._._.?____..�..._.._..«.. .........��X..��Y�..?.°,...xC�..3..—._ ��t.__.jy�, /jb_....,»F7.. .... `r(- .......... t t ( ...._..__S_._._.....e-..._......F.........._3..-_-..._i._....__.:......_..._-._..._...i.... I y..._..._.._.__._.p.__.......s,..__-_"{_. .€....... .....A.r... .« ....i.. .. 1.'�!�•MrF__. _._"• �{ -i•--. •� -•--d... .....b.....«.•...r._.[_ _...E... ....'__ ; # _ ..... ? oil I r < 4� � i , I Q c •//y,€ ? i �3 {{ cko e _._.•-w-.-.-••._. { &.._..._ FJn''•I•1.. .{-i`__«_.._ _ If./]lam] ` _ '�+_/��4G+�£ { r _ -_ .t, s ' : i # ..«-..«.«_i•__... ..__..i•........_.q»........._.£........_..._....._...i-_•-•• _.___ _•__.3...._.._.i___ - ... ` _ .d._.._.._a.«...._.._{.._.._.._.i.._........=s__•-_....e.............;..._......,.5......._............._>..........._»._._... # Yi i hi i FR�f101.1#SIep451£xbJMS•1{PdbA} - . JOB C. H. NICKERSON & CO., INC. SHEET NO. OF TORRINGTON,CT 06790 CALCULATED BY DATE CHECKED BY DATE SCALE ..................... ..................... ...................... ............. ------- ........... .......... 49 ALI� -O-l-----T'-7...;.t... 91 44 ............. .......... ............................................... .................. ..... ..................... .......... .......... - I—-I----- .........4_ i .......... .......... .............. ..... ----- ... ....... r .......... .................... ..f. ........................... .. ..........................................-----.--.--.--.-..-.- ----------- - ....... ...—......-...-..-.. 4 . ... ..... --.--..-.—....... ......... ...................... .... o_op M............... ..... ...........4-_­­_+__j........... .......... ....... t t'KUl•'USHL Yage t or i Dry Works, Inc. Certified WBE-OBE Commonwealth of Massachusetts State of Connecticut p State of Pennsylvania �17 273 Riverside Avenue-2"d Floor—Bristol,Connecticut 06010 Mailing Address: P.O.Box 4070--Bristol,CT 06011-4070 PHONE:(860)682-8486 FAX(8W)640-1052 Mobile Cell: (860) 919-4331—Monica Rourke PROPOSAL SUBMilTI'ED TO: C.H. Nickerson&Co.;Inc. DATE: 11/30/11 STREET: 49 Hayden HUl Road JOB NAME: So Windsor Wafer Pollution Control Facility Upgrade P.Q. Box 808 1 Vibert Road,South Windsor,CT • ' CITY,STATE,ZIP: I Torrington,CT 06790 PHONE: 860.489.0455 I FAX: 110-496-0483 WEh6MYPROPOSErORRATSYMrfRMLANOLABdYQ�INACMRDAA4XW1THVMNCA77tJYYSBELOW,M 77JERMCIF One Thousand,Five Hundred Dollars and no cents DOLLARS $ 1,500.00 PAYMENTS TO BE MADE AS FOLLOWS: Net Thirty 30 Days Work Description: Provide all labor,matenialjnd equipment necessary and incidental thereto to Fill and patch approximately 15Ieet of random cracks as directed by the engineer in various areas of the concrete construction at the South Windsor WPC Facility. and as described herein: Material: Eva Pox Epoxy Paste 22 as approved by Camp-Dresser&McKee on 11/29/2011 2-component,100%solids,moisture-tolerant,high-modulus,high-strwgtic,structural,smooth-paste epoxy adhesive (1) Surface prep area in accordance with manufacturer's recommendations prior to installation; (2) Apply epoxy paste as deep into the crack width as possible and continue application in accordance with product data Y information for Oiling structural cracks; (3) Trowel to a smooth surface, Wuslons: Grooving out existing cracks Amozft=Whoa sal. Signature: The above price and payment terms,spedfications,and conditions Title: are satisfactory and are hereby accepted.You are authorized to do the work as described and mutually approved. Date: Signature: Date; November 30, 2011 Title: President-Owner ADDITIONAL FIELD WORK AUTHORIZATION CAL NICKERSON&COMPANY,INC P.O.BOX 809 TORRINGTON;CONNECTICUT 06790 PIIONE 489-0455 �iRRcroR w1ttE PHOM DATE STta ET MON" f aaiJOe Ea 9 GCY STAN SMEET flEtDfNEf C1IANGEOHDERf CRY sulE You am hereby authorized to perform to k cowing spedwy desaibed ad&Swnal wok tVf//C iZf��hn ty�� s 1��c01, OUANnV umrrpnlm TOTAL AMMONALCY GE payr��t,�mach aEs.taAurtcs:. .ona . _{cane.&Material}..• Xf.►nnJ?�}. . Abow adduional work to be pe u or oo a in original contract vote=otherwise stir Ated. Autit4riiaig.s it 4i not-_ �..._ ban-, .. g612- _EtLwft MM to furnish labor and mrate is Corn a In r its�e. Aethorized Signature 'Date 20 VOTE TWftvkion'bera wpaftof and ktoadwmnoewfth,theads&gmakut ADDITIONAL FIELD WORK AUTHORIZATION C.M.NICKERSON&COMPANY,INC P.O.Box 808 TORRINGTON;CONNECTICUT 06790 PHONE 480-0455 �TORwiME MOW BATE "I MY STATE STAteer , l��tlfFTLE1 Cl1M1GEORDC4t1 pnr STATE You are hereby authodud to PO tarm the WQwkQ specKc*described s"tionai wo& • t.A+�l�G�C� t7�G't�- iZ.E�i4i 2 u9c�f�k. (oitl?�D� WANitTY tttt etiu Torat r• came j;z 4. r 7+ 49- hag AD giARG9f9fL Qy9 EQj3 . .�._ _ e$yit�!ki�it�tlirti�asiQt .tAna . ;(t'+mae.�.htat�iag.•- �t7nitP.�Scesj . Above ad2ionat work to be co ns speataed in octginat ocntract unless ottuawise stipsdated. . s rnEsttvvATTstq 1 ._...._...20 we to turd$h tabor and matwiats comMeln augoted Signature Vat$ 80 NOTrc TnlcAe�ision•6ecomes part ot..na In oadormt,xe wit,.d+a�tSGnp oonKaa. • 1 HARRIS illlil 1• 1:: 4 11 i .M :i 11 1 d1 1 { 1 t Itl 11I EMTw- • r 11 r r T�:,"`±r ,-'.,,E 'e e \. r(,c t-'e - • '.�!` '�a 1 --r 1. e..o a e z-.i r • e . 6 e +TSG �,m'k" cast ZY,.e_. _ ''" �.k� {`y2»m •y-.ram.. <L.S, .R, .nC.e�'�9 .�1f. 12 12 24 alr sf .iZY�lkwF�'r-'�`3'4 yr stj� IVED • co SRB Gc,_.r.�?k• Vej» ,+-r ■ r '?1'`F�... ,� - . in � • Z • KK M tL2' ,E wv TR w�a'� � Vi "'t.i9.Z� Y `"� f�;L.,(. -_ y�{} ".V'+•�'v�"'a 1 PAY YOUR BILL ONLINE AT HTTP:I/WWW.AHHARRIS.COM VIA CREDIT CARD OR CHECK. MAILED PAYMENTS BY CHECK SHOULD BE A.H.HARRIS&SONS,INC, P.O.BOX 418827,BOSTON,MA t 8827 111 111 - WARE-HOUSE TRANSFER AM (� (( P.O.Sox 418827 I-{ l,ti,l WLA.IO Boston,MA 02241-8827 ' . ! `21 ( Amhm 218435-00 1 . 11/07/11 1 4 cusr�:245200 Date and Time printed- 11/07/11 14:49 pt E ooRRE vwotr,�cEro. A.N. Harris & Sons, Inc. V BILL TO. CH NICKERSON & CO INC M010 Newington Nil � PO BOX 808.. 91 Holmes Rd TORRINGTON, CT 06790 Newington, CT 06111-1833 (860)665.9400 srmlpm- CH NICKERSON & CO INC WATER POLLUTION CONTROL FACILI M016 New Haven OLD ACCT#988200 1 VIBERT ROAD SOUTH WINDSOR. CT 06074 z Oar Truck I il/07/11 I I NET 30 t� ::r.:•a:•::•:•::::.::•:::::::�:. �.. � 3 ....,... .....:............. : I`:.(Y3.fx.I#d1:# '•Q1d .•::::: (yIy:dti;:::`lxslr P0. JEtF•:::•:::•. ::..:• �••. _ {i$f 3 7a 018 0 7 ::..1::...r;:::..;. .......rr.�-�..•......•....'....•....................:.........:.:.:.........................�....: . 10 ' 2::2 ... ..... ...... ........... ...:.... ...... ":':::::.... ;22/DJC:: 0 189-5 ao ; : :; : :: :. : 7 -�:. LDS.. H :B11�~i)N �••�4�.`�• �L� 1 0 756 ................................. ....... ......... .......... .. ...............::::::. ... .. ..... ..... ';. ...... :ti:^ :.R .........•....':t.IJ:::.. (fw� V .'.: :'.- i % .':r ............. ....... ... �.r•:. r :iiti'!tii i :t1.. ::li• ..ti f{[ i I - • . ... . ..... . .......... •:.A:.: :.................:.:::::.:• ... :•......:....... 3 E fp ;T F t F ' :4T ;. a _ WeifPicker Last P ' j.': yyp. ........ . ... Date .... •' •.::::::.........................:...- :;s�3;a ;� Weight i �`�ta��Q .� NINE' F ,Notwiahsta"rig anydifferentor addttIonal terms itkvtmay he contained in yourorde,your 91 oller is accepted only on the express condition that you assent to the terms all candiCons contaited on-dtts pegs and on fhe reverse side hereof.s ect to i t/2%per month lade charge if not paid within terms.Wterchandise cannot be returned without •, , , ao r Ott wA 1„h u d nn mit crn,nt nnnrs kisoecdon and wttt be subject to a restocking charge. �k MOICE SUPERIOR PRODUCTS DISTRIBUTORS, INC. rriaiwr��nw■mw��...�.�� 'MV1/OICEpATE It•1VOtCE PRJAABER ..,and the SUPERIOR family of companies ■Superior Equipment&Supplies ■Superior Hearth,Spas&Leisure 11/0.9/11 S2115015.001 ■Superior Instrument r ConQuip Technologies ■Superior northeast ■Energy Resource by Superior PLEASE REMIT TO; PAGE NO ■.Superior east ■Plasticrete Superior Products 1403 Meriden-Waterbury Road,P.0.Sox 57,Milidale,CT 06467 P O. Box 57 1 (860)621 3621 (800)937-7734 Fax(860)621-1922 MBldale, CT 06467-0057 WWW SuperforMetwork.com ' pfo � °�uerrorheast BILL. TO: SHIP T0: C. H. NICKERSON & CO. , INC. C. H. NICKERSON & CO. , INC. P. O. BOX 808 P. O. BOX 808 TORRINGTON, CT 06790 TORRINGTON, CT 06790 CUSMWR ORDER 6MMM ORDERED BY .1OF1 REFERENCE 500-422 SOUTH WINDSOR WPC ORDER TAKEN BY SHIP VIA SIGNED FOR BY ORDER DATE SHIP DATE EOFOR PICKUP AT SNE KIM 11/09/11 11/09/11 SHIP QTY DESCRIPTION DISC NET uNTC PRICE Ng AH MIT 12 bg PROMASONRY PEA STONE (60#/BAG) 4.•847 58.16 t. 4 bg TYPE I--II CEMENT (LEHIGH) 9.786 39.14 a:. E( LD C.H.. NICKEJ ZSCIN & Co.,liNC. 1 28 011 BCN Q. Jhi1Vl C) RB • SJE GAW [ AM El p/GEM 0 KOH El APB ❑ R Q" GMC❑ El `� 0 O Q 0 SubtOtal. 97.30 1.54F per month late Charge. All Claims for errors must be wade within Shipping 0.00 I returns for credit must be authorized in advance and are subject to Simi ShippHandling z Stems are fiat returnable for credit. SPDI will not accept unilateral claims 0.00 ces. Product warranties are limited to those provided by the manufacturer. Sales Tax 0.00 Implied, in connection'with this sale. WWI explicitly disclaims any SS FOR A PARTICULAR PURrosB, and under no Circumstances will it accept :Sea. In the event that legal action is required to-effect collection, Amount Due 97.30 lection including reasonable attorneys fees. 1 3 i si Southington South Windsor ■ Norwich ■ Cheshire Avon • r •wi. DELI VERY TICK f' ; SUPERIOR NORTHEAST Order Ot SR1i5015.+t0-1 24 J'EFFREY DRIVE e # SOUTH W I NDSOR, CT 06074 Printed: 08.1 i :37 09 NOV 860--28E-7688 Fax 660-282-7698 page # t I of i # Sold To; atrip To ' C. H. NICKERSC3N & CO. , INC. C. H. NICKERSON INC-. P. O. SOX SOP, O, BQK 80h, CO.', } 'TORRINGTON, CT 06790 TORRINGTON, CTa067.96 �• Phone; 860-•489-0455 J S � � ILI. A a• S 4 •�� ti t "S (7 dere�f By OrOwr hate Ship at's Ship Via Order, Taken $ 1�` i1J�l9/'II 11/09/11 PICKUP AT 3NE GEORGE FORTIN • •�. - r .t'at4 ,fob Reference Alt; Tel Alt Tel :De-livery Cbmmit��nt SOUTH. WINDSOR -WPC -ordered Shipped product Discx•iptiun 12•.bg' is PROMPSONRY "FEA STOh#E. (fart#/BAG) 4 bg 4 TYPE I-II CEMENT (L.EHI(*+) Ke ,r E•t t of e r Signature-. ' .. ...J ' a s ignature. fgned for• 'iV: KIM ,.': ;... ,� ....•:..„ ,,:,�..... � , deceived in -g-oad condition. All. c"4aims far shoe"cages yr er^r errs must.� fWith-ih 48 hours of receipt of mater*xal. All. returns for credit must b , aut-horizod -in, advance.. a' are subj' t to berrtrpany Returned Goads Policy. toad' 'By C4 Check By Privets Prive14 Arri ved'at .Job Time Glut' 7-- CDM ith South Windsor Field Office 1 Vibert Road South Windsor, Connecticut 06074 Tel: 860-282-0123 Fax: 860-291-8795 To: Stanley R. Bujalski, PE Project Manager From: Stephen Kasle - G� Site Construction Ma ager Date: January 16, 2012 Subject: Town of South Windsor Connecticut WPCF Upgrade Contract No: C-503 PCO No. 178 Structural Repairs to Loading Docks Headworks and Control Building Stanley, We have received your Proposed Change Order No. 178 dated January 11, 2012, regarding the additional cost of$6,097.37 for structural repairs to the concrete Loading Docks at the Headworks and Control Bldg on a time and material basis and find the cost acceptable. This amount, $6,097.00(rounded down)will be included in a forthcoming Change Order for the Owners signature. If you have any questions, please contact us. Cc: Fred Shaw Town of South Windsor Tom Joyce CDM Smith PCO Field File SW WPCF PCO No.178 Loading Dock Repairs Response Memo 1 1612.doc