CHANGE ORDER
No. 26
Project: South Windsor WPCF Upgrade Date of Issuance: January 18,2012
Owner: Town of South Windsor
Contractor: C.H.Nickerson&Co. Inc. Project No.: Contract C-503
Duration: 900 days Engineer: Camp Dresser&McKee, Inc.
Eng's Project No. 1806
You are directed to make the following changes in the Contract Documents.
Description: See Attached Documentation
Purpose of Change Order: See Attached Documentation
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME
Original Contract Price Original Contract Time
$ 30,503,739.00 Final Completion: 900 days
(days or date)
Previous Change Orders Net change from previous Change Orders
$ 889,884.00 0
(days)
Contract Price prior to this Change Order Contract Time prior to this Change Order
$ 31,393,623.00 Final Completion: 900 days
(days or date)
Net Increase of this Change Order Net Increase this Change Order
$ 18,084.00 87
(days)
Contract Price with all approved Change Orders Contract Time with all Change Orders
$ 31,411,717.00 Final Completion: 987 days
(days or date)
This document will become a supplement to the CONTRACT and all provisions will apply hereto.
Stipulated price includes all costs associated with the above described change. Contractor and Owner
agree that the price(s)stated above are equitable and acceptable to both parties.
RECO APPROVE AP O
By: ?. E i By: By: -
nginee ownef nt actor
lZ, I
Date bate Date
Change Order 26
Town of South Windsor
Water Pollution Control Facility Upgrade
Contract C-503
Description of Change
PCO No. 172 Railing In-fills at Anoxic Tanks
The Contractor shall provide all necessary labor, materials and equipment
to install new aluminum railings at the locations where the former Aerator
Mixer bridges were removed at the Anoxic Tanks.
PCO No. 174 Low Flow Air Switch
The Contractor shall provide all necessary labor, materials and equipment
to install conduit and wiring for the Odor Control system low flow air
switch on a time and material basis.
PCO No. 175 SITYP High Pressure Switches
The Contractor shall provide all necessary labor, materials and equipment
to install conduit and wiring for the SITYP pump high pressure discharge
switches on a time and material basis.
PCO No. 176 Glass Replacement at Control Building
The Contractor shall provide all necessary labor,materials and equipment
to install various new sections of window glass at the west elevation
windows in the Control Building.
PCO No. 177 Replace Catch Basin Tops
The Contractor shall provide all necessary labor materials and equipment
to furnish and install two new flat top catch basin tops at the west gate
entrance.
r
PCO No. 178 Loading Dock Structural Repairs
The Contractor shall provide all necessary labor, materials and equipment
to perform structural repairs to the concrete Loading Docks at the
Headworks and Control Bldg.
Reason for the Change
PCO No. 172 Railing In-fills at Anoxic Tanks
PCO No. 156 required removal of 2 existing walkway bridges for the
former Mechanical Aerators (of the old Aeration Tanks)which were not
designated for demolition. In addition,per the original contract documents
the two northern walkway bridges were designated for demolition by the
Contractor. The documents made no provisions to furnish new in-fill
railing sections at these four locations. The cost presented herein
represents the cost to furnish and install various sections of 2 line
aluminum railings at these locations at the Anoxic Tanks which were the
converted Aeration Tanks.
PCO No. 174 Low Flow Air Switch
RFI No. 278 was presented to the Engineer requesting direction on the
electrical wiring required for the low flow air switch on the Odor Control
fans. Contract documents did not make provisions for this wiring. The
cost presented herein represents the time and materials required to furnish
conduit and wiring for the Odor Control system low flow air switch.
PCO No. 175 SITYP High Pressure Switches
RFI No. 275 was presented to the Engineer requesting direction on the
SITYP pump manufacturers discharge high pressure switch for each pump.
Contract documents did not make provisions for this conduit and wiring for
the switch which was provided by the manufacturer. The cost presented
herein, represents the time and material required to furnish conduit and
wiring to provide a high pressure discharge alarm for each SITYP pump.
PCO No. 176 Glass Replacement at Control Building
The former laboratory was located on the first floor of the Control Building
in the northwest corner. The upper west window elevation had contained
. f
i
panes which did not have glass in them due to renovation work previous to
this contract. Architectural drawings did not call for installation of new
glass sections where pieces of plywood were currently installed. The
Contractor was requested to provide a cost estimate to install four new
glass sections at the west window elevation of the Control Building.
PCO No. 177 Replace two Catch Basin Tops
During reconstruction of an existing storm catch basin and repair of an
existing 12" storm pipe at the west entrance gate,the Contractor submitted
RFI No. 208 inquiring on the disposition of two existing catch basin tops
west of the Administration Bldg and in the center of the entrance. The
Owner directed the Contractor to replace the two existing catch basin tops.
This was performed on a time and material basis and the costs are
presented herein.
PCO No. 178 Structural Repairs to Loading Docks
Contract documents indicated to make minor structural repairs to the two
concrete Loading Docks at the Headworks and Control Bldg. The Owner
requested complete removal and replacement of these concrete docks.
CDM Smith Structural Engineers visited the site in October and prepared a
report on the condition of both docks. Their report did not warrant full
replacement of the structures,however due to the time elapse between
original design and construction, additional repair work and crack injection
was required. The Contractor was directed to perform the additional
repairs on a time and material basis. The overall total cost includes a credit
for the original repair work which was included in the Contractor lump
sum bid.
Attachments (List Supporting Documentation)
PCO No. 172 Railing In-fills at Anoxic Tanks
Reference CHN RFI No. 270 dated 9-29-11
Reference CHN PCO No. 172 dated 1-03-12
Reference CDM approval letter dated 1-18-12
PCO No. 174 Plant Water System Revisions
Reference CHN RFI No. 278 dated 11-17-11
Reference CHN PCO No. 174 dated 1-9-12
Reference CDM approval letter dated 1-14-12
y
PCO No. 175 SITYP High Pressure Switches
Reference CHN RFI No. 275 dated 10-18-11
Reference CHN PCO No. 175 dated 1-09-12
Reference CDM approval memo dated 1-14-12
PCO No. 176 Glass Replacement at Control Building
Reference CHN PCO No. 176 dated 1-09-12
Reference CDM approval letter dated 1-14-12
PCO No. 177 Replace two Catch Basin Tops
Reference CHN RE No. 208 dated 11-17-10
Reference CHN PCO No. 177 dated 1-09-12
Reference CDM approval letter dated 1-14-12
PCO No. 178 Structural Repairs to Loading Docks
Reference CDM memo dated 10-25-11
Reference CDM COR No. 042 dated 10-24-11
Reference CHN PCO No. 178 dated 1-11-12
Reference CDM approval letter dated 1-16-12
Summary of Costs
PCO No.172 Railing In-Fills $3,857.00
PCO No.174 Low Flow Switch $1,824.00
PCO No.175 High Pressure Switches $1,457.00
PCO No.176 Replacement Glass $2,983.00
PCO No.177 Replace CB Tops $1,866.00
PCO No.178 Repairs to Loading Docks $6,097.00
Total Cost $18,084.00
PCO No . 172
Page 1 of 1
From: Joyce,Thomas
Sent: Wednesday, October 05, 20119:59 PM
To: Stan Bujalski
Cc: Lawson, Deborah; Kasle,Stephen
Subject: Response to RFI#270-Anoxic Tank Railing Openings
Yes,fill in gaps at all locations with 42"two post rail systems.And the other gaps.
From: Stan Bujalski [mailto:sbujaiski@chnickerson.com]
Sent: Thursday, September 29, 2011 1:55 PM
To: Joyce, Thomas
Cc: Kasle, Stephen; Shaw, Fred; Jeff Lavoie;Jonathan Miller Jr.
Subject: RFI #270 -Anoxic Tank Railing Openings
Tom,
RFI#270:
Existing railing to be left in place at the Anoxic Tank has openings where the existing equipment bridges were
removed. Please clarify if you wish to have these openings addressed for safety concerns.
Stanley T. Bujalski, TM
Executive Vice President
C. H. Nickerson & Company, Inc.
Torrington, CT
860489-0455
860496-0483-Fax
www.chnickerson.com
AA/EOE
file://CADocuments and Settings\kaslesd\My Documents\South Windsor Folders\SW RFT's... 1/14/9019
Nickerson PROPOSED CHANGE ORDER
No. 00172
GENERAL CONTRACTORS
TITLE: Railing Openings @ Anoxic Tank DATE: 1/3/2012
PROJECT:South Windsor WPCF Upgrade JOB: 500-422
TO: Attn: Thomas A.Joyce,P.E. CONTRACT NO: 1
Camp Dresser&McKee,Inc.
Jefferson Mill
670 N Commercial Street
Manchester,NH 03101
Phone: 603-222-8345 Fax: 603-628-7675
RE: Issue: FF240
AESCRY:P3'ION=::QI?`•PROPUSAL : . : ::-;;-`; . :. .. .
This Proposed Change Order is for the additional cost to furnish and install aluminum railing at various openings in existing railing at
the Anoxic Tank per the RFl#270 response.
Item .`Description Quantity Units - Unit Price NetAmount.
00001 PMWI Change Order#101 1.000 LS $2,467.00 $2,467.00
00002 Spreadsheet Summary 1.000 Ls $1,280.60 $1,280.60
00003 15%0verhead 8s Profit 1.000 LS $562.14 $562.14
00004 1%Bond Cast 1.000 LS $43.10 $43.10
The foregoing proposal includes direct labor and material costs only. Unit Cost: $4,352.84
Because this change order may affect the performance of our contract work,
C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: S0.00
such Impact costs which may result and to request an extension of time Lump Sum: $0.00
1 necessary when these items can be assessed.
This proposal is valid for 30 days. After 30 days,this proposal Lump Tax: $0.00
Prop Ys• Y p posal is subject
to change for any price increases which may apply
Total: $4,352.84
APPROVAL:
By: By: ZW///,
Thomas A. Joyce,P.E. t iey PXildsO,PE
Date: Date: 1/3/2012
cc: FF240
Field
Office C.H.Nickerson+Co.,Ina -49 Hayden Hill Road-PO Sox 808 - Torrington,CT 06790-0808
Phone: 860489-0455 - Fax: 860-496-0483 -PLM.0204803-P1-SHM.005805-SM1-M/EOE
OWNER
CHANGE ORDER ARCHITECT
CONTRACTOR
FIELD
OTHER
PROJECT: 09-1362 CHANGE ORDER#: 101
South Windsor,CT WPCF
PO Box 808 49 Haydon Hill Road CHANGE ORDER DATE: 10/19/2011
Torrington,CT 06790-0808 PROJECT#s:
TO: Pleasant Mount Welding,Inc. DATE OF CONTRACT: 06/16/2009
45 Dundaff Street
Carbondale,PA 184071801 FOR: mist metals
The Contract is changed as follows:
PENDING CHANGE ORDER 1362PC9 DATE MATERIAL REQUIRED ON SITE: i 1
5 sections 2-line alum handrail w/2 posts each $2,259.00
1 at V,1 at 62.6%1 at 64"&1 at 516"
Cost to supply toeboard on these 5 sections $208.00
Total Contract Change(add) $2,467.00
Freight Included—Tax Not Included
"As a policy of PMWI,we will issue a 100%credit for an item that is no longer needed,contingent upon the item was not detailed yet.
As an industry standard,if we detailed the item,in the anticipation that you will need it,and it needs to be deleted at a later date,we
will issue a 90%credit for that item".
The original Contract Sum was $193,792.00
The net change by previously authorized Change Orders is $10,972.00
The Contract Sum prior to this Change Order was $204,764.00
The Contract Sum will be increased by this Change Order in the amount of $2,467.00
The new Contract Sum including this Change Order will be $207,231.00
The Contract Time will be increased by 0 days.
The date of Substantial Completion as of this Change Order therefore is Unchanged
Not valid until signed by all parties below.
Pleasant Mount Welding,Inc. C.H.Nickerson&Co.,Inc.
ARCHITECT CONTRACTOR OWNER
45 Dundaff Street PO Box 808 49 Haydon Hilt Road
ADDRESS ADDRESS ADDRESS
Carbondale,PA 184071801 Torrington,CT 08790-0808
BY (Signature) BY (Signaaurs) BY (Signature)
Kenneth O'Hara
(Typed Name) (Typed Name) (Typed Name)
DATE DATE DATE
Quantum Software Solutions,Inc.Document
SOUTH WINDSOR WATER POLLUTION CONTROL FACILITY
FIELD FILE#240-Railing Openings @ Anoxic Tank
UNIT TOTAL UNIT TOTAL ITEM
DESCRIPTION QTY. UNIT PRICE MATERIAL PRICE LABOR COST
EQUIPMENT:
Small Tools(3%LABOR) $30.60 $30.60
Pickup Truck 10 HR. $15.00 $150.00 $150.00
Chipping Guns/Hammer Drills 10 HR. $8.00 $80.00 $80.00
SUB-TOTAL EQUIPMENT $260.60
LABOR:
Carpenter Foreman 10 HR. $84.00 $840.00 $840.00
Coordination 2 HR. $90.00 $180.00 $180.00
SUB-TOTAL LABOR $1,020.00
SUB-TOTAL MATERIAL,EQUIPMENT&LABOR $1,280.60
CDM
S ith
South Windsor Field Office
1 Vibert Road
South Windsor, Connecticut 06074
Tel: 860-282-0123
Fax: 860-291-8795
To: Stanley R. BujalskiZMa/gger
PE
Project Manager
From: Stephen KasleSite Construction
Date: January 18, 2012
Subject: Town of South Windsor Connecticut
WPCF Upgrade
Contract No. C-503
PCO No. 172 Railing In-fills
Anoxic Tank
Stanley,
We have received your Proposed Change Order No. 172 dated January 3, 2012, regarding the
additional cost of$4,352.84 for the installation of aluminum railing in-fills at the Anoxic Tanks where the
existing walkway bridges were removed and offer the following comment:
Due to the existing railing system which do not have toeboards; do not furnish toeboards with the new
in-fills. The cost of$208.00 for the toeboards was removed from your cost proposal and the labor to
install same was reduced by 2 hrs. Please see the revised attached cost summary sheet based on
CDM Smith a-mails dated 1-16-12 outlining same.
The revised amount, $3,857.00(rounded up)will be included in a forthcoming Change Order for the
Owners signature.
If you have any questions, please contact us.
Cc: Fred Shaw Town of South Windsor
Tom Joyce CDM
PCO Field File
SW WPCF PCO No.172 Railing In fills Anoxic Tanks Response Memo 1 1812.doc
® Nickerson
PROPOSED CHANGE ORDER
kL ----- ._.__ N0.00172
GENERA!.CONTRACTORS
TITLE: Railing Openings @ Anoxic Tank DATE:1/3/2012
PROJECT:South Windsor WPCF Upgrade JOB: 500422
TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:1
Camp Dresser&McKee,Inc.
Jefferson Mill
670 N Commercial Street
Manchester,NH 03101
Phone: 603 222-834S Fax:603-628-7675
RE:
' Issue: M40
::. . ..:
MFSG t-W-UQN::�I?
This Proposed Mange Order is for the additional cost to fumish and install aluminum railing at various openings in existing railing at
the Anoxic Tank per the RFI#270 response.
Item tiescrlption Quantity Units Upit-Pciee Nit.-Arnopnt
00001 PMWI Chasse Order#101
1.000 LS �
00002 spreadsheet summary l.00o Ls !f ofo(� ! Qtfl S�
00003 1516 Overhead do Prot 1.000 LS 4—q g��'6. }q S565H4 54,
00004 19S soaa cast 1.000 Ls ateSO=
The toregoing jai includes d'Kecx tabor and material costs only. 6¢
Because this change order may affect the performance of our contract work. Unit Cost:
C.H.tickerson+Co..Inc.reserves the right to seek compensation for any Unit Tax: $0.00 .�,
such Impact costs which may result and to request an extension of time
if necessary when these items can be assessed. Lump Sum: $0.00 1
This proposal is valid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00
to change for any price Increases which may apply
Total:
VeO
APPROVAL:
By: By:
Thomas A.Joyce,P.E. t eyWU'
Date: Date: 1/3/2012
cc: FF240
Field
Office C.H.Nickerson+Co.,Ina-49 Hayden Hill Road-PO Sox 80s-Torrington,CT 06790-0sm
Phone: 860489-0455 -Fax: 860496-0483-PLM.0204803-Pt-SHM.005805-SM1-AAfEOE
OWNER ❑
CHANGE ORDER ARCHITECT ❑�
CONTRACTOR
FIELD ❑
OTHER ❑
PROJECT: 094362
CHANGE ORDER#: 101
South Windsor,CT WPCF CHANGE ORDER DATE: 10/1912011
PO Box 806 49 Haydon Hill Road
Torrington,CT 06790-0808 PROJECT#s:
TO: Pleasant Mount Welding.Inc. DATE OF CONTRACT:
06/1612009
46 Dundaff Street FOR: misc metals
Carbondale,PA 184071801
Tha Contract is chanced as follows:
PENDING CHANGE ORDER 1362PC9 DATE MATERIAL REQUIRED ON SITE:! /
5 sections 2-line alum handrail wl 2 posts each $2,269.00
1 o to u 5'2.t�oard on these 5 sections =
'Cost to supply
Total Contract Change(add)
Freight Included—Tax Not Included
"As a policy of PMWI,we will issue a 100%credit for an item that is no longer needed,contingent upon the item was not detailed yet
As an industry standard,if we detailed the item,in dre anticipation that you will aced it,and it needs to be deleted at a later date,we
will issue a 90%credit for that item"•
$193,792.00
The original Contract Sum was $10,972.00
The net change by previously authorized Change Orders is $204,764.00
I
The Contract Sum prior to this change Order was $2,467.00
The Contract Sum will be Increased by this Change Order in the amount of $207,231.00
- The new Contract Sum including this Change Order will be 0 days.
The Contract Time will be increased by Unchanged
i The date of Substantial Completion as of this Change Order therefore is
i
Not valid until signed by all parties below.
Pleasant Mount Welding,Inc
C.H.Nickerson&Co.,Inc.
j OWNER
ARCHITECT
CONTRACTOR
45 Dundaff Street PO Box 808 49 Haydon HERoad
� ADDRESS
ADDRESS ADDRESS
Carbondale,PA 184D71801 Torrington.CT 06790-0808
BY (Srinafure)
BY (Srgnwe) BY (Slomwro)
Kenneth O'Hara
(Typed Name)
(typed Name) (Typed Nam)
DATE
PATE
DATE
Quantum Software Solutions,Inc.Document
i
�i
a
SOUTH WINDSOR WATER POLLUTION CONTROL FACILITY
FIELD FILE#240-Railing Openings Anoxic Tank ,
UNIT TOTAL UNIT TOTAL ITEM
DESCRIPTION QTY. UNIT PRICE MATERIAL PRICE LABOR, COST
EQUIPMENT:
Small Tools(3%LABOR) $ $fig 2 ' g"lv
Pickup TruckHR. $15.00 $ .00.
Chipping Guns/Hammer Drills 4&&HR. $8.00 $g�80 �,� �� (
SUB-TOTAL EQUIPMENT 9 S�
LABOR: �?7z
Carpenter Foreman 4L R. $84.00 $04"o $04"o
Coordination 2 HR. $90.00 $180.00 $180.00
SUB-TOTAL LABOR
SUB TOTAL MATERIAL,EQUIPMENT&LABOR
PCO No . 174
Page 1 of 1
From: Joyce,Thomas
Sent: Friday, November 18, 20117:34 AM
To: Stan Bujalski; Gary Willard
Cc: Lawson, Deborah; Kasle,Stephen
Subject: Response to RFI #278 Odor Control Fan Low Flow Air Switch Power
Attachments: 422 RFI-278 Odor Cnti. Fan Low Air Flow Switch Power.pdf
See below.
From: Kasle, Stephen
Sent: Friday, November 18, 2011 7:12 AM
To: Joyce, Thomas
Cc: Lawson, Deborah
Subject: FW: 500-422 South Windsor WWTF, RFI-278 Odor Control Fan Low Flow Air Switch Power
Response to RFI No.278:
The direction described in RFI No.278 is acceptable, please proceed in that manner.
Stephen Kasle
Site Construction Manager
CDM Field Office South Windsor WPCF
1 Vibert Rd South Windsor,CT, 06074
Tel:(860)282-0123
Fax: (860)291-8795
From: Gary Willard [mailto:gwillard@chnickerson.com]
Sent: Thursday, November 17, 2011 10:04 PM
To: Kasle, Stephen
Cc: megan@wjgei.com; Ipantano@wjgei.com;jpmichalec@aaronct.com; Stan Bujalski; Jeff Lavoie; Jonathan
Miller Jr.
Subject: 500-422 South Windsor WWTF, RFI-278 Odor Control Fan Low Flow Air Switch Power
Steve,
Attached for your information and response is RFI-278. Please confirm we have correctly directed our
subcontractor to resolve this issue.
Gary
file://CADocuments and Settings\kaslesd\My Documents\South Windsor Folders\SW BFI's... 1/14/2012
Nickerson PROPOSED CHANGE ORDER
No. 00174
GENERAL CONTRACTORS
TITLE: Odor Control Low Flow Switch DATE:1/9/2012
PROJECT:South Windsor WPCF Upgrade JOB: 500-422
TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO: 1
Camp Dresser&McKee,Inc.
Jefferson Mill
670 N Commercial Street
Manchester,NH 03101
Phone: 603-222-8345 Fax: 603-628-7675
RE: Issue: FF258
DESC 1O1v:0F ftOPOSAL
This Proposed Change Order is for the additional cost to perform Time&Material electrical work in accordance with the RE#278
for the Low Flow Switch on the Odor Control System.
Item Description
Quantity Units Unit Price' Net Amount
00001 Wayne 1'Griffin Proposal#103 1.000 Ls $1,720.00 $1,720.00
00002 501*Overhead&Profit On Subcontractor Work 1.000 iS $86.00 $86.00
00003 Bond Cost 1.000 ES $18.06 $18.06
The foregoing proposal Includes direct labor and material costs only. Unit Cost: $1,824.06
Because this change order may affect the performance of our contract work,
C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00
such impact costs which may result and to request an extension of time Lump Sum: $0.00
if necessary when these items can be assessed.
This proposal Is valid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00
to change for any price increases which may apply Total: $1,824.06
APPROVAL:
By: By:
Thomas A.Joyce,P.E. nl y R J ,PE
Date: Date: 1/9/2012
cc: FF258
Field
Office C.H.Nickerson+Co.,Inc.-49 Hayden Hill Road-PO Box 808-Torrington,CT 06790-0808
Phone: 860-489-0455-Fax: 860.496-0483-P1M.0204803-P4-SHM.005805-SM'i-/WEOE
W
Now
WNYNEJ
.IFFIN ELECTRIC
INC.
January 9,2012
VIA Env AIL&MAIL: sbuj.alskit'cr��chnickerson.com
1vlr. Stan Bujalski,Executive Vice•Presfdent
C.H.Micl-er-son&Company, Inc.
49 Hayden Hill Road
Torrington;CT 06790 f, 2
RE! Job#1475—South,Windsor WPCF, South Windsor,.CT
Proposal#_10.3
Dear-Mr.Bujalski:
In accordance with the field change order signed by your.authorized representative,Jeff Lavoie,.the
contract should be modified to include the following revision.
Labor and material to provide 110V to the FSL-8000 which is fed_from.PLC-PC.
'Material $ 610.00
Labor 858.00
Overhead&Profit 22.8.0:0
Subtotal $1,695.00
Bond 24.00
'Total :$1,720.00
This.additional work will require one(1)day added to the completion.date. Please issuea written
change order as the work above has been completed. The costs included in this field change do not
:include any amounts for extended-contract duration,oven time,.changes in.the.sequence of work,
acceloiretion,disruptions,interference.and/or impact costs,and the right is eoressly reserved to
recover for any and all of these-related items of cost:prior to any final settlement ofthis contract.
The working relationship between your company,and ours shall be in accordance with an:
appropriate:AIA contract or other mutually agreed to contract form.
CorporatelTeadquartets: Licenses: Resionol.ofGces:
116 Hblaping SWA Road MA .A8999 296 Cahaba Valley Parkway 2501 Akae.RW6v Ro.;ci. 1950 everarctn Blvd.
Holllston,MA 01746 NH -4221M Pelham,AL 35124. Suiet G-1.00 Suite 369
VT .1;1NWO3 Raleigh,.NC.27607 Duluth;6A 36006
Cr BLC0123697•El AL License 16318 me License 16529U GA Liceatse EN213.065
phone: (509)429-8830 RI AC003520 Reim (205)733-8848 Phone: (919)782.0720 Phone: (678)417.9377
Fm (508)429M25 ME. NIC6.00I7598 Fax: {205)733-8107 .Fax: (919)7.82-0724 Fax: -(679)417-9373
Mr. Stanley Bujalski
January 9,2012
Page 2
Wayne J. Griffin Electric, Ino.reserves the right to-void this proposal after thirty(30)days from the
above date.
Very truly yours,
WAYNE J. GRIFFIN ELECTRIC,INC.
L Pantano
enior Project Manager
LP/dpc
ACKNOWLEDGMENT, The contract modification stated for the above field change is acceptable
for the work already performed. The value-of the work completed to the date of the next requisWon
mgLy lie I illed.on that requisition.
Date: Authorized Signature:
cc: Martin Egan,Project Foreman,Wayne J. Griffm Electric,Inc.
ccN4 110V FROM-PLC TO FSL8000
Wayne J.Griffin Electric, Inc. Project Name: South Winidsor WPCF
-116 Hopping Brook Road "eat Number. 1475
Holliston,MA 01746 Page Number. I
Telephone-608-429-8830
CH Nickerson
Work Description
We reserve the right to correct this quote for errors and omissions.
This quote ommers direct cwW,only and we rowathe right to dift fbr Impectand consequential costs.
Ttft pripels good fbr-wAq#.an'ce WhIn 11 ft ft d days diadate rea*L
WbYA supply:wd Wag 4'*96is,Z;e,and equipment.asper your instructions to provide 110V'toFSL-8000 fed froin PLC-PC
Rdimind Brookdown
Descdlptloh Qty Net Price.U Total Mat($) Labor U Total Hours
3/4> 1JZ--'-REDUCJNG-RU.8HlNG 1 546.50 C 5.4.6 0-00 0 0:00
314"PVC CTD QR; 40 62740 C- 2550.96 0.*-00 C O.W.
We PVC CM'GRC-C-P.LG 4 568.88 0 23.96- 0.00 C 0.00
31411 PVC GM T 1 80.4.8 E 80.48. 0.0.0 t U.0.
XV PVC C TD 00 DEG FELBOW 1 2,073.19 C 20.7.8 0.00 C 0.00
V"PVC CM. 1-H MALL STRAP 3 1.182.92 C 36..48 0.00 C 0.00
31411 PVC CM CLAMPBACK 3 1,788.00 C 53.64 0.00 C 0.00
'lit"LT FLEK 5 2.6540-C 13.25 0.00 C 0.00
Vr LT-SIM.GHT. CONN 2 :386.54-C 7.73- 0.0.0-C 6.0b
#14 TH14N sLAcK 500. 236.86-M 1118.43 0.0.0.M 0.00
Labor Only 12 0.00 E 0.00 1.00.E 12.00
Totals 610.17 12.00
- Summary
General Materials: 610.17
Material Total 61,01117'
Electrician (12.60 Hrs 0 S711.50). $58.00
Subtotal 1,468.17-
Oveifie*ad %Q00 9b 146,82.
Pf ofit to-U0Q 80.75
Bond .23774
Final Amount $1,71&48
WAYNE J.GRIFFIN ELECTRI•C,.114C. WORK AUTHORIZdTION DATE: a '
1.16 HOPPINe BROOK ROAD 'AtNDADURESS NUMBER �''f r7S CHECK ONE:
HOLLISTOM,MA.01746- PAGE / OF �I TERIAI.
TEL.508-A•29-8830 FAX:$08-4�94$..25 DIVISION wORR
cu5rotw�uwr: G rr i k jl'r rso�/ , - // _ aye, G• orHEa
ESCRI OF RIC rf�C / (^�G �I�L"' PLEASE SPECIFY
STREET �, �^
crry auTE ��L!�"AL /,Ji3e✓ /`/�af �1'r�j �'d 001 �nEeoRrneR�
EA
,Iza
PRE-WORKAUTHORVATION: DATE: ! Z
AUTHDRIZED.SIONATURE
YOU ARE'HEREBY AUTHORIZED'TUPERFORM THE A8 • -ADDITIO : 'WORK UH(LiEHTkIE>SAME:CrQNplT10NSA$SPECIFI,ED'IR(T.HE ORIGINAL CONTRACT PROPOSAL 1NLESS O7HERN/ISEl IPULATI D
MATERIAL AND LABOR 13REAKDOWN:
(QUANTITY MATERIAL � UAiNTITY MATERIAL
2 . 31c
u � ink' ..
"3 ' D S�J�•c
ONE 11 a
3J a I �r k
57 d 1Y?`�Yflr� -- C 44;k' 70- . Chl air else xr ! °::'' C ►le�v�
TIME AND LABOR RECORD:
VVORIEER DATE IN OUT IN OUT HOURS WORKER DATE IN OUT IN OUT HOURS
�.f• CC:2C
AUTHOR 'SIGNATURE DATE:
White-Acoounlin Yellow-Cllent Pink-ProlddlVidnadsi Gold-Forerhan The labor and mateYlals listed above are rate end'th-work was coot loW sall0actorll
CDM=
S ith
South Windsor Field Office
1 Vibert Road
South Windsor, Connecticut06074
Tel: 860-282-0123
Fax: 860-291-8795
To: Stanley R. Bujalski, PE
Project Manager
From: Stephen Kasle - er
Site Construction M ag
Date: January 14, 2012
Subject: Town of South Windsor Connecticut
WPCF Upgrade '
Contract No. C-503
PCO No. 174 Low Flow Air Switch
Odor Control System
Stanley,
We have received your Proposed Change Order No. 174 dated January 9, 2012, regarding the
additional cost of$1,824.06 for wiring the Odor Control system low flow air switch on a time and
material basis and find the cost acceptable.
This amount, $1,824.00(rounded down)will be included in a forthcoming Change Order for the Owners .
signature.
If you have any questions, please contact us.
Cc: Fred Shaw Town of South Windsor
Tom Joyce CDM Smith
PCO Field File
SW WPCF PCO No.174 OC Low Flow Switch Response Memo 1 1412.doc
PCO No . 175
p Page 1 of 2
From: Joyce,Thomas
Sent: Thursday, November 17, 20115:16 PM
To: Stan Bujalski
Cc: Lawson, Deborah; Kasle,Stephen
Subject: Response to RFI #275 Sodium Hypochlorite Pump Pressure Switches
Attachments: RFI-275 Sodium Hypochlorite Pump Pressure Switches.pdf
Importance: High
Response to RFI No.275
The pressure switches mentioned in RFI No. 275 are currently mounted in the field.
Install 2 No. 14 wires from each switch back to PLC-CB. Discussions with WJGE,they can utilize spare conduit for
some of the distance between the chemical room and the electrical room and will provide a new conduit drop to
each switch.The contact from each switch shall provide a "High Pressure SITYP Pump No.1"and "High Pressure
SITYP Pump No.2"alarm at PLC-CB, utilize 2 spare digital inputs at PLC-CB. CDM AE group will write software to
shutdown the pump upon initiation of the switch contact.A COR will follow.
Stephen Kasle
Site Construction Manager
CDM Field Office South Windsor WPCF
1 Vibert Rd South Windsor, CT, 06074
Tel:(860)282-0123
Fax:(860)291-8795
From: Stan Bujalski (mailto:sbujalski@chnickerson.com]
Sent: Tuesday, October 18, 2011 2:17 PM
To: Joyce,Thomas
Cc: Shaw, Fred
Subject: FW: 500-422 South Windsor WWTF, RFI-275 Sodium Hypochlorite Pump Pressure Switches
Importance: High
FYI. RFI#275.
Stanley 9 Buja66 Tte
Executive Vice President
C. H. Nickerson& Company, Inc.
Torrington, CT
860-489-0455
860-496-0483-Fax
www.chnickerson.com
AA/EOE
From: Gary Willard
Sent: Tuesday, October 18, 2011 9:21 AM
To: Steve Kasle (KasleSD@cdm.com)
Cc: Stan Bujalski; Jeff Lavoie; Jonathan Miller Jr.
Subject: 500-422 South Windsor WWTF, RFI-275 Sodium Hypochlorite Pump Pressure Switches
file://C:\Documents and Settincs\kaslesd\Mv Documents\South Windsor Folders\SW RR's... 1/14/2012
Page 2 of 2
Importance: High
Steve,
Attached is RFI-275, please review it and advise us as soon as possible as how to proceed. Work will be
proceeding on this system now that the flooring has been completed. If you should have any questions, please
contact me.
Gary
file://C:\Documents and Settingslaslesd\Mv Documents\South Windsor Folders\SW RR's... 1/44/2012
PROPOSED CHANGE ORDER
Nickerson No. 00175
GENERAL CONTRACTORS
TITLE: Chemical Pump Pressure Switches DATE:1/9/2012
PROJECT:South Windsor WPCF Upgrade JOB: 500-422
TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:1
Camp Dresser&McKee,Inc.
Jefferson Mill
670 N Commercial Street
Manchester,NH 03101
Phone: 603-222-8345 Fax: 603-628-7675
RE: Issue: FF025
DESCRIPTION OF PROPOSAL
This Proposed Change Order is for the additional cost to provide electrical wiring for the pressure switches at the Sodium
Flypochlorite Pumps per the RFl#275.
Item Description Quantity Units Unit Price Net Amount
00001 Wayne J.Griffin Elemic Proposal#102 1.000 LS $1,374.00 $1,374.00
00002 5"/o Ovenccad&Profit on Subcontractor Work 1.000 LS $68.70 $68.70
00003 1%Bond Cost 1.000 LS $14.43 $14.43
The foregoing proposal includes direct labor and material costs only. Unit Cost:. $1,457.13
Because this change order may affect the performance of our contract work,
C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00
such impact costs which may result and to request an extension of time Lump Sum: $0.00
if necessary when these items can be assessed.
This proposal is valid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00
to change for any price increases which may apply Total: $1,457.13
APPROVAL:
By: BY:
Thomas A.Joyce,P.E. B uj allK,
Date: Date: 1/9/2012
FF025
Field
Office C.H.Nickerson+Co.,Inc. -49 Hayden Hill Road-PO Box 808-Torrington,CT 06790-0808
Phone: 860-489-0455- Fax: 860-496.0483-PLM.0204803-P1-SHM.005805-SMI-AA1EOE
WAY I&J.
GRIFFIN ELECTRYC
January 9,,20_l2
VIA EMAIL&MAIL: sbajalski tz chnickerson cam
W.Stan Bujalsk,Executive Vice President 2
C.H,'Nickerson&Company,Inc.
49 Hayden Hill Road
Torrington,.CT 067-90-
RE Job.41475—South WR indsor WPCF,.South Windsor,CT
Proposal#102-
Dear Mr.Bujalski:
In accordance with the field change order signed by your authorized representative-, Jeff Lavoie,the
contract should be modified to include the following revision:
Labor and'material to.add two(2)DI points:for pressure switches for the sodium hypo pumps.
Material $ 45-9.00
Labor 7.15.00
Oyerheati&Profits ...z.00.
Subtotal $p55.00
Bond 19.00
Total $1,374,00
This.additional work will-require one;(1)day added to the-:eompletion date. -Please issue..-a-writtsrn
change order as th&.wlrk above has bcen completed. The.costs inOuded in this field change do not
Yriclude and amounts.for eXtended:co.t ldt duration,overtime,ehanges-'to the sequeuee of work.,
acceleration,-disruptions,interference and/or impact costs,:and the right is.expressly reserved to-
recover for any and:al1 of these related items of cost prior to any final settlement of this-contract.
The working relationship between your company and ours shall be in accordance with aA
appropriate AIAA-contract or other mutually agreed to contract form,
CoiporateHeadquarters: Licems: Regional UPBces;
116 Hopping Brink Rbad NA A8999 296 Cahaba Valley Parhway 2501 Blue Ridge Rond 1.9%Evergreea Blvd
Holliaon,MA 01746 NI-1 4233M Pelham AL 35124 suite G•100 Suka-300
VT FIM1.303 Raleigh,-NC 27607 Duluth,GA 30096
CT ELC.4123697-E1 AL License 16318 NC License 16529U GALicense EN213065
Phone: (..W)429-8830 :R1 ACA03520 Phone: (205)733-8848 Phone: (919)782-47'?0 Phone: (678)417-9371
Fax= (508)429-7825 ?v1E. MC 0017598 Fax: (205)733-8 97 Fax; (919)782-0724 FaX: (678)417-9373
Mr.Stanley-Bujalski
January 9,201�
Page 2
Wayne J:Griffin Electric,Inc..reserves the right-to void this proposal after thirty(30) days froiin the
above date.
Very truly yours,.
'VJ ixNE J.GRIFFIN ELECTRIC,INC.
L . Pantan.
Senior Project Manager
LP/dpe-
ACIG40WLEDGMENT The contract modification stated for-the above field change is-acceptable
for:the-work.-already. performed. The.-value.of the work:completed to the date of the next requisition
may be-billed on.-ftt.requisition.
Date: Authorized Signature:
sec: Martin Egan,.Project Foreman,Wayne J..Griffin Electric,.Inc.
CCN# PS FOR SODHI.M HYPO PUMP
Wayne J.Griffin Electric, lnc. Project Name: South Windsor WPCF
4181-10 in Brook Road Project Number, 1475
Holliston,MA 01746 Page Number. 1
Telephone:608429-8830
CH Nickerson
IiVork Descrip8on
We reserve the right to correct this quote for errors and omissions.
Thia:gwto.00vers direct costs onlyand we reservethe rightto daim forknpact and conaequertial costs.
Tfils priceis good for.accaeptance aAthin 7e days.fwm the da%of receipt.
'Wewill sepptyandinstall atf.mwedaW,tabar,and equipov"as perycur instructions to provide two DI points'for preasure svwtches for the
sodium.hypo pumps-.
fterniied:Breakdown
Description Qty Net Price U Total Mat($) Labor U Total Hours
3/0 1!2'REDUCING BUSHING 2 546.60 C 1C 93 0.00 C 0.00
3f4"PVC:CTD GRC 20 627.40 C 125:48 0:00 C 0.00
3140 PVC CTD GRC CPLG 4 598:88 C 23.96 0.00 C 0.00
3/4"PVC t:"f D x 1 82.50 E 82.50 0:00 E 0.00
VW PVC CTD 90 DEG ELBOW 2 2,078.19 C 41.56 0.00 C 0.00
3/4"PVG.GTD STRUT STRAP 3 439,79 C 13.10 0.00 C 6.00
11;e-LT FLEX 10 265.00 C 26.:50 0.00 C 0.00
1I2'LT 9T- RAi.GHT CONN 4 38t3.54 C 18.46 0:00 C 0.00
#14 TkiHK BLACK 500 236.06 M" 118.43 0:00 M 0.00
Labor Only 10 0.00 E 0:00 1.00 E 10.00
Totals 458.01 10.00
Summary
.General Materials 450.01
Material Total 468.01.
Electrician (1.0.00.We @$71.50)- 715 00
-Subtotal 1,173.01
Overhead ( 10:000 Q*) 117.30
Prorit (r 5.060%) 64.52
Bond.
Final.Amount $1;373.80
F
WAYNE J.•rR•IFFIN ELECTRIC, INC. WORK AUTHORIZAMON DATE:
116 HOPPING B:ROQK,.RUAD .aaiDADotaEss NuMSM AlAS CHECK ONE: ,
HO.LLI.STON,MA.01.746 P.AOE t of ! �i�n AIAL
TEL:50,842-9-8830 FAX:.508.4 47$4 ,� .d L`'f 0 DM .rls WORK
/� f � / � /� ,/ OTHER
dtJ.^srC1MER'NAiAE 7.-. . G iC,/ 7DJJ DESC UMON.MWO l-oks��vut- f:1.' t- c3c,hae, D Jl+'1 f � PLEASE SPECIFY
All ( A
STREET n) �J�.f+ u�t(1i1 fir A ;4",r S&V
MsTolmsR
ORY &ilA1 PACHASEbROM9
PRE-IlVO1 K AUTHORIZATION: DATE.
Avr MIZEOMnuTURa
YOU ARE F3EfiE9Y AUTHOTIIZEDTD PERFORMTH@ AR OE ADDITiO ;WQRK:UNDER'TMII SA AE:{AN.RI )1[3#1S S{?gQjf iFD iN THE ORIGINAL CONTRACT PROPOSAL UNLES$MERWISE STIPULATED
MATERIAL AND LASOR BF0KDOWN:
QUANTITY 'MATERIAL MATERIAL
.f�/Q' yJ V� AA �1,I,7f•!i�it3�t�FE{;r •id::,�t" >ii �fla::i.,
fTw ' L%� :[ ii3�li,tet::I�y�li�Ijt�)}�•.f�1;4'i'i'1.� �•��i'' ;,.2'Sifl': s11i.<t:1.1i.,i1:'�i`�s`ii'n:i3�•'fu.Ier;•.
3j Svc _._..._... .::�:
.,r
(/<- 90 '
3� �f BUG .
� � _� �,�... arc;.. .:��N!�J�. •
TIME AND LABOR•REC.ORD:•
�q WORKER. BATE IN OUT IN OUT KOII% WORKER DATE IN OUT IN OUT HOURS
AUYHE>fi12EDs1GNATUAE C..DLVt DATE: ! G✓
White-Accounting YbUbw-Client Pink-Pio'of Mana'er Gold-Forclhfan The labor and materials listed aboaa ars a rate:and.the vrork was oC Ieted sa sbdoril
CDM=
Smith
,South Windsor Field Office
1 Vibert Road
South Windsor, Connecticut 06074
Tel: 860-282-0123
Fax: 860-291-8795
To: Stanley R. Bujalski, PE
Project Manager
From: Stephen Kasle _
Site Construction Ma ger
Date: January 14, 2012
Subject: Town of South Windsor Connecticut
WPCF Upgrade
Contract No. C-503
PCO No. 175 High Pressure Discharge Switches
SITYP Pumps Control Building
Stanley,
We have received your Proposed Change Order No. 175 dated January 9, 2012, regarding the
additional cost of$1,457.13 for wiring the high pressure discharge switches at the SITYP pumps in the
Control Bldg on a time and material basis and find the cost acceptable.
This amount, $1,457.00(rounded down)will be included in a forthcoming Change Order for the Owners
signature.
If you have any questions, please contact us.
Cc: Fred Shaw Town of South Windsor
Tom Joyce CDM Smith
PCO Field File
SW WPCF PCO No.175 Hi Pressure Switch Response Memo 1 14 12.doc
PCO No . 176
C��i I"S a n PROPOSED CHANGE ORDER
No. 40176
GENERAL CONTRACTORS
TITLE: Glass Replacement @ Control Bid. DATE:1/9/2012
PROJECT:South Windsor WPCF Upgrade JOB: 500-422
TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:l
Camp Dresser&McKee,Inc.
Jefferson Mill
670 N Commercial Street
Manchester,NH 03101
Phone: 603-222-8345 Fax:603-628-7675
RE: Issue: FF264
bESCRIPTION'OYOROPOSAL '
This revised Proposed Change Order is for the additional cost to furnish and install six 0freplacement galas at the existing window
frames in the Control Bld.per field request.
tem Des&iption. ::.. uaidty units Unit Price• Net-Ainount
00001 Area Glass&Mirror Co.Quotation dated 1/9/12 1.000 LS $4,783.70 $4,783.70
00002 5%Overhead&Pn et on subcontractor work 1.000 LS
$239.19 $239.19
00003 Cleanup Laborer(Inc].O&P) 1.000 HR $8050 $80.50
00004 Bond Cost 1.000 Ls $51.03 $51.03
The foregoing proposal includes direct labor and material costs only. Unit Cost: $5,154.42
Because this change order may affect the performance of our contract work,
C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00
such impact costs which may result and to request an extension of time Lamp Sure: $0.00
if necessary when these items can be assessed.
This proposal is valid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00
to change for any price increases which may apply Total: $51154.42
APPROVAL:
By: By: •
Thomas A. Joyce,P.E. ley R ujalski,PE
Date: Date: 1/9/2012
cc: FF264
Field
Office C.H.Nickerson+Co.,Inc.-49 Hayden Hill Road-PO Sax 808 -Torrington,CT 06790-0808
Phone: 860-489-0455-Fax: 860.496-0483-PLM.0204803-Pt-SHM.005805-SM1-AA/E0E
FROM MACSATA PHONE NO. : 91045B73B3 Jan. 09 2012 05:01PM Pt
RECEIVED
C.H. NICKERSON & CO., INC. op
.A= GLus & o "-r,';0m�,%wslY
2U Rivv chive JAN 0 20i2
"COrc►ugt�+ .CT 06790 BCN EJ JHM ❑ ❑
GAW ❑ AM 0 SRB El SJE
Proorte: (W)489-0611 DES 0GC ❑ GEM ❑
MJR El
Fcz 4 fEru¢)� -00 n KOH ❑ AP ❑ JTR d GMC❑
£mnt� �+r+tsli�r+ +dF ❑ ❑ ❑ i/Q 9/12
NAMI � 4 103 NUMBER
-"hO.M rn�h�yW��w.w�!' �..N-wMMM�11Y'Mn.M..i-..J..yr rwrYMM�r
J 500-422
Nickerson Windsor WWTP ,.,
i ATTIJ Stan
xE3f:'4 LN 'Y COST TOTAL
1 (7) TemperOS safety glans
replac*Ments
' installed in existing
exterior aluminum frame
Glazing tape settings s
t with silicone Sealant t !
stagging required
weather permitting 4,783.70
for the sua of
f yN,. YM.
CCDM-
Smith
South Windsor Field Office
1 Vibert Road
South Windsor, Connecticut 06074
Tel: 860-282-0123
Fax: 860-291-8795
To: Stanley R. BujalValger
ki PE
Project Manage -
From: Stephen KasleSite Constructio
Date: January 13, 2012
Subject: Town of South Windsor Connecticut
WPCF Upgrade
Contract No. C-503
PCO No. 176 Glass Replacement
Control Building
Stanley,
We have received your Proposed Change Order No. 176 dated January 9, 2012, regarding the
additional cost of$5,154.42 for the replacement glass at the south and west elevations of the Control
Bldg. and offer the-following comment:
Based on a further review of the contract documents, replacement glass is required on the south
elevation of the Control Bldg per A-CB-3. Based on this, we only require replacement glass on 4
window sections of the west elevation. Please see the revised attached cost summary sheet based on
our discussions
The.revised amount, $2,983.00(rounded up)will be included in a forthcoming Change Order for the
Owners signature.
If you have any questions, please contact us.
Cc: Fred Shaw Town of South Windsor
Tom Joyce CDM
PCO Field File
SW WPCF PCO No.176 Glass CB Response Memo 1 1312.doc
N
Nickerson
PROPOSED CHANGE ORDER
No. 04176
GENERAL CONTRACTORS
TITLE: Glass Replacement @ Control Bid. DATE:1/9/2012
PROJECT:South Windsor WPCF Upgrade JOB: 500-422
TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:I
Camp Dresser&McKee,Inc.
Jefferson Mill
670 N Commercial Street
Manchester,NH 03101
Phone:603-222-8345 Fax:603-628-7675
RE. Issue: FF264
ESC 'IPTION•�OF•I'1tOP09Ai�
This revised Proposed Change Order is for the additional cost to furnish and install six 0f replacement galas at the existing window
frames in the Control Bid.per field request.
Item Des6i3ption uaa6ty Units Uiutt Price Net•Amotint
00001 Area Glass&Mirror Co.Quotation dated 1/9/12 1.000 a .1fl). Vie ,75 tits
00002 5%Overhead&Profit on subcontractor work 1.000 IS —W9:{9- ,..6230!
00003 Cleanup Laborer t7nc1.O&P)
1•000 HP, $80.50 $90.50 '
00004 Bond Cost
1.000 LS 45"3 -45H3
The foregoing proposal includes direct labor and material costs only. Unit Cost. 5�
because this Mange order may affect the perfonnatx�e of our txmUact work, r p
C.H.Nickerson+Co.,Mc.reserves the right to seen compensation for any Unit Tax:
such Irnpact costs which may result and to request an extension of Gme Lump Sum: . $0.if necessary when these gems can be assessed.
This proposal is varid for 30 days. After 30 days,this proposal is subject Lump Tax: $0.00
to Mange for any price increases which may apply
Total:
4q zi9
APPROVAL:
By: By: Z4 ,
Thomas A.Joyce,P.E. ley R eujalski,PE
Date: Date: 1/9/2012
cc: FF264
Field
Office C.H.Nickerson+Co.,Inc.-49 Hayden Hill Road-PO Box 808-Torrington,CT 06790-0808
Phone: 860-489.04W-Fax. 860.496-0483-PI.M.0204803-Pi-SHM.005805-SMJ-AA/EOE
FROM MACSATA PHONE NO. : 91045Eme3 Jan. 09 2012 05:01PM P1
RECEIVED
C.H. NICKERSON & CO., INC. 00
.Area Gim & Mirror VA)m wm JA
20Rivcr Drive 0 9 2012
Toremg; n,CT 06790 BCN ❑ JHM ❑ SRB ❑P�arre: t860J SJE ❑
w«-�--11 E
489-061t GAW❑ AM GC GEM ❑
MMJR El DE1 ❑ GCQfix M KOH ❑ AP ❑ JTR
-
11/1&2
° ❑ ❑ ° 1/09/12
JOB NUNMER
NAM
500-422
Nickerson Windsor WWTP
iF ATTN6Stan oe
COST TOTAL
.4 3G
1 SZrTemperes safety glass
replacements
i
Installed in existing !
exterior aluminum frame .
Glazing tape settings
with silicone sealant
stagging required
weather permitting �
for the Sum of
-7
f
PCO No . 177
Nickerson
REQUEST FOR INFORMATION
No.00208
GENERAL CONTRACTORS
TITLE: Catch Basin Tops ma'amDATE: 11/17/2010
PROJECT:South Windsor WPCF Upg JOB: 500-422
L I V L5 1"I
TO: Attn: Stephen Kasle FEB 14 2011
Camp Dresser&McKee,Inc.
1 Vibert Road &WOMASTARTED: 11/17/2010
South Windsor, CT 06074 %NPMIVICOMPLETED:11/29/2010
SOUTH WINDSOR FIELD OFFICE REQUIRED: 11/24/2010
Field File#153 was recently created to track the request to replace an existing manhole cover in the driveway
and the existing curb type catch basin in the headworks island with flat type CL tops and galvanized grates. This
was facilitate the new layout of paved areas. These are being tracked on time and materials.
There are two additional exisitng catch basin tops; one west of the administration building, curb type, in pretty
poor condition and an older style square type at the West of the main gate.Do you want these catch basin tops
replaced also with curb type tops,intergrated with the new concrete curbing?All the existing tops were to left in
place by the contract documents.
Please replace the two catch basin tops in question, one west of the Administration Bldg and the old style flat
top at the existing Main Entrance gate. Incorporate with new curbing;perform work on a T&M basis and
include with FF-153.
Requested By:C H Nick pany Inc. Date: 11/17/2010.
Signed:
;
Carl R.Johnson
RFI No.00208
Field
Office C.H.Nickerson+Co.,Inc: - 49 Hayden Hill Road - PO Box 808 -Torrington,CT 06790-0808
Phone: 860489-0455 - Fax: 860496-0483 - PLM.0204803-P1-SHM.005805-SM1-AA/EOE
Nickerson
PROPOSED CHANGE ORDER
No. 00177
GENERAL CONTRACTORS
TITLE: Catch Basin Tops DATE:1/9/2012
PROJECT:South Windsor WPCF Upgrade JOB: 500-422
TO: Attn: Thomas A.Joyce,P.E. CONTRACT NO: 1
Camp Dresser&McKee,Inc.
Jefferson Mill
670 N Commercial Street
Manchester,NH 03101
Phone: 603-222-8345 Fax: 603-628-7675
RE: Issue: FF153
pES.CRIPTION OF FROPOSAL.
-This Proposed Change Order is for the additional cost to replace two(2)existing catch basin tops per the Rh'I#208.
Item Disci iptinn Quani ity 'Units Unit-Price Net Amount.
00001 Time&Material Authorization Sheet Summary 1.000 LS $1,848.00 $1,848.00
00002 1%Bond Cost 1.000 LS $18.48 $18.48
The foregoing proposal includes direct labor and material costs only. Unit Cost: $1,86b.48
Because this change order may affect the performance of our contract work,
C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00
such Impact costs which may result and to request an extension of time Lump Sum: $0.00
if necessary when these Items can be assessed.
This proposal is valid for 30 days. After 30 days,this proposal is subject Lamp Tax: $0.00
to change for any price increases which may apply
Total: $1,866.48
APPROVAL:
By: By:
Thomas A.Joyce,P.E. y R Bu' s i, E
Date: Date: 1/9/2012
cc: FF153
Field
office C.H.Nickerson+Co.,Inc. -49 Hayden Hill Road-PO Box 808-Tordngton,CT 06790-0808
Phone: 860-489-0465 - Fax: 860.496-0483-PI.M.0204803-PI-SHM.005805-SM1-AAIEOE
Rmr%0�E��
ADDITIONAL FIELD WORK AUTHORIZA.HOWERSON & CO., NC.
C.H.NICKERSON&COMPANY,INC.
P.O.BOX 808 NOV 3 0 20113
TORRINGTON,CONNECTICUT 06790
PHONE 489-0455 BCN ❑ JHM CI SRB 0 . JE 1
GAW [I AM ❑ GC 9,
' MJR ❑ DEB L. D?R _I vMC �1
PecEONTRAC - AP ❑ JTR
roR NAME �1,, G r i ENE ❑ DATE tZs- to
STREET • JOB NAME ''ff • ,, CHN JOB NUMBER
cm K WLNbS���
STATE STREET
7
FIELD FILE# CHANGE ORDER N CITY STATE
You are hereby authorized to perform the following specifically described additional work: Et Inc',C' u W d
CtIE r4r if'. jS t2_ FEs tx-A A--C-o r.v /Z�/-2a a 1g:�r't j 3 <<c 65 4 c.N 4VaT 4t I
. ,4.•ua qe'�{-'r-�� �ar�� PgnT'tat. ir.e�k-��, �•sT:.�+�a E
QUANTITY UNIT PRICE oTAI_
CA-MO1-
��--1 �-- � • 21 C.,LC. !arc: ��.,.��,- l G� s �''j q�i _ a a
14
tic(Ko
ADDITIONAL CHARGE FOR ABOVE WORK IS:$
Payment will be made as follows: Check one (Time Material) (Unit Prices)
Above additional work to be perform r s e con . s specified in original contract unless otherwise stipulated.
Authorizing Signature Print !S-M Q
OWNE REPR ATIvE SIGNATURE)
Date 20 G�
We hereby agree to furnish labor and materials complete in accordance with the above specifications at above stated price.
Authorized Signature Date 20
NOTE:This revision becomes part 01,and in conformance with,the existing contract.
Arrow Concrete Products,Inc.
560 Salmon Brook Street INVOICE 1059428
Granby,CT 06035 Invoice Date: 11110/2010
Phone:(860)653-5063
Fax:(860)653-0267 CUSTOMER
Sold to: 23026 Job Number: M13303
NICKERSON,C H&COMPANY Ship to: SOUTH WINDSOR,WATER POLLUTION FACILIT
49 HAYDEN HILL ROAD
P O BOX 808
TORRINGTON,CT 06790 SOUTH WINDSOR,CT
111 MIO COREY 11602 2(15M 1
AM2131746 WA 105�428
CAY Unit Item Description Weight Unit Price TX Extension
Structure: 110810
2 EA CBTCLG TYPE"CL"FLAT CB TOP-GALV. 2,640 $371.00 ❑ $742.00
Structure Total $742.00
---••-----...---•-•...........................•----•--. .................. ......................................................................
Total Weight 2,640
............................................... ..................................................... --.........•-----.....-•-••-•-- ................
Taxable $0.00
For your convenience we are now accepting%W,MasterCard,AMEX,and Non Taxable $742.00
Discover. Please call for more information.
Sub Total $742.00
Tax $0.00
invoice Total $742.00
Less Deposit $0.00
Invoice Balance $742.00
22�discount available per above terms $14.84
RECEIVED
C.H. NICKERSON & CZSJE
;
NOV 15 2010
BCN O JHM ElSRBO �
GAW ❑ AM O GC [3 GEM ❑
tiIJR (] DES @ DBR ❑ GMG 13
KOH p AP ❑ JTR ❑ O
0 ❑ C
CONDMONSOFSALE
Payment term"specified on the fare of the invoice. Late payment is subject io a finance
,,ww a of 1.3%per man&(an annual percentage rate of I8%). In case of non-payment,cost
of collection Including reasonable attomeys fees will be charged No badrehaWs or
retainage will be acoepted without prior written approval.
CDFA-
Smith
South Windsor Field Office
1 Vibert Road
South Windsor, Connecticut 06074
Tel: 860-282-0123
Fax: 860-291-8795
To: Stanley R. Bujalski, PE
Project Manager .
From: Stephen Kasle
Site Construction Ma ager
Date: January 14, 2012
Subject: Town of South Windsor Connecticut
WPCF Upgrade
Contract No. C-503
PCO No. 177 Replace Catch Basin Tops
Site
Stanley,
We have received your Proposed Change Order No. 177 dated January 9, 2012, regarding the
additional cost of$1,866.48 for replacement of two flat top catch basin tops in the west entrance area
on a time and material basis and find the cost acceptable.
This amount, $1,866.00(rounded down)will be included in a forthcoming Change Order for the Owners
signature.
If you have any questions, please contact us.
Cc: Fred Shaw Town of South Windsor
Tom Joyce CDM Smith
PCO Field File
SW WPCF PCO No.177 Replace Catch Basin Tops Response Memo 1 1412.doc
PCO No . 178
com
Memorandum
To: Steve Kasle
From: Andrea Adams/MatthewAshe
Date: October 25, 2011
Subject. South Windsor Water Pollution Control Facility:Loading Docks
Introduction
On October 11,2011,the condition of three loading docks at the South Windsor Water Pollution
Control Facility was assessed. One loading dock is located along the east side of the Headworks
Building-and two loading docks are located at the Control Building, one on the east side and the
other on the west side.
The reinforced concrete loading dock at the Headworks Building was constructed around 1980
and is approximately 24 feet by 4 feet in plan. The concrete slab is of cantilevered construction
and has a thickness of 8 inches at the face of the wall tapering to 4 inches at the edge.
The two reinforced concrete loading docks at the Control Building were constructed around 1966
and are of cantilevered construction. The east loading dock is approximately 46 feet by 4 feet in
plan,with a thickness of 8 inches at the face of the wall tapering to 4 inches at the edge. The west
loading dock has plan dimensions of 16 feet by 3 foot-8 inches and a tapered slab thickness of 8
inches at the face of the wall to 4 inches at the edge.
The loading docks were previously assessed in December 2007. Photographs from that
assessment are used in this report as comparison to the present day condition. Visual
observations and hammer sounding of the top and underside of the concrete slabs were the
means used to determine the condition of the existing loading docks. Several photographs were
taken for documentation.
Observations
Specific areas of deterioration were noted as follows:
Headworks Building-East Loading Dock
Steve Kasle
10/25/11
Page 2
Top Side of Slab:
■ There was a new 1-ft by 3-ft area of spalled concrete approximately 3-in deep along the
edge of the south end of the dock. Within the spall,there were two exposed reinforcing
bars with surface rust,approximately 3-ft long. There was a new 2-ft by 1-ft area of
hollow sounding concrete adjacent to this spall.
■ Adjacent to the column at line 3,there was a new area of spalled concrete approximately
3-ft by 3-ft by 1 Ya-inches deep. There was an existing spall, 12-in by 8-in by 1-in deep,
directly across from the column at line 3 as previously indicated in 2007.
■ Adjacent to the column at line 6,there was an area approximately 3-ft 8-in by 4-ft 6-in by
1 Y2-inches deep (maximum) of spalled,hollow sounding concrete. There was an area
within this spall that had been previously repaired;however,the repair was not bonded
to the underlying concrete.
■ The north-east corner of the dock had a new spalled area of loose concrete approximately
6-in by 10-in by 2-in deep.
■ There were two new cracks toward the north end of the dock approximately 3-ft apart
running in the short direction. One crack was 3-ft long by%-in wide and the other crack
was approximately 4-ft long by 1/8-in wide. Both cracks were continuous through the
concrete slab to the underside.
Under Side of Slab:
■ There were three new areas of spalled concrete,totaling approximately 7 square feet by
1-in deep,located along the east edge of the loading dock. Within these spalls,there were
approximately 9 linear feet of exposed reinforcing bars with surface rust.
t There were 5 new cracks (approximately 1/8-in wide)totaling approximately 10 linear
feet running in the short direction of the slab span. There was a rust stain on the
underside of the slab along the crack and efflorescence was visible in all cracks.
Control Building-East Loading Dock
Top Side of Slab:
■ There were three areas of spalled concrete totaling 4 square feet by 1-in deep located on
the top slab. One of the areas, 10 inches by 8 inches in size,was a new spall which
developed after the 2007 assessment.
Under Side of Slab:
■ There were three new areas of spalled concrete,totaling approximately 5 square feet by
1-in deep,located along the east edge of the loading dock. Within these spalls,there were
approximately 9 linear feet of exposed reinforcing bars with surface rust.
■ There was 1 new crack(approximately 1/8-in wide)totaling approximately 2 linear feet
running in the long direction at the east side of the dock. There was a rust stain on the
underside of the slab along the crack and efflorescence was visible in all cracks.
Steve Kasle
10/25/11
Page 3
■ The bottom flange of the channel was rusted.
Control Building-West Loading Dock
Top Side of Slab:
■ No deterioration on the top of the slab.
Under Side of Slab:
■ There was one new area of spalled concrete approximately 6-in by 6-in by 1-in deep
located 4-ft from the south end of the dock.There were 2 reinforcing bars with surface
rust totaling 1 linear foot within the spall.
Discussion and Recommendations
Headworks
Some attempt has been made to repair the loading dock since the inspection in December 2007.
These have broken up and the loading dock shows signs of further deterioration. Photographs 1
and 2 were taken of the top side of the loading dock during the first inspection in 2007. The
previous repairs and additional spalled concrete areas are visible.in Photographs 3, 4, and S
taken in October 2011 at the same location.
CDM recommends repairing the top and underside spalls and cracks as follows:
1. Remove the loose,previous repairs down to intact concrete.
2. Remove the spalled concrete as specified.
3. Where reinforcing steel is exposed within the spalled concrete,the reinforcing steel
should be cleaned and incorporated into the new repair mortar as specified.
4. Repair the cracks by injecting epoxy adhesive.
S. Roughen and clean the substrate concrete as specified.
6. Install new polymer modified repair mortar to restore the concrete members to their
original configuration as specified.
Application of the anti-skid coating indicated on the architectural drawings will prevent further
ingress of moisture and salt,and should stabilize the condition of the loading dock.
Control Building
Observations of the top side of the East loading dock indicated only one small additional area of
deteriorated concrete since the 2007 assessment. Deterioration was not noted in the 2007
assessment on the underside of the dock,however,the recent site inspection indicated a few
Steve Kasle
10/25/11
Page 4
areas of spalled concrete. The concrete cracks and spalls noted on the underside of the slab
should be repair as stated above.
The West loading dock at the Control Building indicated one area of spalled concrete on the
underside of the slab. This spall should be repaired as stated above.
Photo 1: Headworks Loading Dock-North End(taken in Dec.2007)
Steve Kasle
Page 5
t.
__'��-�^ �;:;;,..�•' to ;`F�I
L
1
1
• • 2: Headworks L•ading Dock • • 1 1
Steve Kasle
10/25/11
Page 6
Photograph 3: Headworks Loading Dock-Looking North(taken in Oct.2011)
Photograph 4: Headworks Loading Dock-South End(taken in Oct.2011)
Steve Kasle
10/25/11
Page 7
Photograph 5: Headworks Loading Dock-South Edge(taken in Oct,2011)
CDM
South Windsor Field Office
1 Vibert Road
South Windsor, Connecticut 06074
Tel: 860-282-0123
Fax: 860-291-8795
To: Stanley R. Bujalski*Manar
PE
Project Manager
From: Stephen Kasle
Site Constructio
Date: October 24, 2011
Subject: Town of South Windsor Connecticut
WPCF Upgrade
Contract No C-503
Change Order Request No. 042
Additional Concrete Repair Work
Headworks and Control Building Loading Docks
Stanley,
The Contractor shall furnish the necessary labor, materials and equipment to make the following
concrete repairs to the Headworks and Control Building Loading Docks as outlined in the attached field
sketches SK-S-17 thru SK-S-20. The Contractor shall furnish'a credit for the original concrete repair
work shown on sheet S-HW-1. The additional work required to install the Dock Bumpers and furnish
additional railings at the Control Building will be forward to the Contractor in the near future. A
specification is included for crack repairs, in which those areas are also identified in the sketches.
All work shall be in accordance with the Contract Documents.
Please submit your cost proposal by November 01, 2011.
If you have any questions, please contact us.
Cc: C. Fredrick Shaw Town of South Windsor
Tom Joyce CDM
COR Field File
CDR No.042 Additional Concrete Repair Work @ Loading Docks 10-24-11.doc
SECTION 03741
MODIFICATIONS TO EXISTING CONCRETE—CRACK REPAIR
PART IGENERAL
PART 2 PRODUCTS
2.01 MATERIALS
A. Crack Repair Epoxy Adhesive
1. General
a. Crack Repair Epoxy Adhesive shall be a two-component; solvent-free,moisture
insensitive epoxy resin material suitable for crack grouting by injection or gravity feed.
It shall be formulated for the specific size of opening or crack being injected.
2. Material
a. Properties of the cured material
1) Compressive Strength(ASTM D695): 10,000 psi minimum at 28 days.
2) Tensile Strength(ASTM D638): 5,300 psi minimum at 14 days. Elongation at
Break-2 to 5 percent.
3) Flexural Strength(ASTM D790): Flexural Strength(Modulus of Rupture):
12,000 psi minimum at 14 days(gravity);4,600 psi minimum at 14 days
(injection)
4) Shear Strength(ASTM D732): 3,700 psi minimum at 14 days.
5) Water Absorption(ASTM D570-2 hour boil): 1.5 percent maximum at 7 days.
6) Bond Strength(ASTM C882): 2,400 psi at 2 days dry cure;2,000 psi at 14 days
moist cure.
7) Effective Shrinkage(ASTM C883): Passes Test.
3. Approved manufacturers include:
a. Sika Corporation,Lyndhurst,NJ-Sikadur 35 Hi-Mod LV.
I 180644666 03 741-1 10/24/11404Y44
PART 3 EXECUTION
3.01 CRACK REPAIR
A. Cracks on horizontal surfaces shall be repaired by gravity feeding crack repair epoxy adhesive
into cracks per manufacturer's recommendations. If cracks are less than 1/1 6-in in thickness they
shall be pressure injected.
B. Cracks on vertical and overhead surfaces shall be repaired by pressure injecting crack repair
epoxy adhesive through valves sealed to surface with crack repair epoxy adhesive per
manufacturer's recommendations.
C. The cracks shall be cleaned by sandblast,water jet or high pressure air to remove loose matter,
dirt, laitance,oil,grease or other contaminants.Prior to injection of the crack a surface seal of
epoxy paste shall be applied to the face of the crack. Openings in the surface seal(entry ports)
shall be established along the crack. The distance between entry ports shall not be greater than the
thickness of the slab. Injection shall begin at the first port at one end of the crack.For vertical or
inclined cracks this will be the lowest point of the crack.Injection shall continue at the first port
until the injected epoxy begins to flow out of the second port in line. The first port shall be
plugged and injection started at the second port. The entire crack shall be injected with the same
sequence. Continue injecting crack and do not stop until crack is completely injected.After the
injected epoxy has cured,remove or cut off ports and grind flush with adjacent concrete surface.
There shall be no indentations or protrusions caused by placement of entry ports.
D. The Engineer may take random 2-in diameter core samples for visual inspection and strength
testing to verify adequacy of repairs.
END OF SECTION
I 1806-44666 03 741-2 10/24/1144t24 4
PW XM1\Documents\1806\44466\04 Design Services NM_Record104 Structura1110 CADD\SCBPL001.dwg
GR\0
IF T
NpO
0
a
Cam'N"—c==m—PLANT NORTH
0
c
y D
N
�s'-0„
D I I
m
O / ..{,.ZY ---------------.--- -�'�,
C
U
C�
W �
0 Q �
o CONCIRETE ALLED REPAIR SPALLE REPAIR SPALLED
CONCRETE CONCRETE AT
W � 10"x8"x1"D 12 x9 x1 COLUMN BASE
I p —I
-P z 12"Wx4"H
NOTES:
po 1. FOR REPAIRS TO UNDERSIDE OF
v z �
LOADING DOCK SEE SK—S-20.
2. REPAIR SPALLS PER DETAIL ON FIRST FLOOR
S—GD-3. NEW STAIR NOSING
i
PLAN (TYP x 3 STAIRS)
z 3. REPAIR CRACKS PER
rn
c�
m SPECIFICATION 03741. 1/4" = 1'-0"
r
A
N
---------------------
_71
t
2�ooZ
REPAIR 3'-0' LONG
Z cP v�C� t x }I;" CRACK w/
o "' c^G� EPDXY ADHESIVE
REPAIR
2'-6"x1'-6"x1"D t,.
CONCRETE SPALL REPAIR 6" LONG x
Y8— CRACK w/
t EPDXY ADHESIVE
REPAIR 8" LONG
t x )�" CRACK w/ ,I
EPDXY ADHESIVE
REPAIR REPAIR 3'-0" LONG
2'-0"x10"x1"D CONCRETE SPALI x A" CRACK w t EPDXY ADHESIVE
a
REPAIR REPAIR 1'-6" LONG
2'-0"x6"xt"D
i CONCRETE SPA I x Ya" CRACK w/
o EPDXY ADHESIVE
0
o.. I NOTES:
_ t o� 1 FOR REPAIRS
R SEE SKTO TOP OF LOADING
2
e' 2. REPAIR SPALLS PER DETAIL ON
8
S—GD-3.
- 3. REPAIR CRACKS PER SPECIFICATION
d 03741.
r---------------------
� t
d
y
0
8
REFLECTED UNDERSIDE OF LOADING DOCK
_ PLANwpcf-
DATE OCT 2011 S WIND-OR CT :RFI FIGURE
NO.
1/4" = 1'-0" SHEET N0. LOCATIONCDM Cam Dresser S McKea Ina S—HW-2 D—F,1-21 SK—S-18
4
A
N i W14x30 i i
------- +ll
0__4)
------
REPAIR co 4
41.x2"xO.5"D S—HW-1
v oZ CONCRETE SPALL
(2 LOCS) to a
O cP�y�G� REPAIR 12"x8"x1"D
o CONCRETE SPALL p� �` REPAIR ✓
FOR DETAIL SEE
O SHEET S—GD-3 9'-0" i 4'-6"x3'-0"x
3"D CONCRETE
REMOVE LOOSE, 1' 6" '-6" 1 q" PALL
DETERIORATED
CONC & REPAIR i
2.5"D CONCRETE
PALL '/ I rn
N O s I 0/2' O
dx' j N
O
3 +
O
C7 I N M
O
A
REPAIR
= il, 1'-0"x1'-0"x1.5"D
CONCRETE SPALL
1 REPAIR 3'-0" LONG
o �
N i x 0.25"W CRACK
I +� w/ EPDXY
a d N T
ADHESIVE
1. OP OF STEEL EL 43.71 UNLESS
REPAIR 4'-0" LONG INDICATED THUSLY t 0'-0")
z -------�- -- ---- ----- x 0.25"W CRACK
CL 1 TON � 2. FOR REPAIRS TO UNDERSIDE OF
MONORAIL W74x30 w/ EPDXY LOADING DOCK SEE SK—S-18.
E ADHESIVE REPAIR 10"x6"x2"D (+0'-4") 3. REPAIR SPALLS PER DETAIL ON
ONCRETE SPALL S—GD-3.
2 4. REPAIR CRACKS PER SPECIFICATION
$ 03741.
MONORAIL s-Hw-1
s
PLAN WPCF
X 1/4" DATE OCT 2011 S WIND SOR CT 1271]
FIGURE
SHEET NO. LOCATION
a
cm Cam Dresser A McKee Inc. S—HW-1 A—B,1-2SSK—S-17
i
PW XM1\Documents\1806\44466\04 Design Services NM_Record\04 Structural\10 CADD\SCBPL001.dwg ;
19-0
NPD
F1
0) C--}'—'N--C'=-PLANT NORTH
s
v
m C
y D
REPAIR SPALLED
1 fi'-D" CONCRETE
I 1'-6"x1'-0"x1.5"D
� D
m
.-- _------...._._._....__...._._.-.T I I ———
O —_._.----.---
O
m REPAIR SPALLED i
c� ra CONCRETE
W Z z 1'-0"x10"x2"D
O REPAIR SPALLED
CONCRETE
o REPAIR 3'-0" LONG 2-0"x6"x1"D
o x Y8" CRACK w/
z -1 EPDXY ADHESIVE I --v— REPAIR 2'-0"
LONG x Y8" CRACK
NOTES: / EPDXY
zo X 1. FOR REPAIRS TO TOP OF ADHESIVE :r
LOADING DOCK SEE SK-S-19.
2. REPAIR SPALLS PER DETAIL ON REFLECTED UNDERSIDE OF LOADING DOCK
S-GD-3.
Z o 3. REPAIR CRACKS PER PLAN
m SPECIFICATION 03741. 1/4"
0
_ s
Nickerson
;cicerson PROPOSED CHANGE ORDER
No. 00178
GENERAL CONTRACTORS
TITLE: Loading Dock Repairs DATE:1/11/2012
PROJECT:South Windsor WPCF Upgrade JOB: 500-422
TO: Attn:Thomas A.Joyce,P.E. CONTRACT NO:1
Camp Dresser&McKee,Inc.
Jefferson Mill
670 N Commercial Street
Manchester,NH 03101
Phone: 603-222-8345 Fax:603-628-7675
RE: Issue: FF247
_l.?E3CRIP`TTON''(}F>PR.t�POaAL�".:, . �-.�:.:• . ..• . . -. • ..: :
This Proposed Change Order is for the additional cost of concrete repair work at the Headworks Building and Control Building
Loading Docks per the COR#42A.
�teiri DesoiIpflon• ..: ..:;`:.., uaniity Units -Price 'Net Amotinf
00001 Add Try Works crack Injection IA00 LS $1,500.00 $1,500m
00002 5%Overhead&Profit on Subcontractor 1.000 LS $75.00 $75.00
00003 Nickerson Added Work Spreadsheet Summary 1.000 IS $3,880,00 $3,880.00
00004 15%Overhead&Profit on Nickerson Work 1.000 LS $582 00 $592 00
00005 1%Bond Cost 1.000 IS S60.37 $60.37
The foregoing proposal includes direct labor and material costs only.
Because this change order may affect the performance of our contract work, Unit Cost- $6,097.37
C.H.Nickerson+Co.,Inc.reserves the right to seek compensation for any Unit Tax: $0.00
such impact costs which may result and to request an extension of time Lump Sum: $0.00
if necessary when these Items can be assessed.
This proposal is valid for 30 days. After 30 days,this proposal Is subject Lump Tax: $0.00
to change for any price Increases which may apply Total: $6,097.37
APPROVAL:
�r
BY: By:
Thomas A.Joyce,P.E. ey uja d, E.
Dates Date: 1/11/2012
cc: M47
Field
Office C.H.Nickerson+Co.,Ina-49 Hayden Hill Road-PO Box 808-Torrington.CT 06790-0808
Phone: 860-489-0455-Fax:860496-0483-,PLM.0204803-Pi-8HM.005805SMI-ANEOE
SOUTH WINDSOR WATER POLLUTION CONTROL FACILITY
FIELD FILE#247-Loading Dock Repair Work
UNIT TOTAL UNIT TOTAL ITEM
DESCRIPTION QTY- UNIT PRICE MATERIAL PRICE LABOR COST
MATERIAL:
Pea Stone Bags 12 Bags $4.85 $58.20 $58.16
Cement 4 Bags $9.79 $39.16 $39.14
Sikatop 122 B 12 Bags $19.03 $228.36 $228.36
Sikatop A Component 12 Gal $26.21 $314.52 $314.52
Angle&Fasteners for Dock Bumpers 1 LS $400.00 $400.00 $400.00
SUB-TOTAL MATERIAL $1,040.24 $1,040.18
EQUIPMENT:
Small Tools(3%LABOR) $147A8 $147 48
Demo Saw 8 HR. $20.00 $160.00 $160.00
Pickup Truck 22 HR. $15.00 $330.00 $330.00
Mini Grinder 12 HR. $8.00 $96.00 $96.00
SUB-TOTAL EQUIPMENT $733.48
LABOR:
Carpenter Foreman-Dock Bumper instal. 16 HR. $84.00 $1,344.00 $1,344.00
Labor Foreman 4 HR. $70.00 $280.00 $280.00
Laborer 30 HR. $56.00 $1,680.00 $1,680.00
Mason Foreman 2 HR. $95.00 $190.00 $190.00
Mason 18 HR. $79.00 $1,422.00 $1,422.00
SUB-TOTAL LABOR $4,916.00
SUB TOTAL MATERIAL,EQUIPMENT&LABOR $6,689-66
Original Work @ 42%of Total $2,809 66
Additional Work @ 58%of Total $3,880.00
JOB
C. H. NICKERSON & CO., INC. sHEETNO' OF
TORRINGTON, CT 06790 CALCULATED BY DATE
CHECKED BY f� DATE
€
£ € # €
, ! z
_...._».r...__-<-...,jj///`,"J.J_!• <'{ -T"-F•••ii ...1L.y...C:i:•_ =..e._ .......... __ _ ._.! '.'1 4="' x •�� i : "'_•- _- __ ........f...... __.t..•.,......
. _`
? _
..(..._._...`...(„�bj.....«, .. ___._._ .. _ _ 40-
• i F
-
�i
.,_„._'-i'---..-a._.........«......_..§ ...___-..6e...�ar�{�{.._..._...«.__....:.._._.?____..�..._.._..«.. .........��X..��Y�..?.°,...xC�..3..—._ ��t.__.jy�, /jb_....,»F7.. .... `r(- ..........
t
t (
...._..__S_._._.....e-..._......F.........._3..-_-..._i._....__.:......_..._-._..._...i....
I
y..._..._.._.__._.p.__.......s,..__-_"{_. .€....... .....A.r... .« ....i.. .. 1.'�!�•MrF__. _._"• �{ -i•--. •� -•--d... .....b.....«.•...r._.[_ _...E... ....'__ ; # _ .....
?
oil
I r
< 4� �
i , I Q c •//y,€
? i
�3 {{
cko
e
_._.•-w-.-.-••._. { &.._..._ FJn''•I•1.. .{-i`__«_.._ _ If./]lam] ` _ '�+_/��4G+�£ { r _ -_ .t,
s '
: i #
..«-..«.«_i•__... ..__..i•........_.q»........._.£........_..._....._...i-_•-•• _.___ _•__.3...._.._.i___ - ... ` _ .d._.._.._a.«...._.._{.._.._.._.i.._........=s__•-_....e.............;..._......,.5......._............._>..........._»._._...
#
Yi
i hi
i
FR�f101.1#SIep451£xbJMS•1{PdbA} - .
JOB
C. H. NICKERSON & CO., INC. SHEET NO. OF
TORRINGTON,CT 06790 CALCULATED BY DATE
CHECKED BY DATE
SCALE
..................... ..................... ......................
............. ------- ...........
..........
49
ALI�
-O-l-----T'-7...;.t... 91
44 ............. ..........
...............................................
..................
.....
.....................
.......... ..........
- I—-I-----
.........4_
i ..........
.......... .............. ..... -----
... .......
r
..........
.................... ..f.
........................... ..
..........................................-----.--.--.--.-..-.-
-----------
-
....... ...—......-...-..-..
4
. ... .....
--.--..-.—....... ......... ......................
....
o_op
M...............
.....
...........4-__+__j...........
.......... .......
t
t'KUl•'USHL Yage t or i
Dry Works, Inc.
Certified WBE-OBE Commonwealth of Massachusetts
State of Connecticut p
State of Pennsylvania �17
273 Riverside Avenue-2"d Floor—Bristol,Connecticut 06010
Mailing Address: P.O.Box 4070--Bristol,CT 06011-4070
PHONE:(860)682-8486 FAX(8W)640-1052
Mobile Cell: (860) 919-4331—Monica Rourke
PROPOSAL SUBMilTI'ED TO: C.H. Nickerson&Co.;Inc. DATE: 11/30/11
STREET: 49 Hayden HUl Road JOB NAME: So Windsor Wafer Pollution Control Facility Upgrade
P.Q. Box 808 1 Vibert Road,South Windsor,CT • '
CITY,STATE,ZIP: I Torrington,CT 06790 PHONE: 860.489.0455 I FAX: 110-496-0483
WEh6MYPROPOSErORRATSYMrfRMLANOLABdYQ�INACMRDAA4XW1THVMNCA77tJYYSBELOW,M 77JERMCIF
One Thousand,Five Hundred Dollars and no cents DOLLARS $ 1,500.00
PAYMENTS TO BE MADE AS FOLLOWS: Net Thirty 30 Days
Work Description:
Provide all labor,matenialjnd equipment necessary and incidental thereto to Fill and patch approximately 15Ieet of random
cracks as directed by the engineer in various areas of the concrete construction at the South Windsor WPC Facility.
and as described herein:
Material: Eva Pox Epoxy Paste 22 as approved by Camp-Dresser&McKee on 11/29/2011
2-component,100%solids,moisture-tolerant,high-modulus,high-strwgtic,structural,smooth-paste epoxy adhesive
(1) Surface prep area in accordance with manufacturer's recommendations prior to installation;
(2) Apply epoxy paste as deep into the crack width as possible and continue application in accordance with product data
Y information for Oiling structural cracks;
(3) Trowel to a smooth surface,
Wuslons: Grooving out existing cracks
Amozft=Whoa sal. Signature:
The above price and payment terms,spedfications,and conditions Title:
are satisfactory and are hereby accepted.You are authorized to do
the work as described and mutually approved.
Date:
Signature:
Date; November 30, 2011 Title:
President-Owner
ADDITIONAL FIELD WORK AUTHORIZATION
CAL NICKERSON&COMPANY,INC
P.O.BOX 809
TORRINGTON;CONNECTICUT 06790
PIIONE 489-0455
�iRRcroR w1ttE PHOM DATE
STta ET MON" f aaiJOe Ea 9
GCY STAN SMEET
flEtDfNEf C1IANGEOHDERf CRY sulE
You am hereby authorized to perform to k cowing spedwy desaibed ad&Swnal wok
tVf//C iZf��hn ty��
s 1��c01, OUANnV umrrpnlm TOTAL
AMMONALCY GE
payr��t,�mach aEs.taAurtcs:. .ona . _{cane.&Material}..• Xf.►nnJ?�}. .
Abow adduional work to be pe u or oo a in original contract vote=otherwise stir Ated.
Autit4riiaig.s it 4i not-_
�..._ ban-, .. g612-
_EtLwft MM to furnish labor and mrate is Corn a In r its�e.
Aethorized Signature 'Date 20
VOTE TWftvkion'bera wpaftof and ktoadwmnoewfth,theads&gmakut
ADDITIONAL FIELD WORK AUTHORIZATION
C.M.NICKERSON&COMPANY,INC
P.O.Box 808
TORRINGTON;CONNECTICUT 06790
PHONE 480-0455
�TORwiME MOW BATE
"I
MY STATE STAteer ,
l��tlfFTLE1 Cl1M1GEORDC4t1 pnr STATE
You are hereby authodud to PO tarm the WQwkQ specKc*described s"tionai wo&
• t.A+�l�G�C� t7�G't�- iZ.E�i4i 2 u9c�f�k.
(oitl?�D� WANitTY tttt etiu Torat
r• came j;z 4.
r 7+ 49- hag
AD giARG9f9fL Qy9 EQj3 .
.�._ _ e$yit�!ki�it�tlirti�asiQt .tAna . ;(t'+mae.�.htat�iag.•- �t7nitP.�Scesj .
Above ad2ionat work to be co ns speataed in octginat ocntract unless ottuawise stipsdated.
. s rnEsttvvATTstq
1 ._...._...20
we to turd$h tabor and matwiats comMeln
augoted Signature Vat$ 80
NOTrc TnlcAe�ision•6ecomes part ot..na In oadormt,xe wit,.d+a�tSGnp oonKaa. •
1
HARRIS
illlil 1• 1:: 4 11
i .M
:i 11
1 d1 1 { 1 t Itl 11I
EMTw-
• r 11 r
r T�:,"`±r ,-'.,,E 'e e \. r(,c t-'e - • '.�!` '�a 1 --r
1. e..o a e z-.i r • e . 6 e +TSG �,m'k"
cast ZY,.e_. _ ''" �.k� {`y2»m •y-.ram.. <L.S, .R, .nC.e�'�9 .�1f.
12
12
24
alr
sf
.iZY�lkwF�'r-'�`3'4 yr stj�
IVED
• co
SRB
Gc,_.r.�?k• Vej» ,+-r ■ r '?1'`F�... ,� - .
in � • Z • KK
M tL2' ,E wv
TR
w�a'� � Vi "'t.i9.Z� Y `"� f�;L.,(. -_ y�{} ".V'+•�'v�"'a 1
PAY YOUR BILL ONLINE AT HTTP:I/WWW.AHHARRIS.COM VIA CREDIT CARD OR CHECK.
MAILED
PAYMENTS BY CHECK SHOULD
BE
A.H.HARRIS&SONS,INC, P.O.BOX 418827,BOSTON,MA
t 8827
111 111
- WARE-HOUSE TRANSFER
AM (� (( P.O.Sox 418827
I-{ l,ti,l WLA.IO Boston,MA 02241-8827 ' . ! `21
( Amhm 218435-00 1 .
11/07/11 1
4 cusr�:245200 Date and Time printed- 11/07/11 14:49
pt
E ooRRE vwotr,�cEro. A.N. Harris & Sons, Inc. V
BILL TO. CH NICKERSON & CO INC M010 Newington Nil
�
PO BOX 808.. 91 Holmes Rd
TORRINGTON, CT 06790 Newington, CT 06111-1833
(860)665.9400
srmlpm- CH NICKERSON & CO INC
WATER POLLUTION CONTROL FACILI M016 New Haven OLD ACCT#988200
1 VIBERT ROAD
SOUTH WINDSOR. CT 06074
z Oar Truck I il/07/11 I I NET 30
t� ::r.:•a:•::•:•::::.::•:::::::�:. �.. � 3
....,... .....:.............
: I`:.(Y3.fx.I#d1:# '•Q1d .•::::: (yIy:dti;:::`lxslr P0. JEtF•:::•:::•.
::..:•
�••. _
{i$f 3 7a
018 0
7 ::..1::...r;:::..;. .......rr.�-�..•......•....'....•....................:.........:.:.:.........................�....: . 10 ' 2::2
... ..... ...... ...........
...:.... ...... ":':::::....
;22/DJC::
0 189-5 ao
; : :; : ::
:. :
7 -�:. LDS.. H :B11�~i)N �••�4�.`�• �L� 1 0 756
.................................
....... ......... ..........
.. ...............::::::.
... .. ..... .....
';.
......
:ti:^
:.R
.........•....':t.IJ:::..
(fw�
V
.'.: :'.-
i
%
.':r
.............
....... ...
�.r•:. r
:iiti'!tii
i
:t1..
::li•
..ti
f{[
i
I - •
. ... . ..... . ..........
•:.A:.: :.................:.:::::.:• ...
:•......:.......
3
E
fp ;T
F
t
F '
:4T
;.
a _ WeifPicker Last P '
j.': yyp. ........ . ... Date .... •' •.::::::.........................:...- :;s�3;a ;� Weight
i �`�ta��Q .� NINE'
F ,Notwiahsta"rig anydifferentor addttIonal terms itkvtmay he contained in yourorde,your 91
oller is accepted only on the express condition that you assent to the terms all
candiCons contaited on-dtts pegs and on fhe reverse side hereof.s ect to i t/2%per month lade charge if not paid within terms.Wterchandise cannot be returned without
•, , , ao r Ott wA 1„h u d nn mit crn,nt nnnrs kisoecdon and wttt be subject to a restocking charge.
�k MOICE
SUPERIOR PRODUCTS DISTRIBUTORS, INC.
rriaiwr��nw■mw��...�.�� 'MV1/OICEpATE It•1VOtCE PRJAABER
..,and the SUPERIOR family of companies
■Superior Equipment&Supplies ■Superior Hearth,Spas&Leisure 11/0.9/11 S2115015.001
■Superior Instrument r ConQuip Technologies
■Superior northeast ■Energy Resource by Superior PLEASE REMIT TO; PAGE NO
■.Superior east ■Plasticrete Superior Products
1403 Meriden-Waterbury Road,P.0.Sox 57,Milidale,CT 06467 P O. Box 57 1
(860)621 3621 (800)937-7734 Fax(860)621-1922 MBldale, CT 06467-0057
WWW SuperforMetwork.com
' pfo � °�uerrorheast
BILL. TO: SHIP T0:
C. H. NICKERSON & CO. , INC. C. H. NICKERSON & CO. , INC.
P. O. BOX 808 P. O. BOX 808
TORRINGTON, CT 06790 TORRINGTON, CT 06790
CUSMWR ORDER 6MMM ORDERED BY .1OF1 REFERENCE
500-422 SOUTH WINDSOR WPC
ORDER TAKEN BY SHIP VIA SIGNED FOR BY ORDER DATE SHIP DATE
EOFOR PICKUP AT SNE KIM 11/09/11 11/09/11
SHIP QTY DESCRIPTION DISC NET uNTC PRICE Ng AH MIT
12 bg PROMASONRY PEA STONE (60#/BAG) 4.•847 58.16
t. 4 bg TYPE I--II CEMENT (LEHIGH) 9.786 39.14
a:.
E( LD
C.H.. NICKEJ ZSCIN & Co.,liNC.
1 28 011
BCN Q. Jhi1Vl C) RB • SJE
GAW [ AM El
p/GEM 0
KOH El APB
❑ R Q" GMC❑
El `� 0 O
Q 0
SubtOtal. 97.30
1.54F per month late Charge. All Claims for errors must be wade within Shipping 0.00
I returns for credit must be authorized in advance and are subject to Simi ShippHandling
z Stems are fiat returnable for credit. SPDI will not accept unilateral claims 0.00
ces. Product warranties are limited to those provided by the manufacturer. Sales Tax 0.00
Implied, in connection'with this sale. WWI explicitly disclaims any
SS FOR A PARTICULAR PURrosB, and under no Circumstances will it accept
:Sea. In the event that legal action is required to-effect collection, Amount Due 97.30
lection including reasonable attorneys fees.
1
3
i
si Southington South Windsor ■ Norwich ■ Cheshire Avon
• r •wi.
DELI VERY TICK f' ;
SUPERIOR NORTHEAST Order Ot SR1i5015.+t0-1
24 J'EFFREY DRIVE e
# SOUTH W I NDSOR, CT 06074 Printed: 08.1 i :37 09 NOV
860--28E-7688 Fax 660-282-7698 page # t I of i
# Sold To; atrip To
' C. H. NICKERSC3N & CO. , INC. C. H. NICKERSON INC-.
P. O. SOX SOP, O, BQK 80h, CO.', }
'TORRINGTON, CT 06790 TORRINGTON, CTa067.96 �•
Phone; 860-•489-0455 J S � � ILI.
A a• S 4 •�� ti t "S
(7 dere�f By OrOwr hate Ship at's Ship Via Order, Taken $ 1�`
i1J�l9/'II 11/09/11 PICKUP AT 3NE GEORGE FORTIN
• •�. - r .t'at4
,fob Reference Alt; Tel Alt Tel :De-livery Cbmmit��nt
SOUTH. WINDSOR -WPC
-ordered Shipped product Discx•iptiun
12•.bg' is PROMPSONRY "FEA STOh#E. (fart#/BAG)
4 bg 4 TYPE I-II CEMENT (L.EHI(*+)
Ke
,r E•t t of e r Signature-.
' .. ...J '
a s ignature.
fgned for• 'iV: KIM ,.': ;... ,� ....•:..„ ,,:,�..... � ,
deceived in -g-oad condition. All. c"4aims far shoe"cages yr er^r errs must.�
fWith-ih 48 hours of receipt of mater*xal. All. returns for credit must b ,
aut-horizod -in, advance.. a' are subj' t to berrtrpany Returned Goads Policy.
toad' 'By C4 Check By Privets Prive14 Arri ved'at .Job Time Glut'
7--
CDM
ith
South Windsor Field Office
1 Vibert Road
South Windsor, Connecticut 06074
Tel: 860-282-0123
Fax: 860-291-8795
To: Stanley R. Bujalski, PE
Project Manager
From: Stephen Kasle - G�
Site Construction Ma ager
Date: January 16, 2012
Subject: Town of South Windsor Connecticut
WPCF Upgrade
Contract No: C-503
PCO No. 178 Structural Repairs to Loading Docks
Headworks and Control Building
Stanley,
We have received your Proposed Change Order No. 178 dated January 11, 2012, regarding the
additional cost of$6,097.37 for structural repairs to the concrete Loading Docks at the Headworks and
Control Bldg on a time and material basis and find the cost acceptable.
This amount, $6,097.00(rounded down)will be included in a forthcoming Change Order for the Owners
signature.
If you have any questions, please contact us.
Cc: Fred Shaw Town of South Windsor
Tom Joyce CDM Smith
PCO Field File
SW WPCF PCO No.178 Loading Dock Repairs Response Memo 1 1612.doc