RE: AVERY STREET PUMP STATION
Dear Mr. Jacques:
Pursuant to the South Windsor Water Pollution Control's
precondition for the Town acceptance of the Avery Street Pump
Station, enclosed herewith is a punch list of items pertaining to
the station that must be corrected or repaired before the Town
can take over ownership and responsibility for the station on
July 1, 1992 .
If you have any questions, please contact this office.
very truly yours,
C. F. Shaw, Ass't. Director
Public Works/Pollution Control
CFS:bmr
Enclosure
cc: W.P.C.A.
Michael J. Gantick, Director of Public Works
Glenn La Brecque, Plant Supervisor
hEMORANDUH MARCH 20, 1992
T0: CHARLES F. SHAW, ASS'T. DIRECTOR OF PUBLIC WORKS
FROM: GLENN P. LA BRECQUE. PLANT SUPERVISOR
RE: AVERY ST. PUMP STATION REPAIR PUNCHLIST
DEAR FRED,
THE FOLLOWING INFORMATION ARE ITEMS THAT. SHOULD BE RECTIFIED
BEFORE THE TOWN ACCEPTS THE AVERY ST. PUMP STATION.
1. THERE IS.A GREAT DEAL OF SETTLEMENT IN THE DRIVEWAY. THERE ARE
LARGE SINK HOLES BEHIND THE BUILDING AND THE VALVE PIT THAT ARE
VERY DANGEROUS.
2. AN INSPECTION OF THE BASE FOR THE EMERGENCY GENERATOR SHOULD BE
MADE. THE GENERATOR SEEMS TO BE SETTLING TOWARD THE PANEL BOARD.
3. THE WATER METER FOR THE BUILDING WATER SUPPLY SHOULD BE MOUNTED
PERMANATELY. PRESENTLY IT IS HANGING FROM THE FENCE.
4. THE #2 PUMP PRESENTLY IS IN THE "OFF" POSITION. WHEN THE PUMP
IS RUN MANUALLY THERE IS A GREAT DEAL OF VIBRATION. THIS COND-
ITION SHOULD BE RECTIFIED PERMANATELY.
5. THE SAFETY BAR ON THE CONTACTOR FOR THE #2 PUMP IS MISSING.
6. THE EMERGENCY GENERATOR MUST BE INSPECTED BY AN AUTHORIZED
GENERATOR SERVICE. A REPORT TO THE TOWN SHOULD BE FILED, AND
ALL NECESSARY REPAIRS MADE. TRANSFER SWITCH SHOULD BE IAPECTED.
7. WHEN THE #1 PUMP RUNS THERE IS MUCH VIBRATION AND TURBULANCE.
CHEK VALVES SHOULD BE CHECKED FOR POSSIBLE BYPASS.
8. THE TOP CAP FOR THE #1 PUMP CHECK VALVE IS BADLY CORRODED FROM
POTTASIUM PERMANGANATE AT THE POINT OF INJECTION. INJECTION
INJECTION POINT SHOULD BE CHANGED TO A LOCATION COMMON TO BOTH
PUMPS.
9. THE POTTASSIUM PERMANGANATE SATURATOR SEEMS TO BE LEAKING AT
VERY BOTTOM. PERMANGANATE IS COVERING. THE FLOOR AND LEAKING
THROUGH THE FLOORV JOINT TO OUTSIDE THE STRUCTURE. THIS CONDI-
TION MUST BE CORRECTED.
10. ELECTRIC HEATER IN THE BUILDING IS MAKING FAN NOISES.
11. ALL METAL WORK ( HATCH DOORS, TOP COVER TO WETWELL, VALVE PIT
DOORS, PIPING, ELECTRICAL BOXES, ETC. ) SHOULD BE SANDED,
RUSTPROOFED, AND PAINTED.
12. SAFETY LATCH BARS ON THE BILCO HATCH DOORS OVER THE WETWELL
SHOULD BE REPLACED. THEY ARE BADLY RUSTED, AND NO LONGER
HOLD THE HATCHES IN PLACE.
13. THE INTEGRITY OF THE TOP METAL COVER THE WETWELL SHOULD BE
CHECKED DUE TO THE BAD RUSTING CONDITION. THE COVER SEEMS TO
FLEZ WHEN STOOD ON.